Tender Value
₹24.9 L
EMD Value
₹49,700
Closing Date
27 Aug 2026, 4:00 pm2d left
Xen RnB Division Kargil
Xen RnB Division Kargil
Construction of A.D Office Building at Kargil (by way of Balance work) Under SDP
2026_PWD_19396_1
E tender 31 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
30 days
Kargil
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Xen RnB Division Kargil
₹49,700
20 Aug 2026
20 Aug 2026
28 Aug 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundation, drains, Pipes, cables etc.(not exceeding 1.5 mtr in width ) and for shafts, wells .cesspits and the like not exceeding 10sqm on plan | |||||
| 1.01 | All Kind of soil @50% | 21.2 | Cum | 433.83 | ₹9,197.2 |
| 1.02 | Ordinary Rock @30% | 12.72 | Cum | 959.86 | ₹12,209.42 |
| 1.03 | Hard Rock(Blasting Prohibited) @20% | 8.48 | Cum | 1,958.19 | ₹16,605.45 |
| 2 | Providing and laying of soling stone hand packed tightly incld. Cost of stone | 5.31 | cum | 1,187.05 | ₹6,303.24 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.17 | cum | 5,570.83 | ₹17,659.53 |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutments, posts and struts etc. upy floor five level excluding cost of centering, shuttering, finishing and reinforcement: (1:1.5:3) 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 6.59 | cum | 10,802.86 | ₹71,190.85 |
| 5 | Reinforced cement concrete work in Footing , Pedestal
,Columns , beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with M20 (1:1.5:3) (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 6.63 | cum | 11,240.09 | ₹74,521.8 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo- Mechanically Treated bars of grade Fe-500D or more. | 1,586 | kg | 106.38 | ₹1,68,718.68 |
| 7 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) (crushed) Mud Mate
(Use Of Portland Pozzolana Cement Is advised as Per Green Building Guidelines OR 25% replacement of Ordinary Portland cement with fly ash by weight of cement used in structural concrete.) | 11.3 | cum | 6,427.91 | ₹72,635.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_46029.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].