Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.1 L+₹54,494.72 (9.89%)Admitted-Fee/PreQual/Technical/Finance | ₹6.1 L+₹54,494.72 (9.89%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.1 L+₹57,967.45 (10.5%)Admitted-Fee/PreQual/Technical/Finance | ₹6.1 L+₹57,967.45 (10.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.8 L+₹1.3 L (22.9%)Admitted-Fee/PreQual/Technical/Finance | ₹6.8 L+₹1.3 L (22.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | AYUB.K.M L2 | C.RAJAN L3 | KM.HAMZA L4 | DINAKARAN.K L1 |
|---|---|---|---|---|---|---|---|
| 1.00Maintenance works | |||||||
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 11.97 | sqm | 50 ₹598.5 | 50 ₹598.5 | 56 ₹670.32 | 45.94 ₹549.9 Lowest |
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 1 | each | 339 ₹339 | 341 ₹341 | 379 ₹379 | 308.58 ₹308.58 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.2 | cum | 1,906 ₹377.39 | 1,916 ₹379.37 | 2,129 ₹421.54 | 1,731.55 ₹342.85 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 25.97 | cum | 321 ₹8,335.73 | 323 ₹8,387.66 | 359 ₹9,322.51 | 292.45 ₹7,594.34 Lowest |
| 1.00 | OD134291/2026-2027:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per the direction of Departmental officer at site | 16.52 | cum | 3,574 ₹59,056.78 | 3,594 ₹59,387.26 | 3,993 ₹65,980.33 | 3,246.68 ₹53,648.14 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 0.46 | cum | 7,467 ₹3,427.35 | 7,509 ₹3,446.63 | 8,343 ₹3,829.44 | 6,783.25 ₹3,113.51 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.37 | cum | 9,387 ₹12,860.19 | 9,439 ₹12,931.43 | 10,488 ₹14,368.56 | 8,527.37 ₹11,682.5 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.9 | sqm | 345 ₹3,069.12 | 347 ₹3,086.91 | 386 ₹3,433.86 | 313.94 ₹2,792.81 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 221.8 | kilogram | 100 ₹22,180 | 101 ₹22,401.8 | 112 ₹24,841.6 | 91.4 ₹20,272.52 Lowest |
Tender Value
₹6.8 L
EMD Value
₹16,948
Closing Date
17 Aug 2026, 6:00 pmClosed
AEE Pazhayannur BP
Office of the Assistant Executive Engineer, LSGD Sub Division, Pazhayannur Block Panchayath
Annual Plan- 2026-27-Essential Maintenance Work at Pazhayannur CHC- Pro.No. 91/27-PZR BP-General Civil Work
2026_LSGD_864810_1
TN-04/PZR/2026-27
Open Tender
Civil Works - Buildings
Item Rate
Pazhayannur GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,495
Yes
₹16,948
Yes
7 Sept 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance works | |||||
| 1.001 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | - | - |
| 1.002 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.003 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.005 | OD134291/2026-2027:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per the direction of Departmental officer at site | - | cum | - | - |
| 1.006 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.007 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.02 MB
finance_1463283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1463283.xls
BOQ • 0.33 MB
viewnit.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 1.78 MB
fot.pdf
Tender Documents • 0.25 MB
foi.pdf
Tender Documents • 0.23 MB
Affidavit.pdf
Tender Documents • 0.24 MB
epf.pdf
Tender Documents • 0.23 MB
preli.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .