Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹47.6 LAccepted-AOC 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | ₹47.6 L Quoted ₹56.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹56.5 L+₹30,986.80 (0.55%)Rejected-AOC | ₹56.5 L+₹30,986.80 (0.55%) | 2 | Rejected-AOC L2 |
| 3 | 3₹70.2 L+₹14.0 L (24.9%)Rejected-AOC E 60 INDUSTRIAL AREA HARIDWAR 249401 | HARIDWAR | HARIDWAR | UTTARAKHAND | 249401 | ₹70.2 L+₹14.0 L (24.9%) | 3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents are not submitted in hard |
| 5 | Rejected-Technical AATISH BAZAN STREET SAHARANPUR SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Rejected-Technical Documents are not submitted in hard |
Tender Value
₹60.7 L
Closing Date
29 Sept 2021, 5:00 pmClosed
Executive Engineer (MandG)
Office of EE(MandG) Mohammadpur Power House
Annual Maintenance of machines 1 2 3 of Mohammadpur Power House
2021_UJVN_36524_1
11/EE(MandG)/MPH/2021-22
Open Tender
Repair and Maintenance Works
Piece-work
21 days
Mohammadpur Power House
PQR and other conditions of tender document
2 documents required · 2 mandatory
₹5,900
DGM HGC Pathri
Yes
18 Sept 2023
16 Sept 2021
30 Sept 2021
16 Sept 2021
29 Sept 2021
16 Sept 2021
Supply Items against Annual Maintenance of machines 1, 2, 3 of Mohammadpur Power House
Brake Jack seal
Bearing Body Seal
UGB Cooler Plate Cover
Oil Level Relay
Shear Pin
Ammeter for UCB/11 kV Breaker panel
Voltmeter for UCB/11 kV Breaker panel
GV Position Meter for UCB
Runner Position Meter for UCB
GV Actuating Meter for UCB
Runner Actuating Meter for UCB
RPM for UCB
Work against Annual Maintenance of machines 1 of Mohammadpur Power House
Sealing of Intake gates & draft tube, Dewatering of Forebay & Draft tube, Dismantling of Machine including Generator Dome, Rotating Union, Servomotors, Thrust Collar, Bearings, Coolers, Upper Bracket etc.)
Draining of oil of TGB, Thrust bearing, UGB & LGB and measurement of bearing gaps, cleaning of all bearing housings & pits
Rebabbiting of Thrust Pads
Rebabbiting of UGB And LGB Pads
Rebabbiting of TGB Shell
Overhauling/repairing of levers, links and greasing work of guide vane assembly and replacement of damaged bushes. Guide Vane bedding, Repair of Turbine Guide Bearing journal.
Cleaning, checking and overhauling of Guide Vane & Runner Servomotor Assembly including replacement of all seals & setting of stroke length.
Overhauling of braking and jacking system including replacement of all seals.
Checking and cleaning of bearing coolers and repair/replacement of coolers
Thorough cleaning of generator stator winding and accessible portion of rotor.
Blue matching of bearing pads and bearing gap setting & filling of oil in bearing oil bath.
Replacement and Shifting of TSD Pannel
DP Test of Turbine Top Cover, Upper Bracket and Lower Bracket
Modification in Exhaust Fan System for Rotating Union
Modification and Shifting of TGB Cooler
Replacement of Oil and water Pipline (Damaged)
Assembly of machine.
Alignment, leveling & centering of machine.
Painting of machine and its associated pipelines.
Testing & commissioning of machine including measurement of Stator form & Rotor form, PI & IR of Generator, Rotor, all auxiliaries etc.
Work against Annual Maintenance of machines 2 of Mohammadpur Power House
Sealing of Intake gates & draft tube, Dewatering of Forebay & Draft tube, Dismantling of Machine including Generator Dome, Rotating Union, Servomotors, Thrust Collar, Bearings, Coolers, Upper Bracket etc.)
Draining of oil of TGB, Thrust bearing, UGB & LGB and measurement of bearing gaps, cleaning of all bearing housings & pits
Rebabbiting of Thrust Pads
Rebabbiting of UGB And LGB Pads
Rebabbiting of TGB Shell
Overhauling/repairing of levers, links and greasing work of guide vane assembly and replacement of damaged bushes. Guide Vane bedding, Repair of Turbine Guide Bearing journal.
Cleaning, checking and overhauling of Guide Vane & Runner Servomotor Assembly including replacement of all seals & setting of stroke length.
Overhauling of braking and jacking system including replacement of all seals.
Checking and cleaning of bearing coolers and repair/replacement of coolers
Thorough cleaning of generator stator winding and accessible portion of rotor.
Blue matching of bearing pads and bearing gap setting & filling of oil in bearing oil bath.
Replacement and Shifting of TSD Pannel
DP Test of Turbine Top Cover, Upper Bracket and Lower Bracket
Modification in Exhaust Fan System for Rotating Union
Modification and Shifting of TGB Cooler
Replacement of Oil and water Pipline (Damaged)
Assembly of machine.
Alignment, leveling & centering of machine.
Painting of machine and its associated pipelines.
Testing & commissioning of machine including measurement of Stator form & Rotor form, PI & IR of Generator, Rotor, all auxiliaries etc.
Work against Annual Maintenance of machines 3 of Mohammadpur Power House
Sealing of Intake gates & draft tube, Dewatering of Forebay & Draft tube, Dismantling of Machine including Generator Dome, Rotating Union, Servomotors, Thrust Collar, Bearings, Coolers, Upper Bracket etc.)
Draining of oil of TGB, Thrust bearing, UGB & LGB and measurement of bearing gaps, cleaning of all bearing housings & pits
Rebabbiting of Thrust Pads
Rebabbiting of TGB Shell
Overhauling/repairing of levers, links and greasing work of guide vane assembly and replacement of damaged bushes. Guide Vane bedding, Repair of Turbine Guide Bearing journal.
Cleaning, checking and overhauling of Guide Vane & Runner Servomotor Assembly including replacement of all seals & setting of stroke length.
Overhauling of braking and jacking system including replacement of all seals.
Checking and cleaning of bearing coolers and repair/replacement of coolers
Thorough cleaning of generator stator winding and accessible portion of rotor.
Blue matching of bearing pads and bearing gap setting & filling of oil in bearing oil bath.
Replacement and Shifting of TSD Pannel
DP Test of Turbine Top Cover, Upper Bracket and Lower Bracket
Modification in Exhaust Fan System for Rotating Union
Modification and Shifting of TGB Cooler
Replacement of Oil and water Pipline (Damaged)
Assembly of machine.
Alignment, leveling & centering of machine.
Painting of machine and its associated pipelines.
Testing & commissioning of machine including measurement of Stator form & Rotor form, PI & IR of Generator, Rotor, all auxiliaries etc.
Fibretech
GOGOAL HYDRO PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .