Tender Value
₹9.7 L
EMD Value
₹19,409
Closing Date
8 Oct 2026, 3:00 pmDue today
EE, Capital Complex Division, Agartala
o/o the EE, Capital Complex Division, PWD(B), Agartala
Running maintenance of different works related to building maintenance at new Secretariat Building at kunjaban extension Agartala under the jurisdiction of Capital Complex Subdivision No II building under Capital complex Division Phase II du
2026_CEPWD_77359_1
53/DNIT/EE/CCD/PWD/2026-27
Open Tender
Civil Works
Percentage
120 days
Kunjaban Extension
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹19,409
30 Sept 2026
30 Sept 2026
8 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 50 | Sqm. | 9.4 | ₹470 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 5 | Cum. | 231.6 | ₹1,158 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum. | 1,177.3 | ₹1,177.3 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level: (i) 1:2:4 (Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | 1 | Cum. | 10,742.6 | ₹10,742.6 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-
-All work upto plinth level: (i) 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum. | 12,073.8 | ₹12,073.8 |
| 6 | Steel reinforcement for R.C.C. work ready to use "cut
and bend" rebars of approved make from
factory/workshop to construction site including
placing in position and binding all complete upto
plinth level. (i) Thermo-Mechanically Treated bars of grade Fe-500D or more. | 50 | Kg. | 98.4 | ₹4,920 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. (i)Thermo-Mechanically Treated bars of grade Fe-500D or more. | 50 | Kg. | 103.9 | ₹5,195 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement- (i)1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 0.5 | Cum. | 13,584.5 | ₹6,792.25 |
| 9 | First class brick work in foundation and plinth including cost of all materials as required complete:- (i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 1 | Cum. | 9,845.2 | ₹9,845.2 |
| 10 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete :- (i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 4 | Sqm. | 1,533.5 | ₹6,134 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.07 MB
BOQ_78753.xls
BOQ • 0.48 MB
fdnit.pdf
Tender Documents • 3.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .