| Sl No | Description | Qty | Unit | CHITHRANGATHAN PLACHERY L1 | SIVAN PILLAI L2 |
|---|---|---|---|---|---|
| 1.00foot path | |||||
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 17.76 | cum | 886.73 ₹15,748.32 | 958.97 ₹17,031.31 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 | 3.28 | cum | 8,474.87 ₹27,797.57 | 9,165.29 ₹30,062.15 |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 49.44 | cum | 8,282.24 ₹4.1 L | 8,956.96 ₹4.4 L |
| 1.00 | OD447154/2025-2026:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 4.33 | cum | 715.39 ₹3,097.64 | 773.67 ₹3,349.99 |
| 1.00 | OD447159/2025-2026:Filling up low lying and water logged areas with local material/ quarry muck,spreading in layers,
leveling the top at site and consolidation by ramming, etccomplete for improving the CBR value of
subgrade (cost for 300.0 cum) | 3.6 | cum | 892.11 ₹3,211.60 | 964.79 ₹3,473.24 |
| 1.01 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 12.1 | cum | 9,004.27 ₹1.1 L | 9,737.81 ₹1.2 L |
| 1.01 | OD447205/2025-2026:Providing and fixing hand rail of approved size by welding etc.to protection work of retaining wall/culvert slab and similar | 204 | kg | 208.17 ₹42,466.68 | 225.12 ₹45,924.48 |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 1.98 | tonne | 94,561.73 ₹1.9 L | 1,02,265.27 ₹2.0 L |
Tender Value
₹8.5 L
EMD Value
₹21,183
Closing Date
4 Mar 2026, 10:00 amClosed
ASSISTANT ENGINEER
LID EW Section , Punalur Municipality
PWD WORKS
2026_LSGD_840763_3
06/2026/AE/LID EW/PMC
Open Tender
Civil Works - Others
Punalur Municipality
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,183
Yes
20 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
foot path
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5)
OD447154/2025-2026:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
OD447159/2025-2026:Filling up low lying and water logged areas with local material/ quarry muck,spreading in layers, leveling the top at site and consolidation by ramming, etccomplete for improving the CBR value of subgrade (cost for 300.0 cum)
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD447205/2025-2026:Providing and fixing hand rail of approved size by welding etc.to protection work of retaining wall/culvert slab and similar
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1417501.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
AFFI.pdf
Tender Documents • 0.33 MB
652.pdf
Tender Documents • 1.65 MB
BOQ_1417501.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid