| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC 112 2 BAIKUNTHAPUR TRIBENI HOOGHLY 712503 | TRIBENI HOOGHLY | HOOGHLY | WEST BENGAL | 712503 | 1 | Accepted-AOC L1 BIDDER | |
| 2 | 2₹9.3 L+₹22,390 (2.46%)Rejected-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | 2 | Rejected-Finance L2 BIDDER |
Tender Value
₹10.6 L
EMD Value
₹21,200
Closing Date
19 Jun 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE GM(STPS)
ADMIN BUILDING, STPS,THE WBPDCL.
Overhauling job of BHEL make 250MW Unit-6 ESP at STPS, WBPDCL.
2020_WBPDC_282937_1
WBPDCL/STPS/NIT/E2061/19-20
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
ADMIN BUILDING, STPS, THE WBPDCL.
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
THE WBPDCL
₹21,200
ADMIN BUILDING, STPS,THE WBPDCL.
15 Sept 2020
15 May 2020
23 Jun 2020
16 May 2020
19 Jun 2020
23 May 2020
22 May 2020
120 days
Amount
Description of job
Dry cleaning of all ESP Pass starting from ESP inlet duct (funnel) to ESP outlet duct (funnel),all hoppers, gas distribution baffles, all emitting and collecting electrodes and other allied zones.
After completion of dry cleaning, deposited ash under all ESP hoppers should be removed before water washing. This is under scope of the party.
Water washing of all ESP Pass starting from ESP inlet duct [funnel] to ESP outlet duct [funnel],all hoppers, gas distribution baffles, all emitting and collecting electrodes and other allied zones. Heavy water force during water washing should not be applied directly to the plates.
After water washing immediate cleaning of deposited ash from work site is under scope of the party.
Inspection of all collecting electrodes / plates (Total – 5400 nos.) and rectification if necessary.
Inspection of all emitting electrodes (Total – 46980 nos.)
Replacement of all emitting Electrodes with new one if found Damaged
Alignment checking of collecting electrodes of all ESP Fields and correction of the same by light hammering and spot heating.
Inspection of shock bars / shock bar guides of all ESP Fields, rectification and replacement, if necessary.
Inspection of Collecting Electrode Rapping Mechanism (CERM) shafts (total 36 nos.), Emitting Electrode Rapping Mechanism (EERM) shafts (total 36 nos.) & Gas Distribution Rapping Mechanism (GDRM) shafts (total 4 nos.) and replacement of damaged components as required.
Inspection of all CERM rapping hammers (total 1080 nos.), EERM rapping hammers (total 540 nos.) & GDRM rapping hammer assemblies (total 144 nos.) and replacement of damaged components as required.
Checking of pin wheel arrangement and replacement if necessary for 36 nos. ESP field.
Servicing of gear boxes of all CERM, GDRM and EERM including oil leakage maintenance.
Painting of gear boxes of all CERM, GDRM and EERM.
Inspection of all gas distribution baffle plates (total – 144 nos.) and repair (patch repair) if necessary.
Inspection of all GD Screens (total 12 sets) and replacement if necessary.
Inspection and replacement of Gas Distribution Box Nozzles of all ESP Pass at the inlet funnel of ESP and replacement if necessary.
Physical Inspection with resistance measuring & cleaning of all Hopper Heaters (total 864 nos.), Support Insulator Heaters (total 144 nos.), Shaft Insulator Heaters (total 36 nos.) and replacement of damaged Heaters, if necessary.
All Heaters are to be commissioned with Thermostat. Cut in & Cut out are to be checked after work. Thermostat, if found damaged to be replaced (total – 72 nos.)
Cleaning and tightness checking and Painting of Disconnecting Switch boxes with Pin Insulators (total – 108 nos.),Shaft insulator Housing with insulators (total-36 Nos) and support insulator housing with insulators(total-144 Nos). Insulators and copper tube if found damaged to be replaced. All Disconnecting Switch boxes door rubber Gasket replacement is mandatory.Rubber gasket will be supplied STPS authority.
Air tightness checking and painting of all inspection doors / manholes with asbestos rope lining are to be checked and replacement if necessary. Asbestos rope will be supplied by STPS authority.
Any type of fabrication job to set right the ESP internal and leakage rectification of ESP Roof Top and ESP Wall to resist water and air ingress in ESP if required, are also within the scope of the party.
Checking and calibration of all Ash Level Indicators (ALI) are to be done. If required, ALI to be replaced (total – 72 nos.). Along with RF type probe checking and replacement if required.
OPTIONAL JOB
Gas Distribution Test in all 4 pass of ESP with necessary tools and tackles including Anemometer.
Alignment of GD Screen,Changes and refixing of deflection plates, correction of inlet Ducts/guide vanes, correction of any leakage in duct, inlet funnel and any other rectification if required on the basis of Gas Test in all 4 ESP Pass
TECHNO ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .