Assistant Executive Engineer
Civil Maintenance Sub Division Poringalkuthu
Construction of Toilet Block and Common Septic Tank for Inspection Bungalow (IB) at Poringalkuthu.
2026_KSEB_864997_1
E-04/2026-27/AEE/CMSD/PGL
Open Tender
Civil Works - Buildings
Percentage
120 days
Poringalkuthu
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,780
₹18,840
7 Sept 2026
10 Aug 2026
14 Sept 2026
11 Aug 2026
7 Sept 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil | - | cum | 1 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.
Ordinary rock | - | cum | - | - |
| 3 | Excavation in hard rock and boulders above 500 dm3 in size by non explosive agent/splitter or any other method with out resorting to the use of conventional explosive materials with jack hammer etc. drilling, conveying and disposing the materials upto 5 km/ in dumping yard and all lifts, cost of compressed air,jack hammer,water line etc. Details of cost for 1 cum. | - | cum | - | - |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:
Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 1 | - |
| 5 | Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 6 | Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | 1 | - |
| 7 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 1 | cum | - | - |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | 1 | - |
| 10 | Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tenderdocuments.pdf
Tender Documents • 0.83 MB
BOQ_1463684.xls
BOQ • 0.33 MB
datecorri1.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].