| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC ok |
| 2 | L2₹5.2 LRejected-Finance | ₹5.2 L | L2 | Rejected-Finance HIGHER |
Tender Value
₹5.7 L
EMD Value
₹11,370
Closing Date
12 Aug 2026, 10:00 amClosed
Padam Bhushan
Muncipal Corporation Sonipat
1300 - Estimate for construction of inspection Chamber for water supply Valves in estren side MC Sonipat
2026_HRY_538759_1
2026EB5F970B 85EE 497D A973 D1D502EC1D60292ULB
Open Tender
Civil Works
Works
180 days
Sonepat
2 documents required · 2 mandatory
₹1,000
₹11,370
Yes
20 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
5 Aug 2026 - 7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [21.84.2]Constructing brick masonry inspection Chamber sizes as given below up to 0.60 metre average depth in cement mortar 1:5 lime concrete with 40 per cent lime mortar 2:3 in foundation cement concrete 1:2:4 benching 12mm thick cement plaster 1:2 with a floating coat of 1 mm thick of neat cement R.C.C. 1:2:4 slab 100 mm thick/cement concrete topping, 50mm thick with 455mmx455mm / 455mm x610mm inside light duty C.I. inspection chamber cover and frame weight as per I.S.I. specification painted with 3 coats of black bitumastic superior paint complete as per standard design. 2. Size 450 mm X 600 mm inside (with 455 mm x 610 mm cover and frame single seal pattern I weighing 38 kg with C.C. topping) [Through Rate] | - | Each | 4,977 | - |
| 2 | [21.84.3]Constructing brick masonry inspection Chamber sizes as given below up to 0.60 metre average depth in cement mortar 1:5 lime concrete with 40 per cent lime mortar 2:3 in foundation cement concrete 1:2:4 benching 12mm thick cement plaster 1:2 with a floating coat of 1 mm thick of neat cement R.C.C. 1:2:4 slab 100 mm thick/cement concrete topping, 50mm thick with 455mmx455mm / 455mm x610mm inside light duty C.I. inspection chamber cover and frame weight as per I.S.I. specification painted with 3 coats of black bitumastic superior paint complete as per standard design. 3. Size 600 mm X900 mm inside (with 455 mm x 455 mm cover and frame light duty single seal weighing 20 kg with R.C.C. slab) [Through Rate] | - | Each | 5,438 | - |
| 3 | [21.85.2]Extra for every 0.30 metre depth of Inspection chamber 2. 450 mmx 600 mm inside [Through Rate] | - | Per 0.30 metre depth | 847 | - |
| 4 | [21.85.3]Extra for every 0.30 metre depth of Inspection chamber 3. 600 mm x 900 mm inside [Through Rate] | - | Per 0.30 metre depth | 1,138 | - |
| 5 | [6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 1 | cum | 3,975 | ₹3,971.03 |
| 6 | [6.1.7]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 7. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) [Through Rate] | - | cum | 2,192 | - |
| 7 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 1 | cum | 4,374 | ₹4,369.63 |
| 8 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] | 1 | Kg. | 68 | ₹67.93 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_617959.xls
BOQ • 0.29 MB
AD0173570.pdf
Additional Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].