| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC Z MANZIL NAYABAZAR | ₹5.7 L | L1 | Accepted-AOC lowest amount quoted.estimate rate without GST |
| 2 | L2₹7.4 L+₹1.7 L (29.8%)Rejected-AOC | ₹7.4 L+₹1.7 L (29.8%) | L2 | Rejected-AOC second lowest amount quoted ,10 percentage above of estimate rate including GST |
Tender Value
₹5.7 L
EMD Value
₹14,300
Closing Date
11 Jun 2026, 5:00 pmClosed
Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGINEER,ELECTRICAL SUB DIVISION,UPPALA
Reconductoring work at Mayyarmoola transformer area
2026_KSEB_853056_1
1/26-27 /AEE-UPLl/dtd.26.05.26
Open Tender
Electrical Works
Percentage
90 days
Mayyarmoola, Uppala
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,416
₹14,300
24 Jul 2026
26 May 2026
16 Jun 2026
27 May 2026
11 Jun 2026
27 May 2026
27 May 2026 - 11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| General | Providing Stay for LT poles including digging & back filling pit in ordinary soil. | - | No | - | - |
| General | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. | - | km | 0.99 | - |
| General | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. | - | km | - | - |
| General | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. | - | No | - | - |
| General | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | - | No | 0.99 | - |
| General | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | - | No | - | - |
| General | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. | - | No | 0.99 | - |
| General | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. | - | No | - | - |
| General | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | - | Trip | - | - |
| General | Installation of Insulation piercing connector for main to service line main
:16-95 sqmm, Tap 16-95 sqmm | - | E | 0.99 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1441568.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TenderDocument.pdf
Tender Documents • 0.77 MB
BOQ_1441568.xls
BOQ • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .