Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹1,600
Closing Date
2 Apr 2026, 3:30 pmClosed
EE OFFICE- TIRUPATHI
Tirupathi
Urgent Repairs to Tirupati Tiruchanur road to Challavaripalli (via) Thanapalli Venkataramapuram road from Km.4/8 to 5/4 in the Jurisdiction of (R&B) Section Tirupati Rural
917957
NIT No.94/ EE/R&B/TPT/2025-26, Dated:23.03.2026
OPEN - NCB
Road Work
TIRUPATHI
9 documents required · 6 mandatory · 3 optional
₹56
₹1,600
26 Mar 2026
26 Mar 2026
26 Mar 2026
Providing B.T. patch on the existing B.T.surface using aggregate of 40 to 45 mm IRC size M/C metal with required quantity of 9.5 - 11.20mm HBG M/C key chips and 42Kgs of bitumen 80/100 grade per cum of course aggregate both for premixing and for tack coat including cutting grooves and neatly dresing the edges for boxing the patch materials irrespective of thickness without any protrode or projection including cost of brushing and cleaning the surface with brass brooms of all the dust and earth and heating the bitumen to the required temperature hand drum mixing and laying the premix to the prepared surface to a suitable thickness as directed during execution after laying tack coat to proper camber sectioning levelling hand packing and rolling with 8-10t capacity power road roller, including cost and conveyance of metal from aproved quarry to work spot and stacking to departmental gauge for premeasurements cost and conveyance of 42 kgs of bitumen 80/100 grade (Total quantity including wastage) to work spot including hire and operational charges of all T&P and labour charges etc., complete.
Providing B.T.Patches on the existing B.T.surface using aggregate of 9.50 - 11.20mm IRC size HBG M/C chips and 72 Kgs of bitumen 80/100 grade per cum of course aggregate both for premixing and for tack coat including cutting grooves and neatly dressing the edges for boxing the patch materials irrespective of thickness without any protrode or projection including cost of brushing and cleaning the surface with brass brooms of all the dust and earth and heating the bitumen to the required temperature hand drum mixing and laying the premix to the prepared surface to a suitable thickness as directed during execution after laying tack coat to proper camber sectioning levelling hand packing and rollling with power road 8-10t roller including cost and conveyance of metal from aproved quarry to work spot and stacking to departmental gauge for premeasurements cost and conveyance of 72kgs of bitumen 80/100 grade (Total quantity including wastage) to work spot including hire and operational charges of all T&P and labour charges etc.,complete
Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., complete including seignioarge charges for finished item of work as per MoRT&H specification 301(4th Revision) and as directed by the Engineer-in-Charge
Making up loss of materials/irregularities on shoulder to the design level by adding fresh approved soils and compacting it with appropriate equipment as per MORT&H specification 3003 (5th revision)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTS 94.doc
TENDER_DOCUMENT • 0.34 MB
NIT-94.xls
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid