Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.2 LAccepted-AOC | L1 | Accepted-AOC Rate Accepted |
| Sl No | Description | Qty | Unit | S Pareed L1 |
|---|---|---|---|---|
| 1.00COMMUNITY HALL - Civil work | ||||
| 1.01 | 2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 140 | sqm | 14.78 ₹2,069.2 Lowest |
| 1.02 | 2.7.2 : Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting) | 87.67 | cum | 717.61 ₹62,915.74 Lowest |
| 1.03 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 23.44 | cum | 6,814.89 ₹1,59,761.47 Lowest |
| 1.04 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 16.2 | sqm | 335.31 ₹5,432.02 Lowest |
| 1.05 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 6.79 | cum | 9,085.14 ₹61,679.02 Lowest |
| 1.06 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.7 | cum | 10,954.04 ₹29,575.91 Lowest |
| 1.07 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 57.09 | cum | 7,204.78 ₹4,11,342.5 Lowest |
| 1.08 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 119.39 | sqm | 649.82 ₹77,584.61 Lowest |
| 1.09 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 150.48 | sqm | 815.78 ₹1,22,758.57 Lowest |
Tender Value
₹79.2 L
EMD Value
₹50,000
Closing Date
24 Mar 2025, 3:00 pmClosed
Regional Engineer
REGIONAL ENGINEER, KERALA STATE NIRMITHI KENDRA, AYYANTHOLE P.O., CIVIL LANE, THRISSUR 680 003 PH No 04872362854 8111882867
Construction of Community hall, House maintenance(3 Nos), Retaining structure, Compound wall, New road construction, Check dam, Bore well, Water distribution, Plumbing work, Electrical Work
2025_KSNK_742648_1
KSNK/TECH/THRS/CCPT-153R5/2024
Open Tender
Civil Works - Others
Item Rate
300 days
Near Chokkana view point
Refer NIT
6 documents required · 6 mandatory
₹2,500
₹50,000
Yes
24 Oct 2025
24 Feb 2025
25 Mar 2025
24 Feb 2025
24 Mar 2025
24 Feb 2025
24 Feb 2025 - 24 Mar 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .