| Sl No | Description | Qty | Unit | KR CONSTRUCTIONS L1 | RR CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation In hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders. with an initial lead of 10 m and lift of 2 m etc.for foundation | 9 | cum | 135 ₹1,215 | 150 ₹1,350 |
| 2.00 | Supply and filling the basement with M sand for foundation including watering consolidation etc., complete | 0.5 | cum | 2,320 ₹1,160 | 2,800 ₹1,400 |
| 3.00 | PCC 1:4:8 using 40m HB stone for foundation including cost of all materials and labour etc., complete | 4 | cum | 6,324 ₹25,296 | 7,500 ₹30,000 |
| 4.00 | PCC 1:2:4 using 12- 20mm HB stone without form work for footing concrete including cost of cement, all materials lead and lifts etc., complete | 5 | cum | 9,630 ₹48,150 | 10,500 ₹52,500 |
| 5.00 | PCC 1:1.5:3 using 20mm HB stone with form work for above ground level including cost of cement, all materials lead and lifts etc., complete | 4 | cum | 14,550 ₹58,200 | 16,500 ₹66,000 |
| 6.00 | Refilling with excavated earth other than sand including cost of all materials and labour etc complete. | 4 | cum | 46 ₹184 | 60 ₹240 |
| 7.00 | Transporting of excavated soil by head load 100m and spreading in layers of 23cm thick including all labour, lead, lift etc., complete. | 9 | cum | 45 ₹405 | 50 ₹450 |
| 8.00 | Plastering the walls with CM 1:5,12mm thick including cost of all materials,labour,lead,lift etc complete. | 9 | sqm | 295 ₹2,655 | 350 ₹3,150 |
| 9.00 | Exterior painting with two coats of approved quality distember over one coat of white cement primer for foundation & wall including cost of all materials, labour, lead, lift, etc., complete. | 9 | sqm | 170 ₹1,530 | 161 ₹1,449 |
| 10.00 | SGST & CGST (If applicable quote the value, if not enter '0') | 1 | percentage | 18 ₹24,983.1 | 18 ₹28,177.02 |
Tender Value
₹1.4 L
EMD Value
₹1,400
Closing Date
19 Dec 2025, 2:00 pmClosed
Superintending Engineer, TEDC/Metro, Mannarpuram,
Office of the Superintending Engineer, TEDC/Metro, Mannarpuram, Trichy-20.
Improvement works by providing of Feeder Breaker plinth for the dedicated 11 kV feeder to Kolli Hills Hydro power evacuation project at Balakrishnampatti 33/11 kV SS.
2025_EB_629583_1
SE/TEDC/Metro/Trichy/ Specification No.16/2025-26
Limited
Civil Works
30 days
Balakrishnampatti
Refer Tender specification
2 documents required · 2 mandatory
₹0
₹1,400
Yes
30 Jan 2026
6 Dec 2025
20 Dec 2025
6 Dec 2025
19 Dec 2025
6 Dec 2025
6 Dec 2025 - 16 Dec 2025
Amount
Earth work excavation In hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders. with an initial lead of 10 m and lift of 2 m etc.for foundation
Supply and filling the basement with M sand for foundation including watering consolidation etc., complete
PCC 1:4:8 using 40m HB stone for foundation including cost of all materials and labour etc., complete
PCC 1:2:4 using 12- 20mm HB stone without form work for footing concrete including cost of cement, all materials lead and lifts etc., complete
PCC 1:1.5:3 using 20mm HB stone with form work for above ground level including cost of cement, all materials lead and lifts etc., complete
Refilling with excavated earth other than sand including cost of all materials and labour etc complete.
Transporting of excavated soil by head load 100m and spreading in layers of 23cm thick including all labour, lead, lift etc., complete.
Plastering the walls with CM 1:5,12mm thick including cost of all materials,labour,lead,lift etc complete.
Exterior painting with two coats of approved quality distember over one coat of white cement primer for foundation & wall including cost of all materials, labour, lead, lift, etc., complete.
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
RR CONSTRUCTION (BID ID -1539390)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
16spec.pdf
Tender Documents • 0.17 MB
BOQ_752866.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid