Loading…
Loading…
Tender Value
₹10,518.28
EMD Value
₹1,900
Closing Date
25 Sept 2026, 6:00 pmClosed
Executive Engineer, P. H. Works Division, Tharad
Demolition of Unsafe RCC Sump, Staff Quarters & Pump room at Various SHWs of BK-4 Ph 2A RWSS. Under, M & R to BK-4 Ph 2A Regional Water Supply Scheme: 2026-27 (2nd Attempt)
343897
06/2026-27
Open
Civil Works - Water Works
Works
Banaskantha
7 documents required · 7 mandatory
₹600
Executive Engineer, P. H. Works Division, Tharad
₹1,900
11 Sept 2026
11 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
Name of Work: “Demolition of Unsafe RCC Sump, Staff Quarters & Pump room at Various
SHWs of BK-4 Ph 2A RWSS. Under, M & R to BK-4 Ph 2A Regional Water Supply Scheme: 2026-
Estimated Cost : Rs. 10518.28 (Negative)
Executive Engineer
Gujarat Water Supply & Sewerage Board
Public Health Works Division
Tharad - 385565, Gujarat
Volume-III, PRICE BID M&R of BK 4 Ph 2A RWSS
Volume-III, PRICE BID M&R of BK 4 Ph 2A RWSS
Bid Documents for Design, Build & Operate Contract for
BREAK UP FOR INTERIM PAYMENTS ..................................................
Volume-III, PRICE BID M&R of BK 4 Ph 2A RWSS
Name of Work:- Demolition of Unsafe RCC Sump, Staff Quarters & Pump room at Various SHWs
of BK-4 Ph 2A RWSS. Under, M & R to BK-4 Ph 2A Regional Water Supply Scheme: 2026-27
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(1) The rates and prices shall be submitted in the electronic formats given by n- procure
which is called Schedule-B. Rates and prices received in any other formats will be
rejected and the Bids will be disqualified.
(2) It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be
permitted to withdraw his bid on this account.
supplied from the by client.
(4) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as
called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and evaluation.
(7) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder
shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to Schedule-C/5
separately for Schedule-C. The total shall be in line to the price quoted in Schedule-C.
The total shall be carried forward to Schedule-B for comparison and evaluation.
(8) Wherever for a particular item the quantities have been specified payment shall be on
unit rate basis and unit variation in quantity will be paid with pro rata basis.
(9) Each item is to be individually priced online and the amounts shall be added up to
be left blank except where the item description requires the item to be priced on "as
applicable” basis. The item shall not be priced if it is “not applicable” to the bidder’s
design, in which case the bidder shall add the words “NOT APPLICABLE”. The wording
in the item description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall
allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of the bid
document) in the prices quoted for other items.
Volume-III, PRICE BID M&R of BK 4 Ph 2A RWSS
satisfactory working/safety of the system as specified, will not be separately paid for
by the Employer when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets No extra payment shall be given for any item
which is required to complete and perform the project.
pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor. The
will be considered for financial evaluation of the bid.
(12) Schedule ‘D gives the basis of interim payment for construction of works.
(13) The bidder shall be deemed to have allowed in his price for provision, maintenance
and final removal of all temporary works of whatsoever nature required for
construction including temporary bunds, diverting water, pumping, de-watering etc.
for the proper execution of works. The rates shall also be deemed to include any
works and setting out that may be required to be carried out for laying out of all the
works involved.
(14) Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to
be taken as mutually explanatory of one another.
(16) The bidder shall interpret the data furnished and carry out any additional survey work,
or investigation work required at his own cost.
(17) The prices quoted shall also include the cost of materials utilized for testing.
(18) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at his
own cost. These accesses will be used by the other contractors working for GWSSB.
prices shall include all the equipments / materials / accessories and services required
(20) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(21) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed by
the contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(24) The rates to be quoted by the Contractor must be exclusive of GST but inclusive of all
other taxes. GST should be paid extra on the admissible payment as per the approved
tender rates and condition of price variation; GST should be paid as per
prevailing rates at the time of payment. The TDS as per provision of IT rules and GWSSB
(25) The rates to be quoted by the Contractor must be exclusive of GST but inclusive of all
other taxes as per Volume-I (B) General Condition of Contract, Clouse No.
(26) The rates quoted shall be inclusive of all taxes, duties and GST, which shall not be
paid extra. The TDS shall be deducted at source as per provision of IT rules and
(27) The Bidders shall have to quote the rates in this tender keeping in view of the GST.
The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(28) The process requires that the bidder shall quote his price for the work
remain firm and fix during the entire period of performance of the contract except
price variation allowed for supply of MS pipe as per Volume- IB Clause No.
General Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the basis
of work done of individual items and rates quoted against those particular items
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in the
Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-
2010-595- (6)- M.I. Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and
shall be recovered from the running bills of the work from time to time and
remaining amount if any shall be recovered from the final bill before releasing the
security deposit of the work. The contractor shall furnish the statement showing
the quantity of quarried materials / minerals from whom purchased (with full
address of the seller) and copies of the bills for purchase to the Executive Engineer
of the in charge of the work. The contractor shall also furnish such additional
information as regards royalty payment to the competent authority.
(31) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall be
rest with the agency and required amount shall be recovered from any due
amount of the agency.
(32) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
(33) Payment should be made after fund released by GWSSB.
Signature of contractor Dy. Executive Engineer Executive Engineer
P. H. S. Sub Dn, P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID BK-4 Ph-2A RWSS
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: Demolition of Unsafe RCC Sump, Staff Quarters & Pump room at Various SHWs of BK-4
Ph 2A RWSS. Under, M & R to BK-4 Ph 2A Regional Water Supply Scheme: 2026-27
The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said
works for 5 years from the date of commissioning including defects liability period
as given in Conditions of Contract and in conformity with the drawings, conditions
Documents, including Addenda Nos.__________ (insert numbers) for Lump sum
fixed price of Rs._________________.
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained
in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out
the inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take
any action including termination of Contract and impose at his absolute
discretion any penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
Volume-III, PRICE BID BK-4 Ph-2A RWSS
4. We agree to abide by this Bid for a period of 90 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms
and of value specified in the Clause 1 of Volume-IB, “General Conditions of
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages
likely to be suffered by you in the event of the work not being completed by us in
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID BK-4 Ph-2A RWSS
Name of Work : Demolition of Unsafe RCC Sump, Staff Quarters & Pump room at Various
SHWs of BK-4 Ph 2A RWSS. Under, M & R to BK-4 Ph 2A Regional Water Supply Scheme:
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
Schedule showing the approximately quantity of materials to be supplied to the contractor
and at the government store for the or to be executed by contractor and rate which way
are to be charge.
Sr. material to Departmental Place of
Particular Quantity
No. be charge Issue Rate Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in by
the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his own
cost for loading, unloading, and transporting safety to the site of work the cement
stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available with
the dept. will be issued on request to the contractor. (for use in this contract only) at
prevailing market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the dept. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness and
soundness by the contractor before taking the delivery of the materials from the
7. Necessary cement will be purchased by the agency at their own cost from open market.
8. The persons of firm submitting the Tender should see that rates in the above schedule are
filled up by the Executive Engineer, on the issue of form prior to the submission of the
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Dy. Executive Engineer Executive Engineer
P. H. S. Sub Dn, P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID BK-4 Ph-2A RWSS
Name of Work : Demolition of Unsafe RCC Sump, Staff Quarters & Pump room at Various SHWs of
BK-4 Ph 2A RWSS. Under, M & R to BK-4 Ph 2A Regional Water Supply Scheme: 2026-27
Qty Unit Item Rate Amount
Demolition and dismantling of the Under Ground Sump,Capacity
3.0 Lakh ltr. located at Vav SHW, Staff Quarter & Pump room at
Vav SHW and 2 nos Staff Quatrs at Takhatpura SHW The scope
includes the complete. dismantling of the RCCstructure, including
walls, slabs, beams, columns, foundation and other related
components. All serviceable materials such as steel reinforcement
bars, stairs, C.I pipes, C.I.specials (tees, bends, sluice valves)
must be taken away by the contractor at no extra cost for the
conveyance of the demolished scrap (inclu.crushedconcrete). The
demolition has to be done mechanically (with machineries) ,using
machineries such as Jaw Crushers, Concrete Crushers, etc. After -
Job -10,518.28 Job
1.00 demolition, the contractor must ensure that the site is cleaned, all
debris removed foundation fill with good soil and the ground is
levelled, leaving the site in a clean and safe condition as per the
Engineer-in-charge's instructions. The rates for this work shall
include the cost of all serviceable materials and scrap value of
reusable items. The contractor must comply with all relevant
permits, safety measures, and local regulations The entire work,
from demolition to site cleanup, must be completed with due
diligence, ensuring no debris is left and the site is left in an
acceptable condition, as specified by the Engineer-in-charge.
I/We am/are willing to carry out the work at ____________________ % (Should be written in figures
and words) Above/Below the estimated rate mentioned above amount of my/our tender work out as
The bidder shall be required to pay an additional 18% GST on the final amount payable to the department
after applying the quoted percentage rate (whether above or below). The GST amount shall be calculated
separately and shall be paid along with the final payable amount as per applicable government norms.
Special Note: THE QUOTED AMOUNT IS TO BE PAID TO THE DEPARTMENT HENCE AMOUNT
SHOWN IN MINUS.
Example (for Clarification Only):
Volume-III, PRICE BID BK-4 Ph-2A RWSS
Sr. No. Say Tender Quoted Final Amount GST Total Payable by
Amount Percentage (Excl. GST) @18% Bidder to
In negative amount tenders, the bidder quoting the highest final payable amount to the department shall be
considered as L1.
Negative amount (–) indicates payment to the department by the bidder.
GST is calculated on the absolute value of the final quoted amount.
This example is for clarification only and actual payable amount will depend on the actual tendered value and
bidder's quoted rate.
Special Condition:
All bidders shall compulsorily submit a “Bahendari” (Affidavit) on ₹300 non-judicial stamp paper as per
the prescribed format attached with the tender.
Failure to submit this affidavit along with the bid shall result in the bid being excluded from the
evaluation process.
Estimated Cost Put to Tender Estimate Cost Put to Tender
Above:- Below:-
Add Rs.:- Deduct Rs.:-
Net Rs.:- Net Rs.:-
In Word Rs.:- In Word Rs.:-
Signature of contractor Dy. Executive Engineer Executive Engineer
P. H. S. Sub Dn, P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID BK-4 Ph-2A RWSS
1. As mentioned in the Conditions of contract, the Contract being a lump sum type
turnkey Contract on EPC basis, the provision of measurement will be applicable
only for the assessment of value of work done for inclusion in any interim
certificate for part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items
specified in Schedule B.
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
6 herein below.
4. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the
component as related to the total costs of the concerned item as whole. A head
titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the
5. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form
and by the method approved by the Employer's Representative, and signed jointly
by both the parties.
Signature of contractor Dy. Executive Engineer Executive Engineer
P. H. S. Sub Dn, P. H. Works Dn., G.W.S.S.B,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02_VOL 1 B GCC 116_228.pdf
04_Itemwise Specification 229_231 Final.pdf
05_VOL 3 Price bid standard_pg 232_279.pdf
06_Special Note 280.pdf
Ann 4.pdf
Ann 5 Purchase Policy.pdf
Ann 6B shramyogi GR.pdf
Any 6A Labour Circular.pdf
Circular 26 SIGN BOARD.pdf
DMO_2941_01-Apr-2026_744.pdf
GR LD Deduction 10012018.pdf
GST GR.pdf
Mecilianius min.pdf
Min wages Circular.pdf
Royelty 18.06.19 New rate.pdf
Vigilace Unitmin.pdf
00_TITLE_Pg_0.pdf
01_VOL 1 A Technical Bid 1-115.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .