Loading…
Loading…
Tender Value
₹23.4 L
EMD Value
₹23,448
Closing Date
5 Aug 2026, 4:00 pm
D C Patel
Work of Survey, Design, Supply, Installation, Testing, commissioning with Comprehensive Maintenance contract of 5 years for Solar Rooftop Projects on Control Room building at 66kV Haldarwa S/s, 66kV Zanor S/s, 66kV Saring S/s, 66kV Sarbhan S/s, 66kV Vilayat S/s under Haldarwa AM Division under Bharuch TR Circle”.
324164
TCBRH/26-27/E-123
Open
Electrical - All
Works
Bharuch
15 documents required · 14 mandatory · 1 optional
₹1,180
GETCO
₹23,448
15 Jul 2026
15 Jul 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
Name of Work : Tender for Work of Survey, Design, Supply,
Installation, Testing, commissioning with Comprehensive
Maintenance contract of 5 years for Solar Rooftop Projects on
Control Room building at 66kV Haldarwa S/s, 66kV Zanor S/s,
66kV Saring S/s, 66kV Sarbhan S/s, 66kV Vilayat S/s under
Bharuch AM Division under Bharuch TR Circle”.
Note : Submit all the self-attested Documents Online in n-
(No any Physical Documents)
Payment of Tender Fee as well as EMD Shall be accepted
through RTGS/NEFT/online Only.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
TENDER NOTICE No: TCBRH/26-27/E-122
Superintending Engineer, Transmission Circle GETCO Bharuch ( Address of the office - The
Superintending Engineer (TR), Gujarat Energy Transmission Corporation Limited, Circle Office,
Maktampur Road, Bharuch-392012. ) invites “On line Tenders” (e-tendering) for the purchase/ works
of following items. Tender Papers & Specifications may be down loaded from Web site
https://tender.nprocure.com (For view, down load and on line submission) and GUVNL/GETCO web
site www.guvnl.com (For View &download only).
All tender documents, scanned copies of original documents (Notarized / self-attested copies of
original – as specified in tender document) along with scan copy of transaction slip of payment
made through RTGS/NEFT for Tender Fee & EMD shall be unloaded through on line only ( which
is mandatory) on (n) procure portal.
Bidders shall compulsorily pay tender fee and EMD through RTGS/NEFT only. No any physical documents,
Demand Draft / Banker’s cheque or Pay order for tender fee and EMD to be submitted by bidders.
All the bidders, in respect of tender item must have vendor registration with the GEDA prior to the
date of opening of technical bid of the tender, otherwise their bids will not be considered eligible
for technical scrutiny and their technical bids will not be opened
1 Tender No. TCBRH/26-27/E-122
Work of Survey, Design, Supply,
Installation, Testing, commissioning
with Comprehensive Maintenance
contract of 5 years for Solar
Works of Rooftop Projects on Control Room
2 building at 66kV Haldarwa S/s,
66kV Zanor S/s, 66kV Saring S/s,
66kV Sarbhan S/s, 66kV Vilayat S/s
under Bharuch AM Division under
Bharuch TR Circle”.
3 Estimated cost with GST in Rs.
4 Tender Fee (non-refundable)including GST Rs. 1180 (1000 Plus GST 18%)
5 Earnest Money Deposit amount in Rs. 23448/-
On line (E-tendering) tender/ offer submission
6 last date up to 16.00 hours only (This is As per Schedule
Date of opening online technical bid at As per Schedule [Tentative]
Tentative Date of on – line opening of Price bid, Shall be intimated separately
(if possible), at 11.00 Hours
9 Prices Firm/Percentage Basis
10 Time Limit 180 Days
11 Validity of Bid 180 days
12 Category of registration Approved Vendor of GEDA
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1. All tender documents, scanned copies of original (Notarized / self-attested copies of original
– as specified in tender document) documents along with scan copy of transaction slip of
payment made through RTGS/NEFT for Tender Fee & EMD shall be uploaded through on line
only (which is mandatory) on (n) procure Portal. No any physical documents , Demand Draft /
Banker’s cheque or Pay order for tender fee and EMD will be accepted
2. Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on or
before due date and time of submission of tender .Tender fee and EMD paid though Demand
Draft / Banker’s cheque or Pay order will not be accepted and no any further communication
in the matter will be entertained.
3. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering)
in scheduled time.
4. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF
form) remain legible (readable) and should not be password protected.
5. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on
bidder’s letterhead), Tender acceptance letter (on bidder’s letterhead), price bid, tender
documents specified in the tender must be submitted through online on n-procure portal
(mandatory) (All the documents to be duly self attested by the bidder). For any differences
or wrong entry bidder shall be sole responsible for that documents It shall be sole
responsibility of the bidder that the uploaded scanned documents (in PDF form) remain
legible (readable) and should not be password protected.
6. Tender will be evaluated on Data / Details / Documents of the online offer only.
7. The bidders are required to upload complete technical bid duly filled, sealed & signed by
bidder (all the appendices (annexure)/forms etc). This is intended for transparency and
speedy evaluation of the bids. Instead of simply confirming/attached in bid/refer physical
offer, the bidder shall fill in the particulars against appropriate place in respect of each line
appearing in Technical bid (In the absence of required details in uploaded tender documents,
technical bid, the purchaser has every right to evaluate the bids accordingly and bidder
cannot raise any objection against any point during evaluation).
8. In case of short submission of documents with bid and / or clarification if any required from
the bidder,the required details / documents may be asked from the bidder in physical form.
9. Payment of Tender fees & Earnest Money Deposit EMD. Amount should be paid by Online-
payment. Payment of Tender Fees & EMD by RTGS/NEFT/on line only. In case of payment
through RTGS/NEFT bidder has to mail following details:
Sr. No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details on the same date of payment so that receipt can
GETCO Beneficiary Bank detail is as under:
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3 Name of Bank BANK OF BARODA
4 Branch Code STABRO
Shalimar Complex, Station Road,Bharuch-
5 Address of Bank
6 IFSC Code BARB0STABRO
7 PAN No AABCG4029R
8 TAN No BRDG01026E
9 GST No 24AABCG4029R2ZC
10. Bidders are requested to remain in touch with the website for any amendment/ corrigendum
or extension of due date etc.
11. Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will not be
accepted. Also, Tender fee and EMD received after due date and time as specified in the
tender will not be accepted/opened irrespective of delay due to any reasons and the
Corporation shall not assume any responsibility for late receipt of the same.
12. Tender without EMD and tender fee plus GST as applicable shall be rejected.
13. The GETCO reserves the right to award the work to one or more bidders, considering their
technical and financial capacity OR to reject any or all tenders or accept any tender without
assigning any reason thereof.
Any technical questions, information and clarifications that may be required pertaining
to this enquiry should be referred to The Superintending Engineer (TR), Gujarat Energy
Transmission Corporation Limited, Circle office, Bharuch. GETCO reserves the right to
reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
GETCO, C.O., Bharuch
Download Tender Documents in (PDF Format) which consists of:
Part – I: Commercial Terms & Conditions
Part – II: Technical Specifications & GTP’S, Schedule “A” indicating the quantities & items, drawing if any.
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe”
Note: In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if
training required for participating in online tender, they can contact the following office:(n) Procure
Cell, (n) code solutions-A division of GNFC Ltd., 403, GNFC Infotower, S.G. Road, Bodakdev Ahmedabad –
316 / 317, Fax: 079-26857321 / 40007533, Email: [email protected].
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Details of the Firm
Name of the Firm
1 Address of registered office
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
1 Address of WORK
2 Contact personnel
4 Residential Address
7 Telegraphic code
8 E-mail address
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Details of experience in last three years from the due date of tender
Sr. Order Due date of Date of fully order
Work reference capacity in
No. value completion completion executed under
A Gujarat Energy Transmission Corporation Ltd./Semi Goverment
B Any Government of Gujarat
C Private Firms/Institue
List of work completion certificate submitted with technical bid
Name of the authority by whom
Sr. No. Name of work the work completion certificate Reference No. & Date
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
GENERAL TERMS & CONDITIONS WITH COMMERCIAL BID
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Bharuch hereinafter called ‘GETCO’/ ‘OWNER’
intends to receive bids for Work of Survey, Design, Supply, Installation, Testing, commissioning with
Comprehensive Maintenance contract of 5 years for Solar Rooftop Projects on Control Room
building at 66kV Haldarwa S/s, 66kV Zanor S/s, 66kV Saring S/s, 66kV Sarbhan S/s, 66kV Vilayat
S/s under Bharuch AM Division under Bharuch TR Circle”.as detailed in the accompanying
specifications in accordance with Terms and Conditions herein. The bids shall be prepared and furnished as per
these Instructions.
2.0 Qualification Requirements of Bidders
2.1 To be qualified for award, the bidder shall provide following satisfactory evidence to the Owner of his
capability and adequacy of resources:
1 Registration: The Bidder shall be strictly a Registered with GEDA.
2. Experience: The Bidder should have designed, supplied, installed & commissioned Grid
connected Solar PV Power Projects having aggregate capacity not less than 100KW in
residential Sector during last three years in any Government department of Gujarat/ Semi
government/Institute/Private Firm as main order.
3. Solvency: Latest bank solvency certificate not older than 1 Year from any Nationalized/
Scheduled/Co-operative Bank of a sum of minimum 20 % of the estimated cost shown in the
4 Provident Fund Code: Separate provident fund code number towards firm registered
with Regional P. F. Commissioner. PF should be on line active.
5 Financial Statement: The Bidder should submit the Income Tax Returns of last Three
Financial Years. The Bidder should submit certified photocopy of audited financial
statement i.e. Balance sheet with profit and loss account of last three Years. In
case, audit is not mandatory, bidder should submit photocopy of financial
statements i.e. Balance Sheet & Profit & Loss Account
6 Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for
signing the bid documents in case of partnership firm & self-affidavit for
proprietorship firm. MOA/AOA shall be submitted in case it is corporate entity.
All such documents shall have to be NOTARISED
7. I.T. PAN CARD: The bidder should submit the attested Photocopy of PAN Card of their firm.
8. GST Registration: The bidders should submit the certified copy of GST registration of their
firm. GST should be on line active.
9. Electrical contractor’s license: The bidders should submit the attested copy of GOG
Electrical Contractor licenses of firm with latest validation.
The bidders must be submitted all above documents scanned copy on n-procure and
certified/self-verified copy of all documents.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
CHECK LIST OF DOCUMENTS SUBMISSION
Mandatory to upload on-line only (pdf file)
No. Particulars Check Mark
1 Scan of NEFT/RTGS of Tender Fee Amount / Online payment receipt
2 Scan of NEFT/RTGS of EMD Amount / Online payment receipt
3 Registration Document as Approved Contractor –of GEDA
Work Completion Certificate in Form 3A [Experience Certificate as main
contractor] only as per Qualification requirement.
5 Bank Solvency Certificate
6 GST Registration Number document
Nature of Firm: Partnership Deed/Latest Form-G/Power of
7 Attorney/Authorized Signatory Certificate for partnership/self-affidavit for
proprietorship firm. All such documents shall have to be NOTARISED
8 PF Code document
9 PAN No document
Income Tax Return, Profit loss Accounts & Balance Sheet of Last Three
11 Electrical Contractor License
12 Filling Annexure 1 to
All Pages of Tender page with Bidder Signature and Rubber Stamp
(encouraged for digitally signed)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Technical Specification
Work of Survey, Design, Supply, Installation, Testing, commissioning with Comprehensive
Maintenance contract of 5 years for Solar Rooftop Projects on Control Room building at 66kV
Haldarwa S/s, 66kV Zanor S/s, 66kV Saring S/s, 66kV Sarbhan S/s, 66kV Vilayat S/s under Bharuch
AM Division under Bharuch TR Circle.
The assorted rating of the solar rooftop system for which the rates shall be discovered are as follows.
S. N Name of S/S with Proposed Capacity
1 66kV Haldarwa S/s- 10 KW
2 66kV Zanor S/s- 10 KW
3 66kV Saring S/s- 10 KW
4 66kV Sarbhan S/s- 10 KW
5 66kV Vilayat S/s- 10KW
Note:- (Project capacity will be considered in AC. Payment to Bidder will be done on AC Capacity
Registered, DC Capacity Installed, and Invertor Installed, whichever will be less.)
The broad specifications of the system (Detailed Specifications are given in the Tender elsewhere) shall
1) Solar PV Modules: - Mono Crystalline (Bi-Facial) make solar module not less than 520 Wp each
and having valid IEC certificate. (Certificate to be submitted on shortlisting of successful
Tenders). The PV Cell and the modules shall be of INDIAN MAKE. Necessary documents in this
regards must be provided to GEDA/GETCO.
The bidder shall be required to submit the Self declaration, regarding the Modules and Solar cells
used under this supply are “Made in India”, from the concerned manufacturer of Solar Modules,
before commissioning of the System. Such firm and Shortlisted bidder, those violate the requirement
of Indian Make Solar Cell and Module shall be put under the black list, and or stop deal list as may be
decided by the GEDA/GETCO.
Violation of norms of Domestic Content Requirement (DCR) Under Solar PV projects will lead to
penalties and action as mentioned in office memorandum of MNRE GOI vide letter no. 283/2018-
GRID SOLAR dated 20th February,
The ALMM list is published by the MNRE vide Notification No. 283/54/2018-Grid Solar-Part(1) Dated
30-12-2021 and the notification for the same is also published by the MNRE vide Notification No.
283/54/2018-Grid Solar-Part(2) Dated 13-01-2022. The Model and Manufactures of the Module and
Cell shall be from the ALMM only used in the SPV System in this project.
2) Invertor: - IEC certified invertor with in-built anti-islanding facility of Rated capacity plus minus 10%
of the aggregate capacity of the modules.
3) Mounting structure: - The mounting (Rectangle pipe/square pipe / circular pipe) with requisite cross
bars, nuts and bolts etc. shall be pre-galvanized or galvanized. The Rectangular /square / circular
hollow pipe section used for the structures should have a minimum 2.5 mm. A certificate of a
structural engineer certifying the strength and stability of the mounting structure to withstand the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
weight and wind speed of 150 km/hour throughout the life span of 25 years of the system, shall be
submitted by the vendors. The ground clearance of the bottom most edge of solar panel shall not be
less than 1200 mm.
4) AC, DC cable shall be of ISI mark and reputed make.
5) Lightning arrestor shall be provided for each of the Solar Rooftop installations. It shall be of ISI mark
and reputed make.
6) The system cost shall be inclusive of supply of solar modules, invertors, mounting structure, AC DC
cables in RPVC conduit as per requirement on location (Rate include supply of minimum AC Cable
length Upto 30 Meter/Building), AC - DB, DC – DB, earthing, LA, Bidirectional meter, Solar AC Meter
and its installation. No any differential/additional Charges for LT Bidirectional meter will be
The rate quoted per kW for each project should be inclusive of all taxes. No rate revision under
this tender will be allowed in any circumstances.
7) The scope of regular cleaning of the modules for five years shall also be in the scope of Bidder.
The arrangement of required water etc for regular cleaning of the modules shall be in the scope
8) The payment terms towards the supply, Installation, commissioning and 5 years CMC shall be as
a) 100% of the order value upon certification of GEDA/third party approved by GEDA and
commissioning of the system upon installation of the bidirectional and solar meter and complete the
installation process with uploading of all documents on GEDA online portal., or as may be specified.
2. Installation certificate duly signed by beneficiary/GEDA official/third party showing its
commissioning date (date of bi-directional meter installation)
Note : Performance Guarantee for 5 years –CMC :
You have to Submit 20% of the order value against the equivalent amount of performance bank
guarantee/ Demand draft valid for a period of 5 years from the date of commissioning of the system.
(date of meter Installation).
Completion period:
The Project completion period shall be 180 days from the date of placement of order, completion
should mean, commissioning of the system, meaning commencement of injection of power to grid.
The delay if any in the specific completion period shall be dealt with on the basis of the certified
documentary evidence of the single line diagram (SLD) drawing, submission and approval to CEI,
estimate generation and payment to DISCOM and application submission and approval of CEI for
charging of system.
For different site location you have to provide separate gang. Within 180 days’ time limit you
have to complete work of all four locations.
TECHNICAL SPECIFICATIONS FOR GRID CONNECTED SPV SYSTEMS
The specifications of SPV systems, for which EOI are invited, are as under. The self-certified Test
Report(s) of each of the components/ systems mentioned shall be submitted before starting System
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
installation. To ensure optimum performance of the solar installation and its related safety aspects,
the provisions of the publication of GERMI on “Best Practices in Operation and Maintenance of Roof
Top Solar PV systems in India” published in May, 2018 be followed.
The proposed projects shall be commissioned as per the technical specifications given below. Any
short comings will lead to cancelation of Empanelment as may be decided by GETCO. The
specifications, in the GERC Regulation on Net Metering shall also be applicable.
A Grid Tied Solar Rooftop Photo Voltaic (SPV) power plant consists of SPV array, Module Mounting
Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT),
Inverter, and Controls & Protections, interconnect cables, solar meter, bi-directional energy meter
and switches. PV Array is mounted on a suitable structure. Grid tied SPV system is without battery
and should be designed with necessary features to supplement the grid power during daytime.
Components and parts used in the SPV power plants including the PV modules, metallic structures,
cables, junction box, switches, PCUs etc., should confirm to the BIS, IEC, or international
specifications, wherever such specifications are available and applicable.
Solar PV system shall consist of following equipment/components.
1. Solar Photo Voltaic (SPV) modules consisting of required number of Crystalline PV modules.
2. Inverter and Remote Monitoring System.
3. Module mounting structures.
4. Energy Meter.
5. Array Junction Boxes.
6. DC Distribution Box.
7. AC Distribution Box.
8. Protections – Earthing, Lightning, Surge.
10. Drawing & Manuals.
11. Miscellaneous.
a. SOLAR PHOTOVOLTAIC MODULES:
1.1.1 The PV modules and Solar Cell used should be made in India. Necessary documents in this
regards must be provided to GETCO.
Violation of norms of Domestic Content Requirement (DCR) UNDER Solar PV projects will lead
to penalties and actions as mentioned in office memorandum of MNRE GOI vide letter no.
283/2018-GRID SOLAR dated 20th February, 2018 as under:
a)Filing of criminal case under IPC 420 and related Sec.
b)Blacklisting f developers for period of 10 years
c)Forfeiting of relevant bank guarantee(s)
d)Disciplinary case against the Officers of concerned CPSU/ State Govt.
e)Any other action , in addition to those above
SPV Modules and Solar Cells must be used for this Scheme shall be domestically manufactured as per
MNRE’s requirement. The Empanelled Agencies shall require to submit the Self declaration, regarding
the Modules and Solar cells used under the Scheme are “Made in India”, from the concerned
manufacturer of Solar Modules, supplied for this scheme of GoG/GOI, before commissioning of the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
System. Violation of this condition will be reported to the MNRE and GoG for taking actions against the
Manufacturer of the Solar Modules and Empanelled Agency. Such firm and Empanelled Agency may be
put under the black list or stop deal list as may be decided by the DISCOM Authority.
In absence of the ALMM, the Empanelled Agencies shall have to submit self-declaration regarding
domestically manufactured Cell and Modules used in the SPV System in this project. Whenever, the
ALMM list published by the MNRE, the Model and Manufactures of the Module and Cell shall be from
the ALMM only used in the SPV System in this project.
The PV modules used must qualify to the latest edition of IEC standards or equivalent BIS standards,
i.e. IEC 61215/IS14286, IEC 61853-Part I/IS 16170-Part I, IEC 61730 Part-1 & Part 2. For the PV modules
to be used in a highly corrosive atmosphere throughout their lifetime, they must qualify to IEC
a) The total solar PV array capacity should not be less than allocated capacity (kWp) and should
comprise of solar crystalline modules of minimum 520 Wp. Module capacity less than
watts shall not be accepted
b) Protective devices against surges (SPD) at the PV module shall be provided. Low voltage drop
bypass diodes shall be provided. Surge Protective Device (SPD) of appropriate capacity & type
shall be provided either in the inverter or in DC Junction Box for protection against surges.
Low voltage drop bypass diodes shall be provided.
C) PV modules must be tested and approved by one of the NABL accredited and BIS Approved
d) The module frame shall be made of corrosion resistant materials, preferably having anodized
e) The bidder shall carefully design & accommodate requisite numbers of the modules to
achieve the rated power in his bid.
f) The PV Module efficiency should be higher than 17 %.
Solar PV modules of minimum fill factor 75%, to be used.
g) Other general requirement for the PV modules and sub systems shall be the following:
I. The rated power of solar PV module shall have maximum tolerance upto +3%.
II. The peak-power point current of any supplied module string (series connected
modules) shall not vary by +1% from the respective arithmetic means for all modules
and/or for all module strings (connected to the same MPPT), as the case may be.
The peak-power point voltage of any supplied module string (series connected
modules) shall not vary by + 2% from the respective arithmetic means for all modules
and/or for all module strings (connected to the same MPPT), as the case may be.
III. All electrical parameters at STC shall have to be provided.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
IV. Minimum certified PV module efficiency shall be +17 % for crystalline The
temperature co-efficient power of the PV module shall be equal to or better than -
V. All PV modules should carry a performance warranty of >90% during the first 10 years,
and >80% during the next 15 years. Further, module shall have performance warranty
of >97% during the first year of installation. Degradation of module should not be more
than 1 % per annum.
The PV modules shall be equipped with IP 65 or better protection level junction box
with required numbers of bypass diodes of appropriate rating and appropriately sized
output power cable of symmetric length with MC4 or equivalent solar connectors.
The IP level for protection may be chosen based on following conditions:
i. An IP 65 rated enclosure is suitable for most outdoor enclosures that won’t
encounter extreme weather such as flooding.
ii. An IP 67 rated enclosure is suitable at locations which may encounter
temporary submersion at depths of up to one meter.
iii.An IP 68 enclosure is recommended if there may exist situations of
submergence for extended periods of time and at substantial depths.
1.1.3. Modules deployed must use a RF identification tag. The following information must be
mentioned in the RFID used on each modules (This can be inside or outside the laminate, but
must be able to withstand harsh environmental conditions).
a) Name of the manufacturer of the PV module
b) Name of the manufacturer of Solar Cells.
c) Month & year of the manufacture (separate for solar cells and modules)
d) Country of origin (separately for solar cells and module)
e) I-V curve for the module Wattage, Im, Vm and FF for the module
f) Unique Serial No and Model No of the module
g) Date and year of obtaining IEC PV module qualification certificate.
h) Name of the test lab issuing IEC certificate.
i) Other relevant information on traceability of solar cells and module as per ISO
j) Nominal wattage +3%.
k) Brand Name, if applicable.
Other details as per IS/IEC 61730-1 clause 11 should be provided at appropriate place. The
actual Power Output Pmax shall be mentioned on the label pasted on the back side of PV
Module. In addition to the above, the following information should also be provided:
i. Polarity of terminals or leads (color coding is permissible) on junction Box housing
near cable entry or cable and connector.
ii. The Maximum system voltage for which the module is suitable to be provided on the
back sheet of the module.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.1.4. Warranties:
a) Material Warranty:
i. Material Warranty is defined as: The manufacturer should warrant the Solar Module(s)
to be free from the defects and/or failures specified below for a period not less than
five (05) years from the date of commissioning.
ii. Defects and/or failures due to manufacturing
iii. Defects and/or failures due to quality of materials
iv. Non conformity to specifications due to faulty manufacturing and/or inspection
processes. If the solar Module(s) fails to conform to this warranty, the manufacturer
will repair or replace the solar module(s), at the Owners sole option.
b) Performance Warranty:
i. The predicted electrical degradation of power generated not exceeding 20%of the
minimum rated power over the 25 year period and not more than 10%after ten years
period of the full rated original output.
2. ARRAY STRUCTURE:
The mounting structure steel shall be as per latest IS 2062: 2011 and hot dip galvanization of
the mounting structure shall be in compliance of latest IS
Module Mounting Structure (MMS):
3.1. Supply, installation, erection and acceptance of module mounting structure (MMS) with
all necessary accessories, auxiliaries and spare part shall be in the scope of the work.
3.2. Module mounting structures can be made from two types of materials. They are Hot Dip
Galvanized Iron or Hot Dip Galvanized Mild Steel (MS). However, MS will be preferred for
raised structure.
3.3. MMS Steel shall be as per latest IS 2062:2011 and galvanization of the mounting structure
shall be in compliance of latest IS
3.4. All bolts, nuts, fasteners shall be of stainless steel of grade SS 304 or hot dip galvanized,
panel mounting clamps shall be of aluminum and must sustain the adverse climatic
conditions. Structural material shall be corrosion resistant and electrolytically compatible
with the materials used in the module frame, its fasteners, nuts and bolts.
3.5. The module mounting structures should have angle of inclination as per the site
conditions to take maximum insolation and complete shadow-free operation during
generation hours. However, to accommodate more capacity the angle of inclination may
be reduced until the plant meets the specified performance ratio requirements.
3.6. The Mounting structure shall be so designed to withstand the speed for the wind zone of
the location where a PV system is proposed to be installed. The PV array structure design
shall be appropriate with a factor of safety of minimum 1.5.
3.7. The upper edge of the module must be covered with wind shield so as to avoid build air
ingress below the module. Slight clearance must be provided on both edges (upper &
lower) to allow air for cooling.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
3.8. Suitable fastening arrangement such as grouting and clamping should be provided to
secure the installation against the specific wind speed. The Empanelled Agency shall be
fully responsible for any damages to SPV System caused due to high wind velocity within
guarantee period as per technical specification.
3.9. The structures shall be designed to allow easy replacement, repair and cleaning of any
module. The array structure shall be so designed that it will occupy minimum space
without sacrificing the output from the SPV panels. Necessary testing provision for MMS to
be made available at site.
3.10. Adequate spacing shall be provided between two panel frames and rows of panels to
facilitate personnel protection, ease of installation, replacement, cleaning of panels and
electrical maintenance.
3.11. The structure shall be designed to withstand operating environmental conditions for a
period of minimum 25 years.
3.12. The Rooftop Structures maybe classified in three broad categories as follows (drawings at
i. Ballast structure
a. The mounting structure must be Non-invasive ballast type and any sort of penetration of roof to
b. The minimum clearance of the structure from the roof level should be in between 70-150 mm to
allow ventilation for cooling, also ease of cleaning and maintenance of panels as well as cleaning
c. The structures should be suitably loaded with reinforced concrete blocks of appropriate weight
made out of M25 concrete mixture.
a. The structure design should be as per the slope of the tin shed.
b. The inclination angle of structure can be done in two ways-
b.1. Parallel to the tin shed (flat keeping zero-degree tiling angle), if the slope of shed in
Proper south direction
b.2. With same tilt angle based on the slope of tin shed to get the maximum output.
c. The minimum clearance of the lowest point from the tin shed should be more then 100mm.
d. The base of structure should be connected on the Purlin of tin shed with the proper riveting.
e. All structure member should be of minimum 2 mm thickness.
ii. RCC Elevated structure: It can be divided into further three categories:
A. Minimum Ground clearance (300MM – 1200 MM)
a. The structure shall be designed to allow easy replacement of any module and shall be in line
with site requirement. The gap between modules should be minimum 30MM.
b. Base Plate – Base plate thickness of the Structure should be 5MM for this segment.
c. Column – Structure Column should be minimum 2MM in Lip section / 3MM in C-Channel section.
The minimum section should be 70MM in Web side and 40MM in flange side in Lip section.
d. Rafter - Structure rafter should be minimum 2MM in Lip section / 3MM in C-Channel section. The
minimum section should be 70MM in Web side (y-axis) and 40MM in flange side (x-axis).
e. Purlin - Structure purlin should be minimum 2MM in Lip section. The minimum section should be
60MM in Web side and 40MM in flange side in Lip section.
f. Front/back bracing – The section for bracing part should be minimum 2MM thickness.
g. Connection – The structure connection should be bolted/welded completely. Leg to rafter should
be connected with minimum 12 diameter bolt. Rafter and purlin should be connected with
minimum 10 diameter bolt. Module mounting fasteners should be SS-304 only and remaining
fasteners either SS-304 or HDG 8.8 Grade.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
h. For single portrait structure the minimum ground clearance should be 500MM.
3.13. Material standards:
i. Design of foundation for mounting the structure should be as per defined standards which
clearly states the Load Bearing Capacity & other relevant parameters for foundation design (As
ii. Grade of raw material to be used for mounting the structures so that it complies the defined
wind loading conditions (As per IS 875 - III) should be referred as follows (IS 2062 – for angles
and channels, IS 1079 – for sheet, IS 1161 & 1239 for round pipes, IS 4923 for rectangular and
square hollow section)
iii. Test reports for the raw material should be as per IS 1852 / 808 / 2062 / 1079 /
iv. In process inspection report as per approved drawing & tolerance should be as per IS
v. For ascertaining proper welding of structure part following should be referred:
a. D.P. Test (Pin Hole / Crack) (IS 822)
b. Weld wire grade should be of grade (ER 70 S - 6)
vi. For ascertaining hot dip galvanizing of fabricated structure following should be referred: -
a. Min coating required should be as per IS 4759 & EN
b. Testing of galvanized material
Pierce Test (IS 2633)
Mass of Zinc (IS 6745)
Adhesion Test (IS 2629)
CuSO4 Test (IS 2633)
Superior High Grade Zinc Ingot should be of 99.999% purity (IS 209) (Preferably Hindustan Zinc
Limited or Equivalent).
vii. Foundation Hardware – If using foundation bolt in foundation then it should be as per IS
3.14. Design Validation- The Structure design and drawing should be duly verified by a licensed
Structural designer before installation for all types of structure arrangements including the
extension made, as per specification.
3. JUNCTION BOXES (JBs):
a) The junction boxes are to be provided in the PV array for termination of connecting cables.
The Junction Boxes (JBs) shall be made of GRP/FRP/Powder Coated aluminium /cast
aluminium alloy with full dust, water & vermin proof arrangement. All wires/cables must be
terminated through cable lugs. The JBs shall be such that input & output termination can be
made through suitable cable glands. Suitable markings shall be provided on the busbars for
easy identification and cable ferrules will be fitted at the cable termination points for
identification.
b) Copper bus bars/terminal blocks housed in the junction box with suitable termination threads
Conforming to IP65 standard and IEC 62208 Hinged door with EPDM rubber gasket to prevent
water entry. Single /double compression cable glands should be provided.
c) For array junction box/ PV combiner box, Empanelled Agency may also provide
polyamide glands and MC4 Connectors. The rating of the junction box shall be
suitable with adequate safety factor to interconnect the Solar PV array
d) Suitable markings shall be provided on the bus bar for easy identification and the cable
ferrules must be fitted at the cable termination points for identification.
e) Junction boxes shall be mounted on the MMS such that they are easily accessible and are
protected from direct sunlight and harsh weather.
4. DC DISTRIBUTION BOX (DCDB):
May not be required for small plants, if suitable arrangement is available in the inverter.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
a) DC Distribution Box (DCDB) to receive the DC output from the PV array field.
b) DC DBs shall be dust & vermin proof conform having. IP 65 or better protection, as per site
C The bus bars are made of EC grade copper of required size. Suitable capacity MCBs/MCCB
shall be provided for controlling the DC power output to the inverter a long with necessary
surge arrestors. MCB shall be used for currents up to 63Amperes, and MCCB shall be used for
currents greater than 63 Amperes
5. AC DISTRIBUTION BOX (ACDB):
a) AC Distribution Panel Board (DPB) shall control the AC power from PCU/inverter, and should
have necessary surge arrestors. Interconnection from ACDB to mains at LT Bus bar while in
grid tied mode.
b) All switches and the circuit breakers, connectors should conform to IEC60947:2019, part I, II
and III/ IS60947 part I, II and III.
c) The changeover switches, cabling work should be undertaken by the bidder as part of the
d) All the Panel’s shall be metal clad, totally enclosed, rigid, floor mounted, air -insulated,
cubical type suitable for operation on three phase / single phase,415 or 230 volts, 50 Hz
e) The panels shall be designed for minimum expected ambient temperature of 45 degree
Celsius, 80 percent humidity and dusty weather.
Particulars Details
Switching devices IGBT/MOSFET
Control Microprocessor /DSP
Nominal AC output voltage For 3-phase/ 1phase :- 415V / 240 V
Output frequency 50 Hz
Grid Frequency Synchronization range + 3 Hz or more
Ambient temperature considered -20° C to + 50° C
Humidity 95 % Non-condensing
Protection of Enclosure
IP-65(Minimum).
Grid Frequency Tolerance range + 3 or more
No-load losses Less than 1% of rated power
Inverter Efficiency(minimum) (Above 10 kW)
Peak Efficiency At least 97%, measure as
Euro Efficiency At least 96%, measure as
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Peak Efficiency At least 96%, measure as
Euro Efficiency At least 95%, measure as
Communication interface RS 485 with Modbus
Display type LCD for data display. LCD / LED for status
Protections Over voltage (both input and
Over current (both input and
Over/Under grid frequency
Over temperature
Short circuit
Surge voltage induced at output due
to external source
Anti-islanding
Recommended Alert/Indications Inverter ON
Inverter Under / Over Voltage
Inverter Overload
Inverter Over Temperature
Recommended LCD Display on Inverter Output power (W)
Daily Energy (Wh)
cumulative energy (Wh)
DC voltage (V)
DC current (A)
AC voltage (V)
AC frequency (Hz)
AC current (A)
Cumulative hours of operation (h).
a) The inverter shall have an RS-485 interface and support communication of its operational
parameters and logs over Modbus protocol. The register mapping/memory mapping of the
inverter data shall be made available by the Empanelled Agency from the inverter supplier to
the DISCOMs/GUVNL.
b) Three phase PCU/ inverter shall be used with each power plant system above 6KW and In
case of 6 KW or less Capacity single phase/3pahse inverter shall be used as per market
availability. In case of capacity addition of existing Solar plant, if the existing inverter is
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
required to be replaced, the cost same is to be borne by consumer up on mutual agreement
with Agency and consumer.
c) The output of power factor of PCU/ inverter is suitable for all voltage ranges or sink of
reactive power, inverter should have internal protection arrangement against any sustain
fault in feeder line and against the lightning on feeder.
d) Built-in meter and data logger to monitor plant performance through external computer shall
e) The power conditioning units / inverters should comply with applicable IEC/equivalent BIS
standard for efficiency measurements and environmental tests as per standard codes IEC
61683/IS 61683 and IEC 60068-2(1,2,14,30) /Equivalent BIS Std.
f) The charge controller (if any) / MPPT units environmental testing should qualify IEC 60068-
2(1, 2, 14, 30)/Equivalent BIS std. The junction boxes/enclosures should be IP 65(for
outdoor)/ IP 54 (indoor) and as per IEC 529 Specifications.
g) The PCU/ inverters should be tested from the MNRE approved test centers /NABL /BIS /IEC
accredited testing- calibration laboratories. In case of imported power conditioning units,
these should be approved by international test houses. Valid type test report shall be
submitted by the empanelled agency before commissioning of the SPV System.
h) All inverters shall be IEC 61000 compliant for electromagnetic compatibility, harmonics,
i) Maximum Power Point Tracker (MPPT) shall be integrated in the PCU/inverter to maximize
energy drawn from the array.
j) The PCU/ Invertor shall have overloading capacity of minimum 10%
k) The allowable capacity of inverter shall be (+15/-10 %) of registered AC Capacity.
8. INTEGRATION OF PV POWER WITH GRID:
The output power from SPV would be fed to the inverters which converts DC produced by SPV
array to AC and feeds it into the main electricity grid after synchronization.
In the event of a power failure on the electric grid, it is required that any independent
power-producing inverters attached to the grid turn off in a short period of time. This
prevents the DC-to-AC inverters from continuing to feed power into small sections of the
grid, known as “islands.” Powered islands present a risk to workers who may expect the area
to be unpowered, and they may also damage grid-tied equipment. The Rooftop PV system
shall be equipped with islanding protection. In addition to disconnection from the grid (due
to islanding protection) disconnection due to under and over voltage conditions shall also be
A manual disconnect 4 pole isolation switch beside automatic disconnection to grid would
have to be provided at utility end to isolate the grid connection by the utility personnel to
carry out any maintenance. This switch shall be locked by the utility personnel.
9. DATA ACQUISITION SYSTEM / PLANT MONITORING
i. Data Acquisition System shall be provided for each of the solar PV plant.
ii. Remote Monitoring and data acquisition through Remote Monitoring System software at the
GETCO location with latest software/hardware configuration and service connectivity for
online / real time data monitoring/control complete to be supplied and operation and
maintenance/control to be ensured by the Empaneled Agency. Provision for interfacing these
data on GETCO server and portal in future shall be kept as per requirement.
iii. Empanelled agency shall ensure that Inverter should have provision of remote monitoring of
inverter data through sim card or through Wi-Fi. Required website/mobile app platform,
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
where the user (Consumer) can access the data, should be provided/explained to consumer
while installation by Empanelled Agency. The facility of in-built wifi module or
communication through sim-card should also be explained to the consumer.
Recurring cost of sim card/Data pack for communication shall be borne by consumers. All the
inverter data should be made available to GETCO for monitoring by giving web access by
sharing the user ID and password. SIM-card cost, Periodic data charges towards data pack and
Internet/Wifi connectivity for maintaining Remote Monitoring System shall be the
responsibility of Beneficiary.
a) The bi-directional electronic energy meter (0.5S class) shall be installed for the measurement
of Import/Export of energy in co-ordination with GETCO.
b) Reverse power relay shall be provided by bidder (if necessary), as per the local DISCOM
A Roof Top Solar (RTS) Photo Voltaic (PV) system shall consist of following energy meters:
i. Net meter: To record import and export units
ii. Generation meter: To keep record for total generation of the plant.
3.15. The installation of Generation meters including CTs & PTs, wherever applicable, shall be
carried out by the Empanelled Vendor as per the terms, conditions and procedures laid
down by the concerned GERC/GETCO.
11. POWER CONSUMPTION:
a) Regarding the generated power consumption, priority need to give for internal consumption
first and thereafter any surplus power can be injected in to the grid.
12. PROTECTIONS
The system should be provided with all necessary protections like earthing, Lightning, and grid
islanding as follows:
12.1. LIGHTNING PROTECTION:
i. The SPV power plants shall be provided with lightning & over voltage protection, if required. The
main aim in this protection shall be to reduce the overvoltage to a tolerable value before it
reaches the PV or other sub system components. The source of over voltage can be lightning,
atmosphere disturbances etc.
ii. The entire space occupying the SPV array shall be suitably protected against Lightning by
deploying required number of Lightning Arrestors (LAs). Lightning protection should be provided
as per NFC17-102:2011/IEC 62305 standard.
iii. The protection against induced high-voltages shall be provided by the use of Metal Oxide Varistors
(MOVs)/Franklin Rod type LA/Early streamer type LA.
iv. The current carrying cable from lightning arrestor to the earth pit should have sufficient current
carrying capacity according to IEC 62305. According to standard, the minimum requirement for a
lightning protection system designed for class of LPS III is a 6 mm2 copper/ 16 mm2 aluminum or GI
strip bearing size 25*3 mm thick). Separate pipe for running earth wires of Lightning Arrestor shall
12.2. SURGE PROTECTION
i. Internal surge protection, wherever required, shall be provided.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
ii. It will consist of three SPD type-II/MOV type surge arrestors connected from +ve and –ve
terminals to earth.
12.3. EARTHING PROTECTION
i The earthing shall be done in accordance with latest Standards.
ii. Each array structure of the PV yard, Low Tension (LT) power system, earthing grid for switchyard,
all electrical equipment, inverter, all junction boxes, etc. shall be grounded properly as per IS 3043-
iii. All metal casing/ shielding of the plant shall be thoroughly grounded in accordance with CEA
Safety Regulation 2010. In addition, the lightning arrester/masts should also be earthed inside the
iv. Earth resistance should be as low as possible and shall never be higher than 5 ohms.
v. separate three earth pits shall be provided for individual three earthing viz.: DC side earthing, AC
side earthing and lightning arrestor earthing.
12.4. GRID ISLANDING:
i. In the event of a power failure on the electric grid, it is required that any independent
power-producing inverters attached to the grid turn off immediately. This prevents the DC-
to-AC inverters from continuing to feed power into small sections of the grid, known as
“islands.” Powered islands present a risk to workers who may expect the area to be
unpowered, and they may also damage grid-tied equipment. The Rooftop PV system shall be
equipped with Anti islanding features. In addition to disconnection from the grid (due to
islanding protection) disconnection due to under and over voltage conditions shall also be
ii. A manual disconnect 4 / 2 pole isolation switch (RCCB may also be used) beside automatic
disconnection to grid would have to be provided at utility end to isolate the grid connection
by the utility personnel to carry out any maintenance.
Cables of required size to be used in the system shall have the following characteristics:
i. Shall meet IEC 60227/IS 694, IEC 60502/IS1554 standards
ii. Temp. Range: –10°C to +80°C.
iii. Voltage rating 660/1000V
iv. Excellent resistance to heat, cold, water, oil, abrasion, UV radiation
vi. Sizes of cables between array interconnections, array to junction boxes, junction boxes to
Inverter etc. shall be so selected to keep the voltage drop (power loss) of the entire solar
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
system to the minimum. The cables (as per IS) should be insulated with a special grade PVC
compound formulated for outdoor use.
vii. Cable Routing/ Marking: All cable/wires are to be routed in a RPVC pipe/ GI cable tray and
suitably tagged and marked with proper manner by good quality ferule or by other means so
that the cable easily identified.
viii. The Cable should be so selected that it should be compatible up to the life of the solar PV
panels i.e. 25 years.
ix. The ratings given are approximate. All the cables required for the plant are to be provided by
the bidder. Any change in cabling sizes if desired by the bidder/approved after citing
appropriate reasons.
x. Multi Strand, Annealed high conductivity copper conductor PVC type ‘A’ pressure extruded
insulation or XLPE insulation. Overall PVC/XLPE insulation for UV protection Armoured cable
for underground laying. All cable trays including covers to be provided. All cables conform to
latest edition of IEC/equivalent BIS Standards as specified below: BoS item / component
Standard Description Standard Number Cables General Test and Measuring Methods,
PVC/XLPE insulated cables for working Voltage up to and including 1100 V,UV resistant for
outdoor installation IS /IEC 69947. Aluminium cable may be used on the AC-side of the PV
xi. The size of each type of DC cable selected shall be based on minimum voltage drop however;
the maximum drop shall be limited to 1%.
xii. The size of each type of AC cable selected shall be based on minimum voltage drop however;
the maximum drop shall be limited to 2 %.
14. CONNECTIVITY
The maximum capacity for interconnection with the grid at a specific voltage level shall be as
specified in the GERC regulation for Grid connectivity and norms of DISCOM and amended
from time to time.
15. DRAWINGS & MANUALS:
i. Operation & Maintenance manual/user manual, Engineering and Electrical Drawings shall be
supplied along with the each power plant. The manual shall include complete system details
such as array lay out, schematic of the system, inverter details, working principle etc. Step
by step maintenance and troubleshooting procedures shall be given in the manuals and
provided to the beneficiary.
ii. ISI marked (wherever applicable) and reputed makes equipment be used.
16. SOLAR PV SYSTEM ON THE ROOFTOP
The Solar PV system on the rooftop of the premises will be installed for PV capacity
permitted by GETCO as per regulation issued by GERC.
17. SAFETY MEASURES:
The bidder shall take entire responsibility for electrical safety of the installation(s) including
connectivity with the grid and follow all the safety rules & regulations applicable as per Electricity
Act, 2003 and CEA Safety Regulation 2010 etc.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
18. DOCUMENTATION:
Operation & Maintenance manual / user manual shall be supplied along with the each power plant.
The manual shall include complete system details such as array lay out, schematic of the system,
inverter details, working principle etc. Step by step maintenance and troubleshooting procedures
shall be given in the manuals and provided to the beneficiary.
19. SHADOW ANALYSIS:
The shadow analysis report with the instrument such as Solar Pathfinder or professional shadow
analysis software of each site has to be submitted by Bidder and shall be his responsibility to
educate the user to install the system only in shadow free space. Lower performance of the
system due to shadow effect shall be the responsibility of the bidder and shall be liable for
penalty for lower performance.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Quality Certification, Standards and Testing for Grid-Connected Rooftop Solar PV
Systems/Power Plants
Solar PV Modules/Panels
IEC 61215 and Design Qualification and Type Approval for Crystalline Silicon
IS 14286 Terrestrial Photovoltaic (PV) Modules
IEC 61701:2011 Salt Mist Corrosion Testing of Photovoltaic (PV) Modules
IEC 61853- 1:2011 / Photovoltaic (PV) module performance testing and energy rating
IS 16170-1:2014 –: Irradiance and temperature performance measurements, and
IEC 62716 Photovoltaic (PV) Modules – Ammonia (NH3) Corrosion Testing (as
per the site condition like dairies, toilets etc)
IEC 61730-1,2 Photovoltaic (PV) Module Safety Qualification – Part 1:
Requirements for Construction, Part 2: Requirements for Testing
IEC 62804 Photovoltaic (PV) modules – Test method for detection of
potential-induced degradation. IEC 62804-1: Part 1: Crystalline
Solar PV Inverters
IEC 62109 or Safety of power converters for use in photovoltaic power systems
IS : 16221 – Part 1: General requirements, and Safety of power converters
for use in photovoltaic power systems
Part 2: Particular requirements for inverters. Safety compliance
(Protection degree IP 65 or better for outdoor mounting, IP 54 or
better for indoor mounting)
IS/IEC 61683 latest Photovoltaic Systems – Power conditioners: Procedure for
(as applicable) Measuring Efficiency (10%, 25%, 50%, 75% & 90-100% Loading
IEC 60068-2 /IEC Environmental Testing of PV System – Power Conditioners and
62093 Inverters
(as applicable)
IEC 62116:2014/ IS16169 Utility-interconnected photovoltaic inverters - Test procedure of
islanding prevention measures
IS/IEC 60947 (Part General safety requirements for connectors, switches, circuit
1, 2 & 3), EN breakers (AC/DC):
50521 1)Low-voltage Switchgear and Control-gear, Part 1: General rules
2)Low-Voltage Switchgear and Control-gear, Part 2: Circuit Breakers
3)Low-voltage switchgear and Control-gear, Part 3: Switches,
disconnectors switch-disconnectors and fuse-combination units
4) EN 50521: Connectors for photovoltaic system-Safety
requirements and tests
Low-voltage fuses - Part 6: Supplementary requirements for fuse-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
IEC 60269-6:2010 links for the protection of solar photovoltaic energy systems
Solar PV Roof Mounting Structure
IS 2062/IS 4759/AA6063 T6 Material for the structure mounting
Surge Arrestors
BFC 17-102:2011/ NFC Lightening Protection Standard
IEC 60364-5-53/ IS Electrical installations of buildings - Part 5-53: Selection and
15086-5 (SPD) erection of electrical equipment - Isolation, switching and control
IEC 61643- 11:2011 Low-voltage surge protective devices - Part 11: Surge protective
devices connected to low-voltage power systems -
Requirements and test methods
IEC 60227/IS 694, IEC General test and measuring method for PVC (Polyvinyl chloride)
60502/IS 1554 (Part 1 & insulated cables (for working voltages up to and including 1100 V,
2)/ IEC69947 (as and UV resistant for outdoor installation)
Electric cables for photovoltaic systems (BT(DE/NOT)258), mainly
BS EN 50618 for DC Cables
Earthing /Lightning
IEC 62561/IEC 60634 IEC 62561-1: Lightning protection system components (LPSC) -
Series (Chemical Part: Requirements for connection components
earthing) IEC 62561-2: Lightning protection system components (LPSC) –
(as applicable) Part 2: Requirements for conductors and earth electrodes
IEC 62561-7: Lightning protection system components (LPSC) -
Part 7: Requirements for earthing enhancing compounds
Junction boxes and solar panel terminal boxes shall be of the
thermo- plastic type with IP 65 or better protection for outdoor
IEC 60529 use, and IP 54 or better protection for indoor use
Guarantee and CMC: -
The Grid connected Solar Photovoltaic System for the project supplied, installed and commissioned
shall be guaranteed by the empanelled agency for a minimum period of 5- years from the date of
successfully commissioning of the last system, in regard to quality of design, material, workmanship,
quality of process/ manufacturing, performance, efficiency, installation, etc.
In the event any defect is found or developed in the system within guarantee period, shall be
rectified/replaced by the Empaneled Agency at his own expense promptly.
In case the defects are not rectified within 2 (Two) days of the receipt of the complaint by the
Empaneled Agency, GETCO shall have full liberty to rectify such defect or undertake such repairs as
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
may be necessary to restore the system in working condition at the risk and cost of the Empanelled
The expenditure so incurred by GETCO shall be deducted from EOI applicant’s pending claims,
security, etc. and if necessary may be recovered in other mode provided under the law. In the event
of failure of the complete system, if necessary, the whole system shall be replaced by the Empanelled
Agency promptly.
(b) CMC: - Comprehensive Maintenance Contract for 5 years:- (Resolving Complaints related to
defects/ non-working / poor performance of the system)
This EOI Document cover Five-year Comprehensive Maintenance Contract under the scope of EOI
The Five-year comprehensive Maintenance Contract shall include comprehensive on-site guarantee
and warranty for all materials and components of the system under the project as mentioned above
in para no 16(a) .
During this CMC period the Empanelled Agency has to repair/replace the defective part/s or the
material/s or any or all Components of the System to make it in working condition without loss of
performance or degradation in efficiency and without compromising safety aspects free of cost
within 48 (Forty eight) Hours of time limit as soon as the complaint is received from the GETCO. Also
the Empanelled Agency has to undertake regular/periodical preventive maintenance of the system to
avoid any future fault in the system and to improve the solar yield.
During the CMC period, the inverter monitoring, monitoring and controlling, shall be done by EOI
applicant. Hence necessary reports shall be submitted by the EOI applicant in the soft/hard copies
periodically to the concern authority of the GETCO as and when asked.
a) Logging of complain:
The record of each and every complaint received and resolve with down time and up time shall
have to be maintained by the Empanelled Agency in register as well as computer based software
and shall have to be submitted to GETCO office In each quarter.
b) While doing repairing or rectification work, the Empanelled Agency’s technician or any person is
not authorized to work on GETCO’s electric line of 11 KV and LT having potential danger of
In case the defects are not rectified within 2 (Two) days from the receipt of the complaint by
empaneled agencies than penalty of Rs 200 per day is applicable till the complaint is
This penalty shall be payable to GETCO, in case of empaneled agency failed to pay the same, it
will be recovered from the PBG or may be recovered in other mode provided under the law. In
the event of failure of the complete system, if necessary, the whole system shall be replaced by
empaneled agencies within 15 days failing which 0.5% per day plus GST and cess on the particular
project value subject to maximum of 10% of the project value plus applicable GST and cess to be
recovered from the PBG.
(C) Generation Guarantee:
The Capacity utilization factor CUF of the solar power plant shall not be less than 17% on
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
annual basis, during the five CMC period. The Capacity Utilization factor (CUF) shall be maintained
at 17% and necessary efforts shall be made to achieve it by the bidder. In case the system fails to
attain the required CUF annually, the system shall be deemed to underperforming. The calculation
of the CUF shall be on the generation recorded by the inverter/Solar system AC meter. The
shortfall of energy to achieve 17% CUF on the yearly bais shall be compensated by the bidder to
GEDA at the rate equivalent to the prevailing DISCOM tariff during the year. Failing which GEDA
may invoke the entire performance bank Guarantee. yearly
Periodical maintenance:
The record of down time and up time and periodical maintenance at least in every quarter shall have
to be maintained by the Empanelled Agency in register as well as computer based software and shall
have Mandatorily to be submitted to GETCO Circle office at the end of every Quarter. Non submission
of the report shall be considered as “Breach of Contract” and shall attract punitive actions like
encashment of PBG will be applicable and the decision of GETCO shall be final in this regard.
Notices, Statements and other communications sent by GETCO through registered post or e-mail or
fax to the EOI applicant / Empanelled Agency at his specified address shall be deemed to have been
delivered to the EOI applicant.
Installation of remote Monitoring facility along with necessary dongle etc. for the period of 5 Years.
The Scope of work covers cleaning and washing of the Photovoltaic modules regularly (Two times in a
month 0 to ensure annual capacity utilization factor of 17% during the five years CMC.
GUIDELINES FOR AGENCY:
1. It is mandatory for EOI applicant to have valid test report of SPV Modules and grid tie
inverters with similar or larger capacity from MNRE approved laboratories.
2. The program implementation guidelines of the MNRE, as declared from time to time, for SPV
program shall be applicable and followed at all times.
3. The technical specification, scope of work for which EOI Document is invited are furnished
in EOI Document
4. The quantity mentioned in the EOI Document is only indicative and not final. Payment will
be done only for the actual quantity executed.
5. Cost of Comprehensive Maintenance during Guarantee and warrantee period and Insurance
of system for 5 years is required to be included in the quoted prices.
6. The Empanelled Agency shall be responsible for overall project management, system
integration and testing to complete all criteria for successful functioning of the Grid
connected Solar PV plant, but not limited to the functions laid down in this documents.
2.2 The above cited requirements are only indicative. The owner reserves the right to requisition
any other relevant information and also reserves the right to reject the Bid proposal of any
Bidder, if in the Owner’s opinion the Qualification data is incomplete and Bidder is not
qualified to perform the Contract satisfactorily.
3.0 Bidding Costs - All costs/expenses in the preparation and submission of the Bid (including any
post Bid discussions/presentations) shall be fully borne by the Bidder. Owner will not be
responsible/liable for these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
5.0 Knowing the Bid Document
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms,
conditions and specifications in the Bid Documents and fully know himself all the conditions
and contents therein, which may in any manner, affect the scope & content of work and the
costs thereof. Submission of a Bid not substantially responsive to the Bid Document in all
respects and/or failure to furnish all information required by the Bid Document may entail
rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and
specifications or is in doubt as to the true meaning of any part, he shall make a request, in
writing not later than the date of pre Bid discussion, to the owner in triplicate. The owner
will issue explanations, interpretations and clarifications as deemed fit in writing as a
response to this request. On receipt of such interpretations/clarifications, the Bidder may
submit his Bid within the date and time stipulated in the Bid invitation, all such explanations,
interpretations and clarifications from the Owner shall be deemed as part of Bid Documents
and shall invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s)
or his representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason,
whether at his own initiative or in response to a clarification requested by the intending
Bidder, modify the Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have
received the Bidding Document at the address contained in the letter of request for issue of
bidding document from the Bidders. Owner will bear no responsibility or liability arising out
of non-receipt of the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into
account in preparing their bids, the Owner may, at his discretion, extend the deadline for
the submission of bids.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due
consideration by the Bidders while they submit their bids and shall invariably enclose such
documents as a part of the bid.
C. PREPARATION OF BIDS
8.0 Language of Bids
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid,
exchanged by the Bidder and the Owner, shall be written in the English language, provided
that any printed literature furnished by the Bidder may be written in another language so
long as accompanied by an English translation of its pertinent passages. Failure to comply
with this may disqualify a bid. For purposes of interpretation of the bid, the English
translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without
adding any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors,
which may have any effect on the execution of the Contract covered under these documents
and specifications. The Owner shall not entertain any request for clarifications from the
bidders, regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and
considered while submitting the proposals. No claim for financial adjustment to the Contract
awarded under these specifications and documents will be entertained by the owner. Neither
any change in the time schedule of the Contract nor any financial adjustments arising thereof
shall be permitted by the Owner, which are based on the lack of such clear information or its
effect on the cost of the works to the Bidder.
10.0 Documents comprising the Bid:
Requirements etc. furnished in the Bidding Documents, indicating, for the services to be
rendered, a brief description of services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the
Qualification Requirements as detailed in Clause 2.0 above and Special Conditions of
Contract (including Clause 11 of I TB).
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and
signed by wherever the Company Authorized Signatory specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific
11.0 Scope of the proposal
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely
covering all the equipment erection and other installation services specified under the
accompanying Technical Specifications. It will include among others as specified therein the
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain
conditions of the bidding documents permitted by the Owner and therefore, the Bidders are
advised that while making Bid Proposals and quoting prices these conditions may
appropriately be taken into consideration. Bidders are required to furnish a certificate in this
regard as per the format provided in Special Conditions of Contract in a separate sealed
envelope containing Bid security, which shall accompany the Technical Bid. Any Bid not
accompanied by such certificate shall be rejected by the Owner and shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and
hence rejected.
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical
Data Sheets and specified elsewhere. The Qualifying Data should be filled in the required
schedule of Bid Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the
it proposes to furnish under the contract. The %(Percentage) above/below indicated shall be
inclusive of GST applicable on required inputs and services.
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate (i.e. price) mentioned in the price bid shall be final and any additional GST
will have to be borne by the tenderer himself. In no case additional amount towards GST or
otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation
clause will not be applicable in case of Supplier /Contractor has opted for Composition
Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then COMPANY will
have the option to take the prices as exclusive of taxes and duties at maximum higher slab
rates for the evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e.
Schedule-B). The price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder
intends to supply the goods / services, meaning thereby the bidder has to supply the goods /
services from the relevant declared / registered place of supply only.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the
contract and shall not be subject to variation on any account saving for change in quantity. A
bid submitted with an adjustable price quotation shall be treated as non-responsive and
14.0 Taxes and Duties: -
14.1 As regards the income Tax, surcharge on income tax and any other tax excluding GST &
welfare cess at prevailing rate, the owner shall not bear any tax liability whatsoever. The
bidder shall be liable and responsible for payment of such taxes as attracted under the
provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause 14.1 above the owner shall have the
right to make deduction at source from the amounts payable to the contractor in respect of
Income Tax (on the cost of items of supply included in the works contract) as may be
mandatory in terms of the law. The owner shall not bear any liability in this regard but shall
issue necessary certificate in respect of such deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this contract
with effect from the next day of the date submission of the bid and if the contractor is
required to pay additional tax or duty, then the owner shall reimburse the contractor the
additional tax or duty so paid by the contractor against submission by the contractor of
documentary evidence to the satisfaction of the owner. This provision will not be applicable
to transaction between the contractor and his sub-contractors. Besides the said statutory
variation, no other statutory variation shall be payable by the owner.
14.4 The owner’s liability for all taxes and duties under the contract shall be limited to those
indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and
variations as per Clause No. 14.3.
If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or
reduced by reasons of the making, passing or promulgation of any law after the date of
submission of bid or by any order, regulation or bye-law having the force of law the amount
of such increase or reduction shall be added to or deducted from the “Contract Price” as the
case may be for direct transactions between contractor & owner, and not for bought out
items. It is the Bidders responsibility to furnish details of taxes, duties, levies etc. applicable
as on the date of submission of the bid.
14.5 No claim for any increase towards the statutory variation regarding enhancement of existing
tax or duty or introduction of a new tax or duty applicable shall be entertained by the Owner
during the extended period of contract, if any, provided the extension of the contract is
required by causes attributable to the contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty will be applicable only to the direct transaction between
the contractor and the owner.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
14.7 Before quoting, the bidder may ascertain from the concerned tax authorities of Government
of Gujarat the applicability of Tax (GST) etc in respect of this work and include the same in
the quoted price. No separate claim in this regard will be entertained by the Owner, as it is
the responsibility of the Bidder to pay all these taxes.
14.8 In addition, the conditions detailed under Special Conditions of Contract shall apply.
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the time
schedule for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the
major factors in consideration of the bids.
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses
titled Insurance, in General Terms and Conditions of Contract and in Erection Conditions of
this Part-I. Bidder’s attention is specifically invited to these clauses. Bid price shall include
all the costs in fulfilling all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special
equipment tools & tackles etc. which he proposes to bring to site for the purpose of erection,
handling, testing and commissioning including performance and guarantee tests of the
equipment. If any such equipment is listed anywhere else in the proposal and not specially
mentioned in the above schedule, it shall be deemed to have been included in the Bidder’s
proposed scope of supply.
18.0 Bid Security/EMD:
18.1: The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of
estimated cost plus GST to be paid as under:
a) In the form of RTGS/NEFT/Online.
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which
would warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid
guarantee shall be made payable to the Owner without any condition whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-
responsive. No exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or
three months from the date of submission of tender whichever is later.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract
performance guarantee
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies
within thirty days of letter of award of contract)
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 days of receipt of LOI.
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the value of
the order as a Security Deposit for satisfactory execution of the contract. Such Security
Deposit will be payable either in DD payable at Bharuch /Bank guarantees from following
Banks will be acceptable.
8.3 If the Contractor defaults in execution of the orders placed or if COMPANY suffers any
financial loss due to this, then COMPANY will forfeit Security Deposit, EMD plus GST as
applicable from other orders of the same firm or by encasing the Bank Guarantee
(A) Guarantees issued by the following Banks will be accepted as SD/EMD on permanent
1. All Nationalized Banks
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to
March 31, 2026. The validity cut-off date in GR is with respect to date of issue of Bank
Guarantee irrespective of date of termination of Bank Guarantee.
No. Bank Name No. Bank Name
1 AXIS Bank 22 South Indian Bank
2 AU Small Finance Bank 23 Standard Chartered Bank
3 Bandhan Bank 24 Tamilnadu Mercantile Bank
4 Barclays Bank 25 Utkarsh Small Finance Bank
5 City Union Bank 26 YES Bank
6 CSB Bank 27 Ahmedabad Mercantile Co-op. Bank
7 DBS Bank India Limited 28 Nutan Nagarik Sahakari Bank Ltd.
8 DCB Bank 29 Rajkot Nagarik Sahakari Bank Ltd
9 Equitas Small| Finance Bank 30 Saraswat Co-Operative Bank Ltd
10 ESAF Small Finance Bank 31 SBPP Co-Operative Bank Ltd.
11 FEDERAL Bank 32 SVC Co-Operative Bank LTD.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
12 HDFC Bank 33 The Cosmo Co-operative Bank Ltd
13 HSBC Bank 34 The Gujarat State Co-operative Bank
14 ICICI Bank 35 The Mehsana Urban Co-Op. Bank Ltd
15 IDBI Bank 36 The Surat District Co-Operative Bank Ltd
16 IDFC First Bank 37 The Surat People's Co-Op. Bank Ltd
17 Jammu and Kashmir Bank 38 Kalupir Commercial Co-Op Bank
18 Jana Small Finance bank 39 The Panchmahal District Co-Operative Bank
19 Karnataka Bank 40 The Baroda District Co-Operative Bank
20 Karur Vysya Bank 41 Baroda Gujarat Gramin Bank
21 Kotak Mahindra Bank 42 Saurashtra Gramin Bank
19.0 Format of Bid:
19.3 The Bidders must submit the qualifying data as required in Instructions to Bidders in separate envelope
sealed and enclosed in the envelope submitting proposals, super scribed as under:
Work of Survey, Design, Supply, Installation, Testing, commissioning with Comprehensive
Maintenance contract of 5 years for Solar Rooftop Projects on Control Room building at
220kV Zagadia S/s, 66kV Hansot S/s, 66kV Panoli-1 S/s, 66kV Ankleshwar A S/s, 66kV
Ankleshwar U, 66kV Ankleshwar B and 66kV Zagadia S/s under Zagadia AM Divison under
Bharuch TR Circle”.
19.4 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initiated by the person or persons signing
21.0 Contract Quality assurance:
21.1 The Bidder shall include in his proposal the Quality Assurance Program containing the overall quality
management and procedures which he proposes to follow in the performance of the Works during
various phases as detailed in relevant clause of the General Technical Conditions.
21.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed for the
execution of the Contract will be mutually discussed and agreed and such agreed Program shall form a
part of the Contract.
21.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being
supplied wherever specifically indicated in the tender document shall supply only from those vendors.
Such details shall be accompanied by their list of previous supplies made performance reports etc.
However, in case of orders are placed, specific approval shall be obtained from the owner for the
vendor-supplied materials.
22.0 Signature of Bids:
22.1 The bid must contain the name, residence and place of business of the person or persons making the
bid and must be signed and sealed by the Bidder with his usual signature. The names of all persons
signing should also be typed or printed below the signature.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
22.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s) or other
authorized representative(s).
22.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by the
President/Managing Director or by the Secretary or other person or persons authorized to bid on behalf
of such Corporation/Company in the matter.
22.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’,
‘Agent’ or other designation without disclosing his Principal will be rejected.
22.5 If it is found that two or more persons who are connected with one another either financially or as a
principal and agent have bid under different names without disclosing their connection then such bids
will be liable for rejection. Satisfactory evidence of authority of the person signing on behalf of the
Bidder shall be furnished with the bid.
22.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
22.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
24.0 Deadline for submission of bids:
24.1 Bidder has to submit bid on line on n-procure portal mandatory before due date.
25.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
26.0 Modification and withdrawal of bids:
26.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of
the modification or withdrawal is received by the Owner prior to the deadline prescribed for
submission of bids.
26.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of clause 23.0. The envelope should clearly indicate that the
modification is for the Technical bid. No bid modifications notice by Telex/Grams/Fax shall be
entertained by the Owner.
26.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of bids.
26.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the
expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of its bid
E. BID OPENING AND EVALUATION
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids (Cover –I, II, and III) in the presence of Bidder’s representatives
who choose to attend on the date and time mentioned for opening of bids in the Invitation to Bid or in
case any extension has been given thereto, on the extended bid opening date and time notified to all
the Bidders who have purchased the bidding document. The Bidder’s representatives who are present
shall sign a register evidencing their attendance.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the Owner, at
his discretion may consider appropriate, will be announced in the Technical Bid Opening.
27.3 The price bids (On line) of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present. The date &
time of opening the Price Bid shall be intimated to all such qualified bidders by Fax/Telex, at least
one week in advance besides inviting final price bid if found appropriate after evaluation of Technical
27.4 The Bidder’s name, lumpsum Bid Price, all discounts if any, modifications in the Price Bid and any such
other details as the Owner, at his discretion, may consider appropriate, will be announced/ furnished
in the Price Bid (On line) Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these
specifications and documents. All technically responsive bids shall then be examined to determine the
LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until
such time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids
are under consideration, Bidders and/or their representatives and other interested parties are advised
to refrain from contacting by any means, the owner and/or his employees/representatives on the
matters related to Bids under consideration.
29.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing
and no change in the price or substance of the bid shall be sought, offered or permitted.
30.0 Preliminary Examination:
30.1 The Owner will examine the bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have
been properly signed, and whether the bids are generally in order.
30.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the
unit price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a
discrepancy between the total bid amount and the sum of total costs, the latter shall prevail and the
total bid amount will be corrected accordingly. If there is a discrepancy between words and figures,
the amount advantageous to the Owner will prevail. If the Bidder does not accept the correction of
the errors as above, his Bid will be rejected and the amount of Bid Security will be forfeited. The
other. In the case of any inconsistency in the prices furnished in the specified prices schedules to be
identified in Bid Form for this purpose, the Owner shall be entitled to consider the highest price for
the purpose of evaluation and for the purpose of award of Contract use the lowest of the prices in
these schedules.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
30.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid
to the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one, which
conforms to all the terms and conditions of the Bidding Document without material deviations. A
material deviation is one which affects in any way the prices, quality, quantity or delivery period of
the equipment, completion of works or which limits in any way the responsibilities or liabilities of the
Bidder of any right of the Owner as required in these specifications and documents. The Owner’s
determination of a bid’s responsiveness shall be based on the contents of the bid itself without
recourse to extrinsic evidence.
30.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
30.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
attribute to material deviation, provided such waiver does not prejudice or affect the relative ranking
31.0 Evaluation of Price Bids:
31.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition will
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of
31.2 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall
be derived as under:
Differential Price (DP)=n1F1+n2F2….+nnFn, where F1, F2…..Fn are the various factors in Indian Rupees
per unit of parameter differential or deficiency in the equipment and services offered as stipulated in
these specifications: n1, n2…nn are the respective parameter differential or deficiency in the
corresponding units to be determined from the Bidder’s proposal. The above factors and corresponding
units of parameter differential are derived from the Technical Specifications, Data sheets and/or
Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value (D)
and from the Bidding Document while evaluating the bids. In determining the Rupee value of the
deviations the Owner will use parameters consistent with those specified in the specifications and
documents and or other information as necessary and available to the Owner.
31.3 Comparison of Bids
The bids shall be compared on the basis of lump sum prices (i.e., for erection services to be rendered
as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Q + DP + D, Where
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including other
components if any.)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
evaluated bid and, as a result of this comparison, the lowest bid will be selected for the award of the
AWARD OF CONTRACT
32.0 Award Criteria
32.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further that
the Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall be the
sole judge in this regard.
32.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with
the terms and conditions specified in the accompanying Technical Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject
all bids at time prior to award of contract, any without thereby incurring any liability to the affected
Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the grounds for the
Owner’s action.
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will
notify the successful Bidder in writing by registered letter or e mail or FAX, to be confirmed in writing
by registered letter, that his bid has been accepted.
34.2 The notification of award will attribute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 38 .0,
the Owner will promptly notify each unsuccessful Bidder and will discharge his bid security, pursuant to Clause
35.0 Signing of contract:
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the
Owner will send the Bidder the detailed of Award, incorporating all agreements between the parties.
35.2 Within 7 days of receipt of the detailed of Award, the successful bidder shall sign the same with date
and return it to the Owner.
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be
signed within 15 (Fifteen) days of notification of Award.
35.4 The contractor will have to give indemnity bond for material on Non-judicial Stamp paper of value Rs.
300/- to GETCO as per attached format. The cost of stamp paper will be borne by the contractor.
35.5 The contractor will have to give safety cum indemnity bond on Non-Judicial Stamp paper of value Rs.
300/- to GETCO against any possible claim of compensation for damage to contractor’s staff or any of
third party during the execution of work. The cost of stamp paper will be borne by the contractor.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
35.6 Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our
Transmission Circle, GETCO, Bharuch before commencement of works as per GETCO’s prescribed
Proforma .The cost of stamp paper will be borne by the contractor.
36.0 Contract Performance Guarantee:
36.1 As a contract Security deposit, the successful bidder, to whom the work is awarded, shall be required
to furnish a SD in form of Bank guarantee/DD from a Public Sector Indian bank/Scheduled, Commercial
Bank in the form to be furnished. The SD amount shall be equal to 5 percent (5%) of the Contract price
and it shall guarantee the faithful performance of the Contract in accordance with the terms and
conditions specified in these documents and specifications. the SD shall be valid up to 90 days after
the end of Work Completion Period.
SD amount shall be release after completion of total Installation and with bill payment.
Note : Performance Guarantee for 5 years –CMC :
You have to Submit 20% of the order value against the equivalent amount of
performance bank guarantee/ Demand draft valid for a period of 5 years from the date of
commissioning of the system. (date of meter Installation).
The Project completion period shall be 90 days from the date of placement of order,
completion should mean, commissioning of the system, meaning commencement of
injection of power to grid. The delay if any in the specific completion period shall be
dealt with on the basis of the certified documentary evidence of the single line
diagram (SLD) drawing, submission and approval to CEI, estimate generation and
payment to DISCOM and application submission and approval of CEI for charging of
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner: a) The
successful Bidder guarantees the successful and satisfactory operation of the equipment furnished and
erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors and
installed by him shall be free from all defects in design, material and workmanship and shall upon
written notice from the Owner fully remedy free of expenses to the Owner such defects as developed
under the normal use of the said equipment within the period of guarantee specified in the relevant
clause of the General Terms and Conditions in the Part-I/Special Conditions of Contract.
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract.
However, it is not to be trued as limiting the damages under clause entitled “Equipment Performance
Guarantee” in Technical Specifications, Part-II and damages stipulated in other clauses in the Bid
36.4 The performance guarantee will be discharged without any interest at the end of guarantee period,
unless otherwise specified in Special Conditions of Contract.
Signature of Contractor Superintending Engineer
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Engineer (TR.) CIRCLE GETCO, Bharuch or any of its
subsidiaries and shall include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and
shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to
time for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and
materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract
and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and the
related facilities are to be erected or installed and any adjacent land, paths, street or reservoir
which may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the contract
agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the works
including erection, testing and putting into satisfactory operation including successful completion of
performance and guarantee tests to be performed at Site by the Contractor including cost of
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to
inspect the equipment; stores or Works under the Contract and/or the duly authorized representative
1.12 ‘Notice of Award of Contract’/’Letter of Award’ shall mean the official notice issued by the Owner
notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over signature
and/or seal as the case may be.
1.20 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’,
‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words
and phrases of like importance are used the approval, judgment, direction etc. is understood to be a
function of the Owner/Engineer.
1.17 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
1.18 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine
and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract
1.19 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and
Guarantee Tests, as specified in the accompanying Technical Specifications or otherwise agreed in the
1.20 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which
cannot be detected during inspection, testing etc, based on the technology available for carrying out
1.21 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any :
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter
of the Contract.
1.22 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.23 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by provisions in other
parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be deemed to form an
integral part of the Contract:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract, the Special Conditions of Contract. and all other
documents included under Part-I, Part-II and Part-III.
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special terms
and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall be referred to
the Engineer whose decision shall be considered as final and binding upon the parties.
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or
on behalf of the Owner in connection therewith, to any person other than a person employed by the
Contractor in the performance of the Contract. Disclosure to any such employed person shall be made
in confidence and shall extend only so far as may be necessary for the purpose of such performance.
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
4.3 The Contractor shall not communicate or use in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the
site, dimensions, quantity, quality or other information, concerning the works unless prior written
permission has been obtained from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain
the property of the Owner and shall be returned (in all copies) to the Owner on completion of the
Contractor’s performance under the Contract if so required by the Owner.
5.0 TRANSMISSION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will
be treated as a single Contract. Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect of all
the equipment material equipment/materials given by the owner after observing standard store
procedures for transport from owner’s stores, insurance, unloading storage handling at site installation
testing & commissioning.
5.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch
documents be required to execute an Indemnity Bond in favour of the Owner in the form acceptable to
the Superintending Engineer (TR.) GETCO Bharuch for keeping the equipment in safe custody and to
utilize the same exclusively for the purpose of the said Contract. Samples of proforma for the
Indemnity Bond will be furnished during award of Contract.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
5.3 The Contract shall in all respects be trued and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of
deviations or modifications under the Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Bharuch shall
have exclusive jurisdiction in all matters arising under this Contract.
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
7.2 The Agreement, unless otherwise agreed to, shall be signed within 15 days of the acceptance of the
Letter of Award, at the office the Owner at Bharuch on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate power of
attorney and other requisite materials. In case the Contract is to be signed beyond the stipulated
time, the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one
signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be trued to be a waiver of
such provisions, rights or options or in anyway to affect the validity of the Contract. The exercise by
either party of any of its rights herein shall not preclude or prejudice either party from exercising the
same or any other right it may have under the Contract.
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the
clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
11.0 TIME – THE ESSENCE OF CONTRACT
11.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner
without or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to
be the essence of the Contract. The Contractor shall so organize his resources and perform his work as
to complete it not later than the date agreed to.
11.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate
number of activities covering various key phases of the work such as design, procurement,
manufacturing, shipment and field erection activities within seven (7) days of the date of LOI.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
11.3 The above bar chart shall be compatible with the Owner’s computer environment and furnished to the
Owner on such media as may be desired by the Owner.
12.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given
by the respective Transmission sub division unless otherwise provided in LOI.
13.0 PENALTY FOR DELAY
13.1 If the Contractor fails to successfully complete the commissioning within the time fixed under the
Contract, the Contractor shall pay to the Owner as penalty a sum specified for each specified period of
delay. The details of such penalty are brought out in the accompanying Special Conditions of Contract
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
Contract prices plus GST detailed in the Special Conditions of Contract (SCC).
14.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss
or damages, repairs or adjustment may be made by the Engineer or a third party chosen by the
Engineer without advance notice to the Contractor and the cost of such work shall be paid by the
Contractor. In the event such action is taken by the Engineer, the Contractor will be notified promptly
and he shall assist wherever possible in making necessary corrections. This shall not relieve the
Contractor of his liabilities under the terms and conditions of the Contract.
14.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the
provision of this clause shall apply to portion of the works so rectified or corrected until the expiry of
six (6) months from the date of such rectification or correction. If any defects are not rectified within
a reasonable time, the Engineer may proceed to do the work at the Contractor’s risk and cost but
without prejudice to any other rights which the Owner may have against the Contractor in respect of
14.3 The rectification or correction of the work will be carried out free of cost by the Contractor. If any
rectification or correction is carried out on his behalf at the site, the Contractor shall bear the cost of
such rectification or correction.
14.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations
under this clause.
15.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the
Owner or the Contractor in pursuance of the Contract. In addition, the Contractor shall be responsible
for payment of all Indian duties, levies and taxes lawfully assessed against the Contractor for his
personal income & property only.
16.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for the
failure, omission or neglect on the part of the Contractor to perform any acts, matters, covenants or
things under the Contract, or for damage or injury caused by the alleged omission or negligence on the
part of the Contractor, his agents, representatives or his Sub-Contractors, or in connection with any
claim based on lawful demands of Sub-Contractors, workmen, suppliers or employees, the Contractor
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
shall in all such cases indemnify and keep the Owner, and the Engineer and/or his representative,
harmless from all losses, damages, expenses or decrees arising of such action.
17.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor
from all his liabilities under the Contract. Such final payment shall be made only at the end of the
Guarantee/Warranty period or after finalization of material account and final bill and till such time as
the Contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments
made under the Contract shall be treated as on-account payments.
18.0 ENGINEER’S DECISION
19.0 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
19.1 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15)
days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
19.2 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent
to the right to request arbitration. It is the intent of the Agreement that there shall be no delay in the
execution of the works and the decision of the Engineer as rendered shall be promptly observed.
20.0 POWER TO VARY OR OMIT WORK
20.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to
as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the
Contractor except as directed in writing by the Engineer, but the Engineer shall have full powers
subject to the provisions hereinafter contained, from time to time during the execution of the
Contract, by notice in writing to instruct the Contractor to make such variation without prejudice to
the Contract. The Contractor shall carry out such variation and be bound by the same conditions as
far as applicable as though the said variations occurred in the Contract Documents. If any suggested
variations would, in the opinion of the Contractor, if carried out, prevent him from fulfilling any of his
obligations or guarantees under the Contract, he shall notify the Engineer thereof in writing and the
Engineer shall decide forthwith whether or not, the same shall be carried out and if the Engineer
confirms his instructions, the Contractor’s obligations and guarantees shall be modified to such an
extent as may be mutually agreed. Any agreed difference in cost occasioned by any such variation
shall be added to or deducted from the Contract Price as the case may be.
20.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials
are already prepared or any design, drawings or pattern made or work done as per the contract
requires to be altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
20.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement
of carrying out the alterations or additional or substituted work which either then or later on, will in
the opinion of the Contractor, involve a claim for additional payment, the Contractor shall
immediately and in no case later than thirty (30) days, after receipt of the instructions aforesaid and
before carrying out the instructions, advise the Engineer to that effect. But the Engineer shall not
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
become liable for payment of any charges in respect of any such variations, unless the instructions for
the performance of the same shall be confirmed in writing by the Engineer.
20.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing,
so to the extent of any change in the price, before the Contractor proceeds with the change.
20.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
20.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct
the Contractor, in writing, during the execution of the Contract to vary the quantities of the items or
groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section
GCC of this Volume-I. The Contractor shall carry out such variations and be bound by the same
conditions as though the said variations occurred in the Contract Documents. However, the Contract
Price shall be adjusted at the rates and the prices provided for the original quantities in the Contract.
21.0 CHANGE OF QUANTITY
21.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms &
conditions. Such variations unless otherwise specified in the accompanying Special Conditions of
Contract and/or Technical Specifications, shall not be subjected to any limitation for the individual
items but the total variations in all such items under the Contract shall be limited to a percentage of
the Contract price as specified in the Special Conditions of Contract.
21.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for
the change in quantities as above.
22.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers
and freely exchange with them such technical information as is necessary to obtain the most efficient
and economical design and to avoid unnecessary duplication of efforts. The Engineer shall be provided
with three copies of all correspondence addressed by the Contractor to other Contractors and
Consulting Engineers of the Owner in respect of such exchange of technical information, wherever
23.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor
any order by the Owner or the Engineer for payment of money or any payment for or acceptance of,
the whole or any part of the Works by the Owner or the Engineer, nor any extension of time, nor any
possession taken by the Engineer shall operate as a waiver of any provision of the Contract, or of any
power herein reserved to the Owner or any right to damages herein provided nor shall any waiver of
any breach in the Contract be held to be a waiver of any other or subsequent breach.
24.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the
rights of the Owner against the Contractor or relieve the Contractor of his obligation for the due
performance of the Contract, or be interpreted as approval of the Works done or of the equipment
furnished and no certificate shall create liability for the Owner to pay for alterations, amendments,
variations or additional works not ordered, in writing , by the Engineer or discharge the liability of the
Contractor for the payment of damages whether due, ascertained, or certified or not or any sum
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
against the payment of which he is bound to indemnify the Owner, nor shall any such certificate nor
the acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of the
Owner against the Contractor.
25.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own
cost submit periodic progress reports as may be reasonably required by the Engineer with such
materials as, charts, net-works, photographs, test certificates, etc. Such progress reports shall be in
the form and size as may be required by the Engineer.
26.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished and
erected by the Contractor, the Engineer shall issue to the Contractor a Taking Over Certificate as a
proof of the final acceptance of the equipment. Such certificate shall not unreasonably be withheld
nor will the Engineer delay the issuance thereof on account of minor omissions or defects which do not
affect the commercial operation and/or cause any serious risk to the equipment. Such certificate shall
not relieve the Contractor of any of his obligations which otherwise survive, by the terms and
conditions of the Contract after issue of such certificate.
27.1 The payment to the Contractor for the performance of the works under the Contract will be made by
the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfillment by the Contractor of all his liabilities under the Contract.
27.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
28.0 Payment Schedule
28.1 Application for Payment
28.2 The Contractor shall submit application for the payment in the prescribed Performa of the Owner.
Performa for application for payment will be as prescribed.
29.1 Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the equipment
shipped/brought on to the site pursuant to the Contract up to the date mentioned in the application
and for the period covered since the last preceding certificate, if any.
29.2 Every interim payment certificate shall certify the Contract value of the Works executed upto the date
mentioned in the application for the payment certificate, provided that no sum shall be included in
any interim payment certificate in respect of the works that, according to the decision of the
Engineer, does not comply with the Contract.
29.3 Mode of Payment
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
29.4 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank or directly
to the Contractor as per the payment schedule.
29.5 The payment of test charges, if any, payment, taxes and duties (whenever admissible) inland
transportation (including port handling), insurance and the erection portion of the Works shall be
made direct to the Contractor by the Owner.
29.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract
after signing the Contract Agreement. The payments linked with the dispatch of materials shall only be
made after production of all dispatch documents as specified in the relevant Contract conditions which
will interalia include the Material Inspection Clearance Certificate issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of
quality check points involved in the quantum of work billed.
C. CONTRACT SECURITY AND PAYMENTS
30.0 CONTRACT PERFORMANCE GUARANTEE
The Contractor shall furnish Contract Performance Guarantee(s) for the proper fulfillment of
the Contract in the prescribed form within fifteen (15) days of “Notice of Award of
Contract”. The performance guarantee(s) shall be as per terms prescribed.
31.1 The payment to the Contractor for the performance of the works under the Contract will be
made by the Owner as per the guidelines and conditions specified herein. All payments made
during the Contract shall be on account payments only. The final payment will be made on
completion of all Works and on fulfillment by the Contractor of all his liabilities under the
31.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment
of conditions specified thereof.
32.1 Application for Payment
32.2 The Contractor shall submit application for the payment in the prescribed proforma of the
Owner. Performa for application for payment will be as prescribed.
33.1 Each such application shall state the amount claimed and shall set forth in detail, in the
order of the Payment Schedule, particulars of the Works including the Works executed at Site
and of the equipment shipped/brought on to the site pursuant to the Contract upto the date
mentioned in the application and for the period covered since the last preceding certificate,
33.2 Every interim payment certificate shall certify the Contract value of the Works executed
upto the date mentioned in the application for the payment certificate, provided that no sum
shall be included in any interim payment certificate in respect of the works that, according
to the decision of the Engineer, does not comply with the Contract.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
34. Mode of Payment
34.1 Payment due on completion of work shall be made by the Owner through Owner’s Bank or
directly to the Contractor as per the payment schedule.
34.5.1 All payments under the Contract shall be made as stipulated in the Special Conditions of
Contract after signing the Contract Agreement.
Progressive payments linked with erection shall only be made after the issue of certificates
by the Engineer, one for the quantum of work completed and the other for the successful
completion of quality check points involved in the quantum of work billed.
35.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. The Owner to the
Contractor shall bill all such claims regularly as and when they fall due. Such bills shall be supported
by appropriate and certified vouchers or explanations, to enable the Contractor to properly identify
such claims. Such claims shall be paid by the Contractor within thirty (30) days of the receipt of the
corresponding bills and if not paid by the Contractor within the said period, the Owner may then
deduct the amount, from any money due or becoming due by him to the Contractor under the Contract
or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
36.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all
perils detailed herein. The form and the limit of such insurance as defined herein together with the
under-writer in each case shall be acceptable to the Owner. However, irrespective of such
acceptance, the responsibility to maintain adequate insurance coverage at all time during the period
of Contract shall be of Contractor alone. The Contractor’s failure in this regard shall not relieve him
of any of his contractual responsibilities and obligations. The insurance covers to be taken by the
Contractor shall be in the joint name of the Owner and the Contractor. The Contractor shall,
however, be authorized to deal directly with Insurance Company or Companies and shall be
responsible in regard to maintenance of all insurance covers. Further the insurance should be in freely
convertible currency.
36.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into
satisfactory operation and all activities to be performed till the successful completion of
commissioning of the equipment shall be to the account of the Contractor. The Contractor shall be
responsible for preference of all claims and make good the damages or loss by way of repairs and/or
replacement of the equipment, damaged or lost. The transfer of title shall not in any way relieve the
Contractor of the above responsibilities during the period of Contract. The Contractor shall provide
the Owner with copy of all insurance policies and documents taken out by him in pursuance of the
Contract. Such copies of documents shall be submitted to the Owner immediately after such insurance
coverage. The Contractor shall also inform the Owner in writing at least sixty (60) days in advance
regarding the expiry/cancellation and/or change in any of such documents and ensure revalidation,
renewal etc., as may be necessary well in time.
36.3 The perils required to be covered under the insurance shall include, but not be limited to fire and
allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in
transit, theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions,
accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods
and other costs till the equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be
liable to make good the full replacement/rectification value of all equipment/materials and to ensure
their availability as per project requirements.
36.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account
and will be included in Contract Price, However, the Owner may from time to time, during the
pendency of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and in
such a case, the parties to the Contract will agree for a mutual settlement, for reduction in Contract
price to the extent of reduced premia amount. The Contractor, while arranging the insurance shall
ensure to obtain all discounts on premia, which may be available for higher volume or for reason of
financing arrangement of the project.
36.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional insurance
requirements for the portion of the works to be performed at the Site.
36.6 Special Conditions of Contract details out the various insurance liabilities.
37.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
38.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
39.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or
his authorized agents, then the Contractor shall be given due extension of time for the completion of
the Works, to the extent such omission on the part of the Owner has caused delay in the Contractor’s
performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be
40.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if
such delays have resulted in any increase in cost. The Owner shall examine the justification for such a
request for claim and if satisfied, the extent of compensation shall be mutually agreed depending
upon the circumstances at the time of such an occurrence.
41.0 FORCE MAJEURE
41.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence
could not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics:
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the
other in writing of such causes.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
41.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
42.0 SUSPENSION OF WORK
42.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works
without invalidating the provisions of the Contract. Orders for suspension or reinstatement of the
Works will be issued by the Engineer to the Contractor in writing. The time for completion of the
works will be extended for a period equal to duration of the suspension.
42.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the
works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to some
default on the part of the Contractor or his Sub-Contractor.
43.0 CONTRACTOR`S DEFAULT
43.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse
or neglect to comply with any reasonable order given to him, in writing by the Engineer in connection
with the works or shall contravene the provisions of the Contract, the Owner may give notice in
writing to the Contractor to make good the failure, neglect or contravention complained of. Should
the Contractor fail to comply with the notice within thirty (30) days from the date of serving the
notice, then and in such case the Owner shall be at liberty to employ other workmen and forthwith
execute such part of the works as the Contractor may have neglected to do or if the Owner shall think
fit, without prejudice to any other right he may have under the Contract to take the work wholly or in
part out of the Contractor’s hands and re-contract with any other person or persons to complete the
works or any part thereof and in that event the Owner shall have free use of all Contractor’s
equipment that may have been at the time on the Site in connection with the works without being
responsible to the Contractor for fair wear and tear thereof and to the exclusion of any right of the
Contractor over the same, and the Owner shall be entitled to retain and apply any balance which may
otherwise be due on the Contract by him to the Contractor, or such part thereof as may be necessary,
to the payment of the cost of executing the said part of the Works or of completing the Works as the
case may be. If the cost of completing of works or executing part thereof as aforesaid shall exceed the
balance due to the Contractor shall pay such excess. Such payment of excess amount shall be
independent of the liquidated damages for delay which the Contractor shall have to pay if the
completion of works is delayed.
43.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to
pay liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
43.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not
entitle the Contractor to reduce the value of the Contract Performance Guarantee nor the time
thereof. The Contract Performance Guarantee shall be valid for the full value and for the full period
of the Contract including guarantee period.
44.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
44.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other
than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event
give fifteen (15) days’ notice in writing to the Contractor of his decision to do so.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
44.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts
to the extent they are related to the work terminated and terms satisfactory to the Owner, stop all
further sub-contracting or purchasing activity related to the work terminated, and assist Owner in
maintenance, protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
44.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and
if the Contractor is a partnership concern and one of the partners dies then unless the Owner is
satisfied that the legal representatives of the individual Contractor or of the proprietor of the
propriety concern and in the case of partnership, the surviving partners, are capable of carrying out
and completing the Contract the Owner shall be entitled to cancel the Contract as to its incompleted
part without being in any way liable to payment of any compensation to the estate of deceased
Contractor and/or to the surviving partners of the Contractor’s firm on account of the cancellation of
the Contract. The decision of the Owner that the legal representatives of the deceased Contractor or
surviving partners of the Contractor’s firm cannot carry out and complete the Contract shall be final
and binding on the parties. In the event of such cancellation the Owner shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased Contractor and/or
the surviving partners of the Contractor’s firm liable to damages for not completing the Contract.
45.0 FRUSTRATION OF CONTRACT
45.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section
of the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance
portion of the Contract, subject to provisions contained in sub-clause 45.3 below.
45.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason
of willful or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties
hereto shall be relieved from carrying out further obligations under the Contract treating it as
frustration of the Contract.
45.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to arrive at
reasonable settlement on all issues including amounts due to either party for the work already done on
quantum merit_ basis, which shall be determined by mutual agreement between the parties.
46.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor
or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their
behalf in relation to the obtaining or to the execution of this or any other Contract with the Owner,
shall in addition to any criminal liability which it may incur, subject the Contractor to the cancellation
of this and all other Contracts and also to payment of any loss or damage to the Owner resulting from
any cancellation. The Owner shall then be entitled to deduct the amount so payable from any money
otherwise due to Contractor under the Contract.
RESOLUTION OF DISPUTES
47.0 SETTLEMENT OF DISPUTES
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
47.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
47.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the progress
of the Works or after its completion or whether before or after the termination, abandonment or
breach of the Contract, it shall, in the first place, be referred to and settled by the Engineer, who,
within a period of thirty (30) days after being requested by either party to do so, shall give written
notice of his decision to the Owner and the Contractor.
47.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and
binding upon the parties until the completion of the Works and shall forthwith be given effect to by
the Contractor who shall proceed with the Works with all due diligence, whether he or the Owner
requires arbitration as hereinafter provided or not.
47.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has
been communicated to him by either party within thirty (30) days from the receipt of such notice, the
said decision shall become final and binding on the parties.
47.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after
being requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied
with any such decision, or within thirty (30) days after the expiry of the first mentioned period of
thirty days, as the case may be, either party may require that the matters in dispute be referred to
arbitration as hereinafter provided.
48.0 ARBITRATION
48.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not become
final or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
48.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the Contractor
and the Owner and the third to be appointed as an umpire by both the arbitrators in accordance with
the Indian Arbitration Act. If either of the parties fails to appoint its arbitrator within sixty (60) days
after receipt of a notice from the other party invoking the Arbitration clause, the arbitrator appointed
by the party invoking the arbitration clause shall become the sole arbitrator to conduct the
48.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration Act,
1940 or any statutory modification thereof. The venue of arbitration shall be Bharuch.
48.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for making
the award. In the event of any of the aforesaid arbitrators dying, neglecting, resigning or being unable
to act for any reason, it will be lawful for the party concerned to nominate another arbitrator in place
of the outgoing arbitrator.
48.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction,
certification or valuation of the Engineer in accordance with the Contract, and neither party shall be
limited in the proceedings before such arbitrators to the evidence or arguments put before the
Engineer for the purpose of obtaining the said decision.
48.4 No decision given by the Engineer in accordance with the foregoing provisions shall disqualify him as
being called as a witness or giving evidence before the arbitrators on any matter whatsoever relevant
to the dispute or difference referred to the arbitrators as aforesaid.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
48.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to carry out
their respective obligations under the Contract.
49.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every month, a statement covering payments claimed and the
payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner. The
Contractor shall also prepare and submit a detailed account of Owner Issue materials received and
utilized by him for reconciliation purpose in a format to be discussed & finalized with the Owner
before the award of Contract.
Signature of Contractor
Superintending Engineer
GETCO, CO, Bharuch
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these specifications
& document and shall govern the portion of the work of this Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his representative
at Site suitably designated for the purpose of overall responsibility and coordination of the works to
be performed at Site. Such person shall function from the Site office of the Contractor during the
pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the
Payment of Wages Act (both of the Government of India) and the rules made thereunder in respect of
any employee or workman employed or engaged by him or his Sub-Contractor. He shall abide by labour
laws and others as specified in the special conditions of contract.
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract
shall be to the account of the Contractor. Should any such inspection or registration need to be re-
arranged due to the fault of the Contractor or his Sub Contractor, the additional fees to such
inspection and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection, testing and
commissioning of the equipment to be supplied & erected under the Contract. The Owner shall
continue to hold the lien on all such equipment throughout the period of Contract. No material
brought to the Site shall be removed from the Site by the Contractor and/or his Sub-Contractors
without the prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in
reasonable time.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the
Owner may approve and the Owner shall give the Contractor reasonable facilities for carrying out the
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site, except by the
special permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative, shall
be communicated to the said authorized resident representative of the Contractor and the
representative shall be available at a stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the Owner
and doing work in the vicinity of the Works under the Contract. The Contractor shall also so arrange
to perform his work as to minimize, to the maximum extent possible, interference with the work of
other Contractors and their workmen. Any injury or damage that may be sustained by the employees
of the other Contractors and the Owner, due to the Contractor’s work shall promptly be made good at
the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence of any
representative or employee of the Contractor at the Site, if in the opinion of the Engineer such
employee has misconduct himself or is incompetent or negligent or otherwise undesirable and then the
Contractor shall remove such a person objected to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method of
work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the field
activities. Such reviews shall also not be considered as an assumption of any risk or liability by the
Engineer or the Owner or any of his representatives and no claim of the Contractor will be entertained
because of the failure or inefficiency of any such plan or schedule or method of work reviewed. The
Contractor shall be solely responsible for the safety, adequacy and efficiency of plant and equipment
and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the
safety of all persons employed by him or his Sub–Contractor and all the properties under his custody
during the performance of the work. This requirement shall apply continuously till the completion of
the Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall
highlight comparison to the schedules. The report shall also indicate the reasons for the variance
between the scheduled and actual progress and the action proposed for corrective measures, wherever
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours schedule for
the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged
works to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances
and other payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency under
any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour
Regulation Abolition Act or any other law due to act of omission of the Contractor, the Owner may
make such payment and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at
site, land for Transmission of Contractor’s field office, workshop, stores, etc. required for execution of
the Contract. Any such temporary Transmission shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer. Until and
unless the Contractor has handed over the vacant possession of land allotted to him for the above
purpose, the payment of his final bill shall not be made.
13.2 Electricity:
Where power supply is available with the Owner for Transmission purpose the same will be provided at
the job site at one point of the distribution system as may be decided by Engineer. Electricity
furnished will be 440 volts, 3 phase, 50 cycles and 230 volts, 1 phase, 50 cycles. Each Contractor shall
provide and install all necessary transformers, switchgears, wiring fixtures, bulbs and other temporary
equipment for further distribution and utilization of energy for power and lighting and shall remove
the same on completion of the work. Should, however, electricity be used in the Contractor’s
labour/staff colony, the power so consumed shall be charged at the prevailing tariff rate of the GUVNL
as prevalent for that area at the time of award of work; the supply may be withdrawn if the power is
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
used for purposes other than for the work of the project and the Contractor shall not be entitled to
any claim whatsoever on account of any such action taken by the Engineer. For this purpose,
contractor shall have to apply to DISCOM for separate temporary connection on his name.
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the Transmission equipments; tools, tackles and scaffoldings required
for pre-assembly, erection, testing and commissioning of the equipment covered under the Contract.
He shall submit a list of all such materials to the Engineer before the commencement of work at Site.
These tools and tackles shall not be removed from the Site without the written permission of the
14.3 The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personnel shall be trained in
administering first-aid.
14.4 Cleanliness
14.4.1 The Contractor shall be responsible for keeping the entire area allotted to him clean and free from
rubbish, debris etc. during the period of Contract. The Contractor shall employ enough number of
personnel to keep the work area clean. Materials and stores shall be so arranged to permit easy
cleaning of the area. In areas where equipment might drip oil and cause damage to the floor surface,
a suitable protective cover of a flame resistant, oil proof sheet shall be provided to protect the floor
from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings. The
Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical control
points will be established and marked by the Engineer at site at suitable points. These points shall be
used as datum for the works under the Contract. The Contractor shall inform the Engineer well in
advance of the times and places at which he wishes to do work in the area allotted to him so that
suitable datum points may be established and checked by the Engineer to enable the Contractor to
proceed with his works. Any work done without being properly located may be removed and/or
dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize fire
hazards to the extent practicable. Combustible materials, combustible waste and rubbish shall be
collected and removed from the Site at least once each day. Fuels, oils and volatile or inflammable
materials shall be stored away from the Transmission and equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for fire
fighting. Enough of such trained personnel must be available at the Site during the entire period of the
The Contractor shall have total responsibility for all equipment and materials in his custody/stores,
loose, semi-assembled and/or erected by him at Site. The Contractor shall make suitable security
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
arrangements ensure the protection of all materials, equipment and works from theft, fire, pilferage
and any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the Contractor shall
be carried out in presence of contractor and is deemed considered as part of the work completion. If it
is anticipated that the above test may prolong for a long time, the Contractor’s workmen required for
the above test shall always be present at Site during such tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received,
unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of
any damages, storage, discrepancy etc, for the purpose of Engineer’s information only. The Contractor
shall submit to the Engineer every week a report detailing all the receipts during the week. However,
the Contractor shall be solely responsible for any shortages or damages in transit, handling and / or in
storage and erection of the equipment at Site. Any demurrage, wharf age and other such charges
claimed by the transporters, railways etc, shall be to the account of the Contractor. For shortages of
any materials issued by the GETCO for the work, recovery shall be made from you, on the basis of
prices of the materials (prevailing on the date of settlement of materials account) plus 15% supervision
charges plus GST as applicable.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment
materials received by him for the purpose of erection and keep such record open for the inspection of
the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment stored
shall be properly protected to prevent damage either to the equipment or to the floor where they are
stored. The equipment from the store shall be moved to the actual location at the appropriate time so
as to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried by heating
before they are installed and energized. Motor bearings, slip ring, commutators and other exposed
parts shall be protected against moisture ingress and corrosion during storage and periodically
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation resistance
at least once in three months from the date of receipt till the date of commissioning and a record of
such measured insulation values maintained by the Contractor. Such records shall be opened for
inspection by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected
and stored in a suitable manner to prevent damage or deterioration in quality by storage.
19.8 All the materials stored in the open or dusty location must be covered with suitable weatherproof and
flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those earmarked for him,
the Engineer will have the right to get it moved to the area earmarked for the Contractor at the
Contractor’s cost.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment,
which require indoor storage. Normally, all the electrical equipment such as motors, control gears,
generators, exciters and consumables like electrodes, lubricants etc. shall be stored in the closed
storage space. The Engineer, in addition, may direct the Contractor to move certain other materials,
which in his opinion will require indoor storage, to indoor storage areas, which the Contractor shall
strictly comply with.
20.0 TRANSMISSION MANAGEMENT
20.1 The field activities of the Contractors working at Site, will be coordinated by the Engineer and the
Engineer’s decision shall be final in resolving any disputes or conflicts between the Contractor and
other Contractors and the tradesmen of the Owner regarding scheduling and coordination of work.
Such decision by the Engineer shall not be a cause for extra compensation or extension of time for the
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of discussions
during the meeting and the decision of the Engineer and shall strictly adhere to those decisions in
performing his works. In addition to the above weekly meeting, the Engineer may call for other
meetings either with individual Contractors or with selected number of Contractors and in such a case
the Contractors if called, will also attend such meetings.
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his
works in accordance with the specified Transmission schedule. If at any time, the Contractor is falling
behind the schedule, he shall take necessary action to make good for such delays by increasing his
work force or by working overtime or otherwise accelerate the progress of the work to comply with
the schedule and shall communicate such actions in writing to the Engineer, satisfying that his action
will compensate for the delay. The Contractor shall not be allowed any extra compensation for such
20.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or
supply or any other services to the Contractor except for the coordination work between various
Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above Contract
Documents, drawings, specifications, and supplementary data, etc. effected at the field and on
completion of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the equipment furnished and
erected under the Contract. Such drawings and Engineering data shall be submitted to the Engineer in
required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including Transmission
equipment, tools and tackles for the purpose of the works under intimation to the Engineer. All such
goods shall, from the time of their being brought vest in the Owner, but may be used for the purpose
of the works only and shall not on any account be removed or taken away by the Contractor without
the written permission of the Engineer. The Contractor shall nevertheless be solely liable and
responsible for any loss or destruction thereof and damage thereto.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or owing
to him by the Contractor, under, in respect of or by reasons of the Contract. After giving a fifteen
(15) days’ notice in writing of his intention to do so, the Owner shall be at liberty to sell and dispose
off any such goods, in such manner as he shall think fit and to apply the proceeds in or towards the
satisfaction of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of
the Engineer the materials such as Transmission equipment, erection tools and tackles, scaffolding
etc. with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner and
the employees of other Contractors and Sub-Contractors and all public and private property.
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and
Conditions of Contract of this Volume-I, the following provisions will also apply to the portion of works
to be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his Sub-Contractor’s employee, which for any
reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be less
Workmen’s Compensation : As per statutory Provisions
Employee’s Liability : As per statutory Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease
or death of members of public or damage to property of others, due to any act of omission on the part
of the Contractor, his agents, his employees, his representatives and Sub-Contractors or from riots,
strikes and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-
Contractors, his agents and his employees have to perform work pursuant to the Contract.
24.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent both in
time and amount to take care of all his liabilities either direct or indirect, in pursuance of the
25.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed without
subjecting the equipment and materials to adverse effects during inclement weather conditions, like
monsoon, storms etc. and during other unfavorable Transmission conditions. No field activities shall be
performed by the Contractor under conditions, which might adversely affect the quality and efficiency
thereof, unless special precautions or measures are taken by the Contractor in a proper and
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
satisfactory manner in the performance of such Works and with the concurrence of the Engineer. Such
unfavorable Transmission conditions will in no way relieve the Contractor of his responsibility to
perform the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may
come across during the course of performance of his Works either during excavation or elsewhere, are
properly protected and handed over to the Engineer. Similarly, the Contractor shall ensure that the
bench marks, reference points, etc which are marked either with the help of Engineer or by the
Engineer shall not be disturbed in any way during the performance of his Works. If any work is to be
performed which disturbs such reference the same shall be done only after these are transferred to
other suitable locations under the direction of the Engineer. The Contractor shall provide all
necessary materials and assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to GETCO or to others, working at the Site. The Contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the relevant
legislations and the Engineer, as he may deem necessary.
27.4 All equipment used in Transmission and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be absolutely
safe. All equipment shall be strictly operated and maintained by the Contractor in accordance with
manufacturer’s Operation Manual and safety instructions and as per Guidelines/rules of GETCO in this
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out in
accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall be
properly maintained by the Contractor and will be promptly produced as and when desired by the
Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the Site
including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be
erected under the control and supervision of an experienced and competent person. For erection,
good and standard quality of material only shall be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the Owner or other Contractors under any circumstances, whatsoever, unless expressly
permitted in writing by GETCO to handle such fuses, wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other
Contractor or Owner, he shall:
(a) Satisfy the Engineer that the appliance is in good working condition;
(b) Inform the Engineer of the maximum current rating, voltage and phases of the appliances:
(c) Obtain permission of the Engineer detailing the sockets to which the appliances may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall be an
earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No
weight of any description will be imposed on any cable and no ladder or similar equipment will rest
against or attached to it.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
27.13 No repair work shall be carried out on any live equipment. The equipment must be declared safe by
the Engineer and a permit to work shall be issued by the Engineer before any repair work is carried out
by the Contractor. While working on electric lines/equipment, whether live or dead, suitable type and
sufficient quantity of tools will have to he provided by the Contractor to
electricians/workmen/officers.
27.14 In case any accident occurs during the Transmission/ erection or other associated activities undertaken
by the Contractor thereby causing any minor or major or fatal injury to his employees due to any
reason, whatsoever, it shall be the responsibility of the Contractor to promptly inform the same to the
Engineer in prescribed form and also to all the authorities envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property, and/or equipment. In such cases, the Contractor shall be informed in writing about
the nature of hazards and possible injury/accident and he shall comply to remove shortcomings
promptly. The Contractor after stopping the specific work can, if felt necessary, appeal against the
order of stoppage of work to the Engineer within 3 days of such stoppage of work and decision of the
Engineer in this respect shall be conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to safety
reasons as provided in para 27.15 above and the period of such stoppage of work will not be taken as
an extension of time for completion of work and will not be the ground for waiver of levy of liquidated
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements of
Safety Rules which would generally include but not limited to following: -
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so as to
enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper introduction as to
the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire prone areas
and adequate firefighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient first aid to the
j) Requirements of ventilation in underwater working to licensed and experienced divers, use of gum boots for
working in slushy or in inundated conditions are essential requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable laws
pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from time to
time without any demur, protest or contest or reservations. In case of any discrepancy between statutory
requirement and GETCO Safety Rules referred above, the latter shall be binding on the Contractor unless the
statutory provisions are more stringent.
a. Fatal injury or accident: Rs 1, 00,000/-These are applicable Causing death per person plus
b. Major injuries or accident causing :Rs. 20,000/-Injury to any person.
25% or more permanent disablement per person plus GST, whosoever to Workmen
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the workmen/employees
under the relevant provisions of the Workmen’s Compensation Act and rules framed there under or any other
applicable laws as applicable from time to time. In case the Owner is made to pay such compensation then
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
the Contractor is liable to reimburse the Owner such amount in addition to the compensation indicated
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment
shall be in accordance with the relevant Codes and accepted good engineering practice, the Engineer’s
drawings and other applicable Indian recognized codes and laws and regulation of the Government of India.
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars:
This part of the Bid Document relates to certain specific/special terms and conditions particular to the
Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC) and
Erection Conditions of Contract (ECC). The intent of provisions herein are specific to this contract and
are, in general, supplementary to related provisions under ITB, GCC and ECC. However, in certain
provisions which are contrary to those in ITB, GCC and ECC, the provisions in these Special Conditions
of Contract will prevail.
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the
6.0 Additional Documents:
Apart from various documents to be furnished along with the Bid as required in the GCC and ECC, the following
documents/details are to be furnished by the Bidder:
1. GST Registration No. Date/ issuing authority.
2. Details of Partners/Directors of the Firm/Company.
3. Experience Record and details of orders pending / executed for various utilities
4. Last three years Audited Accounts/IT returns
5. Electrical contractor’s license with latest validation.
6. PF registration along with proof of challan etc.
7. Solvency certificate from Bank (up to 20 % of Bid value).
7.0 Price Inclusions (including Taxes & Duties):
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
7.1 The prices quoted shall be all inclusive of freight, octroi, transportation, loading, unloading & stacking
at site of equipment materials received from Transmission store GETCO Bharuch after observing all
store formalities of GETCO.
7.2 No extra payment toward any type of templates and erection tools /materials will be made.
7.3 GOOD & SERVICE TAX (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on a given
taxable goods and/or services within the original contractual delivery period. The amount and% of GST and
Cess as applicable should clearly be indicated separately. (GST/Cess means all applicable Tax/Cess under
GST Laws. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act, CGST Act,
UTGST Act and SGSCT Act, 2017and all related ancillary legislations).
You shall have to submit a C.A Certificate duly authorized Signatory of successful bidder, certifying that
you have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not claim any
such Refund, on a future date, from the concerned Authorities and if, any Refund, in respect of such GST
and Cess, is claimed by you, it will be immediately passed on to the COMPANY, without COMPANY making
any specific Claim, for the same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess is
not mentioned clearly unless the bidder has opted for Composition Scheme under GST Act, which should be
clearly indicated in the price bid. COMPANY may at its discretion consider such offer with presumption of
highest applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of
the Supplier from Composition scheme during the tenure of the contract, the rate mentioned in the price
bid shall be final and any additional GST will have to be borne by the tenderer. In no case additional
amount towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further Statutory
Variation clause will not be applicable in case of Supplier / Contractor has opted for Composition Scheme
i. Contractor has to submit the GST Registration certificate.
ii. Contractor has to submit invoice/Challan as documentary proof with each RA bill & Final Bill and in
which it shall be specifically mention the nature of service &code SAC code under which the amount
of service tax GST payable by contractor and payable by GETCO (if any) without fail.
iii. GETCO will withheld the GST amount of contractor and it shall be reimbursed on production of
documents evidences of payment made by contractor
iv. The Contractor has to submit invoice to GETCO indicating following.
Name, address and GST registration no. of the service provider
Name and address of person receiving the service i.e. GETCO
Description and value of taxable service provided
The total GST payable thereon with bifurcation of GST payable by service provider and service
Rate and amount of taxes i.e. CGST/ SGST/ IGST/UGST
Place of supply along with the name of State, in case of a supply in the course
of inter-State trade or commerce i.e. Out of Gujarat Supply
Applicable SAC Code
Contractor has to also supply tax invoice as described under GST rules and
Regulation indicating GSTIN
v. Contractor has to provide Tax invoice in a standard format as per CGST act, CGST rules 2017 and GST
invoicing rules containing all details as provided in Act and rules. Contractor / Supplier has to
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
mention GST no. of GETCO i.e. 24AABCG4029R2ZC in the invoice invariably & failure of which
payment will not be made.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of GST (later on
due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above as charged in
the invoice shall be borne by the Supplier/Contractor. However, any refund received by the supplier / contractor
on account of GST charged from the company; such refund shall have to be passed on to the company, along with
interest if any. Such refund along with interest needs to be passed on suo-moto by the supplier / contractor.
Further, the Company has a right to recover the amount of GST along with penal interest at the rate of 15% per
annum if GST charged is not paid / short paid to the government or fail to upload the details or uploads
inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of GUVNL’s
statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for each item of
Goods/Service. If not specifically mentioned, then COMPANY will have the option to take the prices as exclusive
of taxes and duties at maximum higher slab rates for the evaluation of the tenders.
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder intends to supply the
goods /services, meaning thereby the bidder has to supply the goods / services from the relevant declared /
registered place of supply only
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under the GST
Act, subsequent to the date of submission of the offer, the same should be passed on to COMPANY and you should
inform such changes to COMPANY from time to time.
Tax deduction at Source (TDS) under GST at the prevailing rate will be deducted from bills in accordance with
the provision of Section 51 of the CGST Act, 2017 and to that effect a certificate will be issued to the party.
Goods and Service Tax Compliances (GST):
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work executed will be
subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations and notifications, circulars issued and in
force time to time by Government and M/s. GETCO. Contractors are required to clarify the product and services
related HSN codes and SAC codes respectively.
GETCO reserve right of re-classify, in case of mis-classification of goods and/or service (HSN/SAC codes) Sec.
of CGST/SGST Act contains provisions related to anti-profiteering. On the basis of same on introduction of GST,
the Vendor should pass on the tax benefit/savings, if any, on account of tax credits or lowering of tax rates to us
by way of adjustment in the contractprice.Non-compliance of the same may lead to levy of penalty by
Contractor required to submit the invoice as per the standard formats/contents of GST laws including invoice
ruling. GST will be reimbursed subject to proper/ valid matching of transactions/invoices on GSTN (GST network).
The contractor is abiding by the all rules and regulations of corporation and amendments, which may publish
subsequently for compliance by field offices with respect to GST Laws.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
7.4 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or in the event of
introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers offer if it takes place
within the original contractual delivery date will be to COMPANY’s account subject to the claim being supported
by documentary evidence.
However, if any decrease takes place after the contractual delivery date, the advantage will have to be passed
on to COMPANY. Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision of
Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.6 Welfare Cess
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects and
Contractor shall get registered under Welfare Cess Act before commencement of work. Office of the
Factory Inspector is authorized at present as a registering authority.
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of documentary
evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO, then contractors
shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive basis of
utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to the
contractor on receipt of request letter along with documentary evidence of payment. For calculation of
welfare cess on supply part, valuation as per MR shall be taken and informed to the contractor for
payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit
the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of final bill, the contractor has to submit documentary evidence of
payment of welfare cess of previous R.A.Bill as well as of this final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has to
submit documentary evidence of registration under Welfare Cess Act and evidence of payment of
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary evidence
of payment by observing due formalities.
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in poor workmanship
etc. for a period of one year from the date of commissioning.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in supply and erection beyond Contractual cutoff date stated
as per stipulated delivery period shall be subject to the penalty at the rate of ½ % of the contract
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
value per week plus Applicable Taxes of delayed work or part thereof, with a ceiling of 10 % of the
total contract value plus Applicable Taxes.
10.2 The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
10.3 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete
work, GETCO will get the remaining work executed at the risk & cost of contractor.
11.0 COMPLETION PERIOD
11.1 Overall period for this Contract will be 180 Days from the date of commencement.
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
11.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the GETCO/Engineer and is complete in all
respects as per the terms and conditions of this Contract.
12.0 The validity of tender is 180 days from the date of opening of technical bid
13.0 Terms of Payment
All payments made during the Contract shall be on account payments only. The payment will be made
on fulfillment of all his liabilities under the Contract and production of work completion certificate of
the Sub-Station in-charge, after following the procedures of GETCO. Payment will be made by
concern Division offices under which subjected work executed.
The payment terms towards the supply, installation, commissioning and 5 year CMC shall be as follows:
80% of the order value upon certification of GEDA/third party approved by GEDA and commissioning
of the system upon installation of the Bi -directional & solar meter and complete the installation process with
uploading of all documents on GEDA online portal, or as may be specified.
Installation certificate duly signed by beneficiary/ GEDA official/ third party showing its
commissioning date (Dt. of installation of the Bi -directional meter installation)
Remaining 20% of the order value against the equivalent amount of performance guarantee valid for a
period of 5 years from the date of commissioning of the system (Date of meter installation). Security
deposit shall be released with this 80% payment against NOC from respective division.
Invoice with all statutory requirement as above will be submitted to respective S/s Incharge / Division
office for payment carried out by respective offices.
The payment to the Contractor for the performance of the works under the Contract will be made by
the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfillment by the Contractor of all his liabilities under the Contract.
Currency of Payment: All payments under the Contract shall be in Indian Rupees only.
Terms: Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
Mode of Payment: Payment made by respective division office through RTGS only directly to Owner’s
Bank or directly to the Contractor Bank account as per the payment schedule.
The payment of test charges, if any, payment, taxes and duties (whenever admissible) inland
transportation (including port handling), insurance and the erection portion of the Works shall be
made direct to the Contractor by the Owner.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
All payments under the Contract shall be made as stipulated in the Special Conditions of Contract
after signing the Contract Agreement. The payments linked with the dispatch of materials shall only be
made after production of all dispatch documents as specified in the relevant Contract conditions which
will interalia include the Material Inspection Clearance Certificate issued by the Owner.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all
perils detailed herein. The form and the limit of such insurance as defined herein together with the
under-writer in each case shall be acceptable to the Owner. However, irrespective of such
acceptance, the responsibility to maintain adequate insurance coverage at all time during the period
of Contract shall be of Contractor alone. The Contractor’s failure in this regard shall not relieve him of
any of his contractual responsibilities and obligations. The insurance covers to be taken by the
Contractor shall be in the joint name of the Owner and the Contractor. The Contractor shall, however,
be authorized to deal directly with Insurance Company or Companies and shall be responsible in regard
to maintenance of all insurance covers. Further the insurance should be in freely convertible currency.
14.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into
satisfactory operation and all activities to be performed till the successful completion of
commissioning of the equipment shall be to the account of the Contractor. The Contractor shall be
responsible for preference of all claims and make good the damages or loss by way of repairs and/or
replacement of the equipment, damaged or lost. The transfer of title shall not in any way relieve the
Contractor of the above responsibilities during the period of Contract. The Contractor shall provide
the Owner with copy of all insurance policies and documents taken out by him in pursuance of the
Contract. Such copies of documents shall be submitted to the Owner immediately after such insurance
coverage. The Contractor shall also inform the Owner in writing at least sixty (60) days in advance
regarding the expiry/cancellation and/or change in any of such documents and ensure revalidation,
renewal etc., as may be necessary well in time.
14.3 The perils required to be covered under the insurance shall include, but not be limited to fire and
allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in
transit, theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions,
accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods
and other costs till the equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be
liable to make good the full replacement/rectification value of all equipment/materials and to ensure
their availability as per project requirements.
14.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s
account and will be included in Contract Price, However, the Owner may from time to time, during
the pendency of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and
in such a case, the parties to the Contract will agree for a mutual settlement, for reduction in
Contract price to the extent of reduced premia amount. The Contractor, while arranging the insurance
shall ensure to obtain all discounts on premia, which may be available for higher volume or for reason
of financing arrangement of the project
The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site
Special Conditions of Contract details out the various insurance liabilities
LIABILITY FOR ACCIDENTS AND DAMAGES
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the successful
completion of commissioning as defined elsewhere in the Bid document.
DELAYS BY OWNER OR HIS AUTHORISED AGENTS
In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or his
authorized agents, then the Contractor shall be given due extension of time for the completion of the Works,
to the extent such omission on the part of the Owner has caused delay in the Contractor’s performance of the
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be final.
In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if such delays
have resulted in any increase in cost. The Owner shall examine the justification for such a request for claim
and if satisfied, the extent of compensation shall be mutually agreed depending upon the circumstances at the
time of such an occurrence.
15.0 LABOUR LAWS:
15.0.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be
employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid labour license under the contract Labour (Regulation and abolition)
Act for employing necessary manpower required by him. In the absence of such license, the contract
shall be liable to be terminated without assigning any reason thereof.
15.0.3 The Contractor shall at his own expenses comply with all labour laws and keep the GETCO indemnified
in respect thereof. Some of the major liabilities under various labour and industrial laws which the
Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or
other Statutory Authority.
ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/- or later
prevailing rate with the Office of Commissioner of Labour as per the Contract Labour
(Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labour (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day
for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial
Dispute Act. Any payment to the Contractor’s employee arising out of any claim of disputes
under the Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed
under the various labour laws, in force from time to time, from Statutory Authorities like State
Government/ Government o India, which the Contractor shall have to comply with.
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee.
Provident Fund and Family pension Scheme at the rate of 18% (or at the rate made applicable by the
Government from time to time of the wages. The Contractor’s contribution and his workers
contribution towards Provident Fund and Family Pension Scheme shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad.
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of the
Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional Provident
Fund Commissioner, Ahmedabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour, shall
be provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for
individual labourer, which shall be duly verified, approved and certified by the authorized Officer of
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the
liability insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pendency of the
15.6 The contractor shall employ adequate number of experienced skilled at site for daily supervision and
for maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
15.7 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO
also, Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and
expenses whatsoever, arising out of or in connection with the matters referred herein above elsewhere
and against all actions, proceedings, claims, demands, costs and expenses which may be made against
the GETCO or Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for intervention of authority Government for or in respect
of performance of his obligation under the contract documents. The GETCO shall not be liable for or in
respect of or in consequence of any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and keep
indemnified the GETCO against all claims, demands, proceedings, cost, charges and expenses
whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this
contract. If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide
workmen’s employer’s liability insurance for the latter’s employees, such employees shall be covered
under the Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
a) The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates fixed
under the minimum wages act. The wages of every Contract Labour employed by him under
this contract shall also be paid by him before the expiry of 7 th day of the last day of the month
in respect of the wages are payable (i.e. wages of a month have to be paid by him in the first
week of the next month). Any default will result in cancellation of contract forthwith or else
the contractor shall be punishable to the extent of Rs. 100/- per each day or as per the
prevailing rules of labour laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case of
labour trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his
office outside the factory work premises and the Contractor shall arrange to have his office
outside the factory work premises and the Contractor shall keep himself present throughout
the working hours.
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within contractual
period of delivery or in case the stores are found not in accordance with prescribed specification
and/or the approved sample, the GETCO shall exercise its discretionary power either:
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account and at the risk of
the contractor for such stores not so delivered or other similar description without canceling the
contract in respect of the consignment not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the GETCO shall be
final. In the event of action taken under clause (A) or (B) above, the contractor shall be liable to
pay for any loss which the GETCO may sustain on that account, but the contractor shall not be
entitled to have any saving on such purchases made against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any
time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder has to reduce
all the quoted rates proportionately. The reduction on overall basis will not be accepted (i.e. all
unit rates of erection schedule shall be reduced proportionately by difference in percentage). The
confirmation for matching end cost shall be given within 7 (seven) days from the letter from
16.0 VENDOR REGISTRATION:
REGISTRATION AS A CONTRACTOR:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Registration with GETCO is pre requisite for participating in tender. It is required to furnish
documents of registration along with offer in Technical bid and the details at appropriate place in
confirmation of details of bidder shall be given by the contractor
17.0 Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for business
dealing/blacklisting:
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties from participating in
the tendering process.
1.1.1. Firm will mean Bidder / Licensor / Tenderer / Consultant / Vendor / Contractor.
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /blacklisting, is to protect the
GUVNL and its subsidiary Companies from dealing with undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned for business dealing /
blacklist are as Under.
A Firm will be placed in a Stop deal / banned for business dealing / blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid, until and unless it is
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.4. Has refused to accept letter of Acceptance / purchase Order / Work Order after the same is issued by
the Company within the validity period and as per agreed terms and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has abandoned the contract,
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled program.
1.2.7. Has failed to submit all the necessary tests reports / documents within time schedule/ as per
company’s time limit, as mentioned in the LOI, if the letter of Acceptance (LOA) is placed subject to
submission of type reports / documents to the firm.
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace with stipulated time frame,
as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or has not returned or has
short returned or has unauthorisely disposed of materials / documents / drawings / tools or plants or
equipment supplied by the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
1.2.12. Has unauthorisely obtained official company information or copies of
documents, in relation the tender / Contract.
1.2.13. Has failed to follow the stipulated mode of communication, if specified by the tendering authority /
1.2.14. Has parted with, leaked or provided confidential / proprietary information of the Company given to
the firm only for its use (in discharge of its obligation against an order) to any third party without prior
consent of the Company,
1.2.15. Any other ground for which in opinion of the company makes it undesirable to Deal with the Firm, and
1.2.16. In case the State Government directs the Company to place a firm in stop
dealing / banned for business dealing / banned for business dealing /
1.3. Every bidder should at the time of submission of bid, give a declaration that bidder and / or
proprietor / partner / Director of the firm has not been placed on stop dealing / banned for business
dealing / blacklisting by GUVNL and It’s any subsidiary Companies as per Revised ANNEXURE-14
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information & should place on top of technical bid
specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD/Speed post. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by Yes / No
5) a) Whether the Bidder is registered with GETCO Yes / No
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. & date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( DD / BG ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No
8) GST [IN PERCENTAGE] Yes/ No
Please quote your GST Registration No. & Date.
9) PENALTY TERMS AGREE Yes/ No
10) SECURITY TERMS AGREE Yes/ No
11) PAYMENT TERMS AGREE Yes/ No
12) Completion Period Agreed Yes/ No
13) TELEPHONE NOS. & FAX NO. & e-mail ID
14) AUTHORISED PERSON OF THE FIRM:
15) NAME OF THE PROPRIETOR, PARTNERS, DIRECTORS
[AS THE CASE MAY BE], ALONG WITH ADDRESS, TELEPHONE, FAX NO. etc.
Signature of Authorized Representative of
Name of tendering company
Signature of Contractor Superintending Engineer
GETCO, CO, Bharuch
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed
from time to time without any demur, protest or contest or reservations. In case of any discrepancy
between statutory requirement and GETCO Safety Rules referred above, the latter shall be binding
on the Contractor unless the statutory provisions are more stringent.
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in
addition to the compensation and liability as per statutory requirement, contractor /
agency shall be penalized as under:
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs.5000/- plus GST as applicable
2 Above 1 Lac to 10 Lacs Rs.40000/- plus GST as applicable
3 10 to -- 100 Lacs Rs.100,000/- plus GST as applicable
4 > 100 Lacs 1.0 % plus GST as applicable
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of
fatal/Non-fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to the
contractor /Agency.
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s
site in charge and supervisor. Safety document shall be handed over and vital safety norms and
key points of safety related to project shall be explained and recorded for commitment by
erection contractor.
Such records are mandatory for clearing first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the following checks
during execution of work shall be covered.
3.21 Safety equipments available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
3.2 2 Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
(b) Wire rope and sling.
(c) Earthing rod
3.2 If above-mentioned safety requirements found violated in any of the above three
conditions shall attract penalty of Rs.1000/- plus GST per occasion. (Max.Rs.3000/--
for violation of three conditions) During subsequent visit, if violation is found, then
double penalty plus GST shall be deducted from the bill of the Contractor/Agency.
4. The contractor will have to give indemnity bond & safety cum indemnity on stamp paper of
Rs. 300/- to GETCO against any possible claim of compensation for damage to contractor’s
equipment or staff or any of third parties during the execution of work.
Work & Safety Instruction for Contractors:
Following safety guidelines are mandatory for all contractors operating in GETCO premises
/on transmission lines for Electrical, non-electrical & civil works.
1.The contractors must provide advance planning of work to concerned in-charge of substation
2.The list of workers/ lab ours with name and address must be given to S/s in charge prior to
commencement of work by the contractor.
3.The copy of group insurance policy with list of name of workers covered.
4.The list of T&P and safety equipment (PPE) having tested and checked by GETCO officials at
5.The working procedure must be specified with timings of working hours indicating tea break
& lunch break period.
6.Before starting any work whether switch yard, on line or in colony “permit to allow to work”
must be taken from control room in-charge.
7.Utilizing Electrical/non- electrical equipments, safety rules must be implemented.
8.All workers /labour & supervisors must use safety equipments (PPE) during the work.
9.If the work is to be carried out on Sunday or public holiday the necessary permission must be
taken in advance, requesting in writing.
10 Unwanted person including children of labours will not be allowed at working site/ in the
switchyard and in the prohibited area.
11 Any electrical work or electrical connections to equipment for any other work must be
carried out by certified electrician/wiremen with adequate size of wire through MCB per I.E.
Rule. Ensure that all precautions are taken to prevent electrical accident, & the installation
/connection is certified by Engineer in-charge.
12 No work should be done during night hours unless & until it is required under certain
circumstances with the approval next higher authority and all necessary arrangement of
adequate lighting with safety precautions is made.
13 Joint checking of line by In-charge, contractor & supervisor prior to commencement of work
of any electrical/non-electrical work.
14 Any power line crossing, river crossing & railway crossing or any other hazards must be
discussed with workers by contractor in presence of Engineer in-charge.
15 Contractors must submit list of workers with name, qualification and experience who are
engaged for line maintenance/rectification job.
16 Line clear permit must be taken on power line crossing or passing nearby for safety of
workers. This must be ensured by GETCO supervisor/in-charge of substation before starting
17 Contractors must arrange for Shelter and drinking water facility for the labours /workers
engaged with the permission of S/s in charge.
18 The method of work, required T&P and manpower should be discussed between GETCO
supervisor, contractor’s supervisor and gang leaders.
19 Prior to execution of work a joint survey must be conducted by GETCO supervisor,
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
contractor’s supervisor and DISCOM line man in order to identity the following.
20 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as may
be prescribed from time to time without any demur, protest or contest or reservations. In
case of any discrepancy between statutory requirement and GETCO Safety Rules referred
above, the latter shall be binding on the Contractor unless the statutory provisions are more
a. Fatal injury or accident :Rs 1, 00,000/- These are applicable
Causing death per person plus GST for death
b. Major injuries or accident causing :Rs. 20,000/- Injury to any person.
25% or more permanent disablement per person plus GST
whosoever to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation
Act. The compensation mentioned above shall be in addition to the compensation payable to
the workmen/employees under the relevant provisions of the Workmen’s Compensation Act
and rules framed there under or any other applicable laws as applicable from time to time. In
case the Owner is made to pay such compensation then the Contractor is liable to reimburse
the Owner such amount in addition to the compensation indicated above.
21 If the work is required to be carried out during fix outage then the contractor has to deploy
adequate man power, material, tools etc. well in advance and has to complete the entire
work during this specific outage period only, failing to which GETCO shall be at liberally to
deduct the amount of revenue loss due to prolong outage.
22 If required by GETCO you shall have to provide free to and fro traveling facility to our Junior
Engineer or Technical staff for the work.
23 10% amount of bill will be retained from each RA bill for the work executed after the
scheduled date of completion and on finalization of time limit extension by competent
authority, this amount will be released after deducting amount towards the time limit
penalty plus GST as applicable if any.
24 For shortages of any materials issued by the GETCO for the work, recovery shall be made
from you, on the basis of prices of the materials (prevailing on the date of settlement of
materials account) plus 15% supervision charges plus GST as applicable.
25 The GETCO reserves the rights of interchanging and dismissing any person employed for the
work if there is complaint against his misbehavior, misconduct or disloyalty towards job.
26 Terms and conditions regarding industrial laws and other related matters shall be complied
by the contractor in all respect.
The contractor shall ensure that all persons have provided safety tools, shoes, halmets etc. as may
be required for safety point of view and all his persons shall follow the instructions issued by the
GETCO from time to time in concern with EIC.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Sub.: Survey, Design, Supply, Installation, Commission and maintenance of Solar PV System for 5 years as
a rooftop at Control Room terrace of 66kV Pipodara-2, 66kV Kasal S/s and 66kV Velachha S/s under
KIM AM Division under Bharuch TR Circle.
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender No. TCBRH/26-27/E-122
For Work of Survey, Design, Supply, Installation, Testing, commissioning with Comprehensive
Maintenance contract of 5 years for Solar Rooftop Projects on Control Room building at 66kV
Haldarwa S/s, 66kV Zanor S/s, 66kV Saring S/s, 66kV Sarbhan S/s, 66kV Vilayat S/s under Bharuch
AM Division under Bharuch TR Circle complete with all the tender Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till completion
of the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation. Further,
I / we also agree that additional conditions / deviations, if any found in bid, the offer shall be out
rightly rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
19. The GETCO reserves the rights of interchanging and dismissing any person employed for the work if there is
complaint against his misbehavior, misconduct or disloyalty towards job.
20. Terms and conditions regarding industrial laws and other related matters shall be complied by the
contractor in all respect.
21. The contractor shall ensure that all persons have provided safety tools, shoes, hamlets etc. as may be
required for safety point of view and all his persons shall follow the instructions issued by the GETCO from
time to time in concern with the safety and security as the work to be carried out.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
(UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING/BLACK LIST THEREOF)
Sub: Undertaking in regard to stop Deal/Banned for Business dealing/Black list thereof.
Ref: Tender No.: TCBRH/26-27/E-122
All Bidders will have to furnish the following undertaking duly filled in, signed and stamped for each quoted
item of the Tender along with the Technical Bid.
I/We authorized signatory of M/s
hereby certify that M/s
and their proprietor/any partner/and directors of
the firm is not stop deal and/or banned for Business dealing and/or black listed by GUVNL and/or their any
subsidiary company viz. GSECL/ GETCO / DGVCL / MGVCL / UGVCL / PGVCL.
Seal of the firm Signature of the Tenderer
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
(Format for Guarantee Card)
FORMAT FOR GUARANTEE CARD TO BE SUPPLIED WITH EACH GRID CONNECTED SOLAR PV
1 Name & Address of the Empanelled Agency
2 Name & Address of DISCOM
3 Name & Address of BENEFICIARY
Date of Commissioning of the system
Details of PV Module (s) supplied in the System
Make (Name of the EOI applicant):
Model Serial No(s)
Wattage of the PV Module (s) under STC
Guarantee valid up to
Details of PCU/Electronics & other BOS items:
System Make (Name of the EOI applicant)
Serial No(s) Guarantee valid up to
Designation & Address of the person to be
Contacted for claiming Guarantee obligations
Local Service Centre Address:
The grid tied solar system is warranted for its performance for a period of five years and the
Empanelled Agency/Supplier (undersigned) undertakes to replace the components which do
not perform as per specifications, due to manufacturing defect, at no cost to the
beneficiary as per EOI Conditions.
(Signature) (SEAL)
Name & Designation, Name & Address of the Agency
(During the guarantee period GETCO reserves the right to cross check the performance of
the systems with the minimum performance levels specified in the EOI Document
specifications).
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
QUARTERLY MAINTENANCE & SERVICING REPORT
1. DETAILS OF SOLAR PHOTOVOLTAIC SYSTEM INSTALLED
1. Supplied by:
2. Date of installation:
3. Servicing period: From to
2. USER PROFILE
1. Name and address of User:
3. TECHNICAL DETAILS
1. Module Capacity, make and serial numbers:
2. Inverter Capacity, make and serial no.
4. CHECK OF THE PRODUCT
1. Correct inclination and orientation of SPV panel:
2. Cleaning of dust from SPV panel:
3. Interconnection of modules, charge controller etc.:
4. Fuse of charge controller:
5. Working of inverter
5. DIFFICULTIES IN OPERATION/ PROBLEM FACED BY USER:
6. DIAGNOSIS DETAILS/ REPAIR ACTION:
7. DATE ON WHICH SYSTEM WAS LAST ATTENDED:
8. IT IS MANDATORY TO SUBMIT INSTALLATION WISE QUARTERLY ENERGY GENERATION DATA TO
RESPECTIVE GETCO OFFICE.
9. AS PER SCOPE OF WORK PANEL CLEANING WORK DONE 02 TIMES IN THE MONTHS CARRIED OUT
User Name & Signature Technician’s Name & Signature
Date: (with rubber stamp)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Project completion Report for individual Grid connected Solar PV plant
Preform-A (by the installer)
Sr no Component Observation
1 Sanction No & Date
Nodal Agency / Channel partner
Name and Complete Address:
2.1 In case of Nodal Agency,
Name and Complete Address of installer:
3 Site / Location
Longitude/ Latitude Type
(Bore well / open well etc.)
4 Solar PV Array Capacity:
4.1 Make of Modules
Whether imported or indigenous?
4.2 IEC certificate :
(Enclose a copy of IEC certificate)
4.3 Whether RFID tag is pasted or not?
If so, tag is inside or outside. If not, the reason?
5 Support Structures/
5.1 Indigenous or imported
5.2 Tracking System/ Fix (No tracking)
5.3 Seasonal Tilt Angle adjustment
provided or not?
6 Grid-Tie inverter details
6.1 Motor Pump set Capacity (h. p.)
(Beneficiary’s)
7 Electronics / controls
7.1 MPPT provided or not?
If yes, provide details
7.2 Details of Inverter
8 Monitoring Mechanism for the installed
8.1 Technical Person Trained to maintain the system Name of the
person with Mobile no.
9 Date of Commissioning
(Enclose test certificate of System as per MNRE requirement)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
It is to certify that all the components / sub systems and materials including junction boxes, cables,
distribution boards, switches, circuit breakers used in the system are as per GETCO requirement.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Preform -B (By the customer i.e. GETCO)
Sr no Component Observation
1 Name of Office With consumer Name, Consumer
No, Contracted Load
2 Location with GPS Lat &Long
3 Whether training was provided by installer for
operation and maintenance
4 Whether the following documents were provided or
I-V curves of all modules
Inverter manual
Guarantee card for system
5 Date of handing over of the system
5 Cost breakup Total Project Cost:
It is to certify that all information given above is true and correct to best of my knowledge
(User signature and stamp)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Preform -C (Inspection report (by The Engineer In Charge))
Sr no Component Observation
1 Site / Location with Complete
2 Capacity of system
Installed (kWp)
3 Whether the system was installed in shadow free area or
not? If not mention the details
Any inter module shading exists or not
Whether the modules contains information about
company name, serial no and year manufacturing inside
RIFD pasted inside or outside
4 Electronics / controls
5 Structures:- tracking / fix
6 Cables Make and size Total Project Cost:
7 User Feed Back
8 Any Specific problem
1. Signature of inspecting Officer and date
List of enclosures:
1. Copy of invoice billed to user
2. List of serial no. of modules installed in the system
3. Test certificates of the components
4. Statement of expenditure
5. Original Color photographs
Signature of the EOI applicant
Seal of the Firm
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE TENDER.
[Tenderers shall submit in the Format detailed here under]
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding in
representative of firm company.
who has visited the site.
Contractor’s Representative legible signature: ______________________
Seal of the company
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
Class – with valid up to
1 GEDA Registration
Partnership deed/Proprietor (Notarized
4 Power of Attorney (Notarized copy)
Bl. Sheet / P&L A/C, Statement of last
Rs. Lacs issued by Bank,
6 Latest Solvency certificate.
7 GST Registration No.
9 Valid Electrical Contractor License
10 Experience certificate – form 3A of last
years (minimum value of similar work done
Signature of Tenderer Company’s Round Seal
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
APPENDIX – VIII
Qualification Requirement.
Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of opening of
the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case may
be], along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs.300.00)
KNOW ALL MEN BY THESE PRESENTS that we, ____________________ by this SAFETY
CUM INDEMNITY BOND Executed on this _______________. I/We Having Registered
Office _____________ (here in after called “THE CONTRACTOR” which expression shall
mean and includes my/our heirs, executors, administrators and legal representatives,
successors and permitted assigns) do here by binds myself/ourselves and also our
company / firms after having the power to bind by this promise and undertaking in
favor of the Gujarat Energy Transmission Corporation Limited (GETCO), Vadodara State
Transmission Utility under The Electricity Act,2003 having its registered office at Sardar
Patel Vidyut Bhavan, Racecourse, Vadodara. (Here in after called as GETCO, which
expression shall mean and include its legal representative, administrators’ assigns) has
agreed under the terms and conditions of the contract no.
______________________________ made between GETCO and
___________________________ for the contract of the “
_______________ interalia on Production of Safety cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from
time to time to the extent of ₹_____________ Rupees only against any losses or
damages, costs, charges and expenses caused to or suffered by reason of the
CONTRACTOR while Project, R&M, O&M work including work carried out by outsourcing
agency, failing to take proper care or not complying the guidelines given hereunder as
per Annexure-A and instructions which may be given from time to time during the
Continuance of the contract and we further undertake to unconditionally pay the
amount claimed by the GETCO on demand and without demur to the extent aforesaid.
Whereas the CONTRACTOR has / have been awarded to execute the job / works under
order no. ________________________ Date: ____________made between GETCO
and _____________________________________ issued by the GETCO after having
observing necessary formalities, the details of which is described in the order no
__________________________ Date: _______________ and whereas the said
job/works will be /likely to be done in places covered under Employees’ State
Insurance Act, 1948 (ESI) and /or the Workmen Compensation Act, 1923 and /or other
laws relating to the Labour Management and Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under
obligation to execute this Safety cum Indemnity Bond before the commencement of
actual execution of work.
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to
follow the guide lines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to
whether there has been any breach of the guidelines as per Annexure-A of this bond
and as to the extent of the loss, damages, costs, charges and expenses caused to or
suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be
discharged because of the change in the constitution of the GETCO or for the extension
of the time limit or for any other reason.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
We the CONTRACTOR further agrees to the given terms and conditions:
A. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the
GETCO from all claims, actions, proceedings and risk, damage danger to any
person whether belonging or not belonging to the. CONTRACTOR.
B. That the CONTRACTOR shall keep harmless the GETCO from all claims,
compensation, damages any proceedings in respect of any of its employee /
workmen under the Workmen Compensation Act or any other laws for the time
being in force.
C. That, if during the course of execution of work as stated in the contract order
mentioned hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR
has not complied with guidelines as per Annexure-A or terms and conditions /
formalities within the meaning of Employees’ State Insurance Act,1948 (ESI) or
Workmen Compensation Act 1923 or any other laws relating to the Labour Welfare
for the time being in force, and also has not observed the safety norms in
accordance with the law prevailing at the place of work/job to the satisfaction of
the GETCO, the GETCO shall have the right to stop the execution of work/job and
the period of such stoppage shall not be taken into account for the calculation of
the total period of completion of work for which the CONTRACTOR is responsible
to complete the work/job and it will be deemed that discontinuance was due to
default of the CONTRACTOR .
D. That, if any time, due to exigency, GETCO as the Principle Employer, becomes
liable to pay any such compensation mentioned hereinabove, whether on failure of
the CONTRACTOR or for any other reason, the GETCO shall have the right to
recover the said amount from any amount receivable by GETCO or any bank
guarantee deposited or anything payable whether in connection with this contract
or other contract by the CONTRACTOR to the OBLIGEE.
E. That the CONTRACTOR is/are aware and accept that for the persistent or repeated
violation of any guidelines as per Annexure - A and terms and conditions
mentioned in this Safety cum Indemnity Bond, GETCO shall have right to terminate
the contract of work issued to the CONTRACTOR.
F. In case if any safety related fatal Electrical / Mechanical accident occurred to any
employee of agency or outsider due to negligence or non-compliance of GETCO
safety norms then in addition to the compensation and liability as per statutory
requirement, contractor / agency is hereby agreed to pay the penalty amount as
Sr.No Amount of Contract in Rs. Penalty amount
1 Up to 1Lac Rs.5000/- + GST Extra
2 Above 1Lac to 10Lacs Rs.40000/- + GST Extra
3 10 to 100 Lacs Rs.100,000/- + GST Extra
4 >100 Lacs 1.0 % of contract value
G. I / We the CONTRACTOR hereby confirm that incase of any dispute/difference for
settlement of claims under this Safety Cum Indemnity bond the courts in Gujarat
State wherever job/work is performed or as per GETCO norms shall have the
jurisdiction to decide the rights &liabilities of the parties while adjudicating the
matter of claims under this Safety Cum Indemnity Bond.
H. This Safety cum Indemnity Bond shall continue and hold good until it is released by
the GETCO in Writing on the CONTRACTOR’s application after the Contractor has
discharged all his obligations under the order mentioned hereinabove and
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
submitted a “NO DEMAND CERTIFICATE” from the GETCO under the said order. The
Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and renewable
thereof (Claim Period).
I. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein
contained are in addition to and not by way of limitation or substitution for any
other guarantee, indemnities here to before given to the GETCO by the
CONTRACTOR and this indemnity does not revoke or limit such indemnities or
guarantees. IN WITNESS WHEREOF the Parties hereto have executed this indenture
the day the year First hereinabove written.
J. GST as applicable on Penalty amount shall be borne by the contractor and the
contractor agrees to pay/ reimburse the same. (TO BE INCORPORATEDIN SAFETY
CUMINDEMNITY BOND)
Signed, sealed and delivered by:
Witnessed by:
For and on behalf of GETCO Ltd.:
Deputy Engineer (CMG) Superintending Engineer
G.E.T.C.O., C.O., Bharuch G.E.T.C.O., C.O., Bharuch
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
PROFORMA FOR CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
CONTRACT AGREEMENT
THIS AGREEMENT is made at BHARUCH the_____________ day of ___________ in the Christian Year
two thousand ___________ between M/s. _____________________________________ (address
of office) ________________ (hereinafter referred to as “THECONTRACTOR” which expression shall
unless excluded by or repugnant to the context include its successors or permitted assigns) of the
ONE PART and the Gujarat Energy Transmission Corporation Ltd, having their Head office at Race
Course, Baroda 390 007 (hereinafter called “The GETCO” which expression shall unless excluded by
or repugnant to the context include its successors or assigns) of the SECOND PART.
WHEREAS the aforesaid The GETCO has accepted the tender of the aforesaid contractor for work of
The GETCO’s Order No. ______________________________________ _______________ hereinafter
called “the works” and more particularly described and enumerated or referred to in the
specification, terms and conditions prescribed in the order letter, covering letter and other letters
and schedule of price which for the purpose of identification have been signed by Shri
____________________________________ (authorized signatory) on behalf of the contractors and
by the Supt. Engineer (Trans), Gujarat Energy Transmission Corporation Ltd, Vidyut Bhavan, Race
Course, Baroda on behalf of the GETCO, a list whereof is made out in the Schedule hereunder
written and all of which said documents are deemed to form part of this contract and included in
the expression “The works” wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned.
AND WHEREAS the GETCO has accepted the tender of contractors for the work of
____________________________________________) upon the terms and subject to the conditions
herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
1. The contractors shall do and perform all works and things in this contract mentioned and described
or which are implied therein or therefrom respectively or are reasonably necessary for the
completion of the works as mentioned and at the times, in the manner and subject to the terms
and conditions and stipulations contained in this contract, and in consideration of the due
provision, executions, erection and completion of the works agreed to by the contractor as
aforesaid the GETCO doth hereby covenant with the contractor to pay all the sums of moneys as
and when they become due and payable to the contractors under the provisions of the contract.
Such payment to be made at such times and in such manner as is provided by the contract.
2. The conditions and covenants stipulated here-in-before in this contract are subject to and
without prejudice to the rights of the GETCO to enforce penalty for delays and / or any other
rights whatsoever including the right to reject and cancel on default or breach by the contractor
of the conditions and the covenants as stipulated in the general conditions, specifications, forms
or tender schedule etc. attached with The GETCO’s Order No.
3. The contract value, extent of works, completion dates, specifications and other relevant matters
may be altered by mutual agreement and if so altered shall not be deemed or construed to mean
or apply to affect or alter other terms and conditions of the contract and the general conditions
and the contract so altered or revised shall be and shall always be deemed to have been subject
to and without prejudice to said stipulation.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
List of documents forming part of the contract:
The GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated
The GETCO’s contract booklet – “Tender & Contract of Works”.
The GETCO’s order No. Dtd. _____ / ______/
Contractor’s acceptance of order vide letter No. _______________.
Contractor’s Partnership Deed dtd. ________________.
Contractor’s Power of Attorney / The GETCO Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties hereto have set their hands and seals this day and month, year first
Signed, sealed and delivered by
For and behalf of M/s. __________________ (Signature)
In the presence of (Name and Address)
Signed, sealed and delivered by for and on
behalf of Gujarat Energy Transmission Corporation Ltd
Sardar Patel Vidyut Bhavan, Race Course,
In the presence of name and address:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Format for LOI Letter of Acceptance
(To be submitted on firms letter-head. Duly stamped & signed)
Ref. No. Date :
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Bharuch
Bharuch –392012
Sub: Latter of acceptance of LOI
We hereby agree, admit and acknowledge the receipt of your above referred Acceptance of Tender
for the “Work of Work of Survey, Design, Supply, Installation, Testing, commissioning with
Comprehensive Maintenance contract of 5 years for Solar Rooftop Projects on Control Room
building at 66kV Haldarwa S/s, 66kV Zanor S/s, 66kV Saring S/s, 66kV Sarbhan S/s, 66kV Vilayat
S/s under Bharuch AM Division under Bharuch TR Circle” We hereby further agree to all the terms
and conditions mentioned in the tender, LOI and A/T unconditionally.
Yours faithfully,
(Authorized Signature)
Designation _________________
(Official Stamp)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
A/T ACCEPTANCE LETTER:-
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Bharuch
Sub: A/T acceptance letter
We hereby acknowledge, agree and accept your Tender No.____________________ and letter of
No._________________________ and Work order no. under reference above with terms and
mentioned therein for the “Work of Survey, Design, Supply, Installation, Testing, commissioning
with Comprehensive Maintenance contract of 5 years for Solar Rooftop Projects on Control Room
building at 66kV Haldarwa S/s, 66kV Zanor S/s, 66kV Saring S/s, 66kV Sarbhan S/s, 66kV Vilayat
S/s under Bharuch AM Division under Bharuch TR Circle.”
Designation _________________
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
ON RECENT STAMP PAPER OF RS. 300/-
The Superintending Engineer BG. No. :
Gujarat Energy Transmission Corporation Ltd Issue Date:
Transmission Circle Office, Expiry Date :
Maktampur, Amount :
FORM OF BANKER’S UNDERTAKING
[Combined Performance Guarantee (PBG) towards Execution Period and Guarantee /
Warranty Period as per Commercial Terms and Condition of Tender]
We, _______________________________________ (Name of the Bank and Address of the Branch
giving the Bank Guarantee) having our registered office at _________ (Address of Bank’s
Registered office) hereby give this Bank Guarantee Number __________ dated ________ and
hereby agree unequivocally and unconditionally to pay immediately on demand in writing from
the Gujarat Energy Transmission Corporation Limited, or any Officer authorized by it in this
behalf any amount up to and not exceeding Rs._____________ (Amount of combined Performance
Guarantees towards Execution / Supply Period and Guarantee / Warranty Period) (Rupees
_______ (in words) to the said Gujarat Energy Transmission Corporation Limited, on behalf of
M/s________________________________ who have entered into a contract for the supply/works
specified below :
This agreement shall be valid and binding on this Bank upto and inclusive of ____________ (Date
of validity of the Bank Guarantee) and shall not be terminable by notice or by change in the
constitution of the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or
variation or alteration made, given conceded or agreed, with or without our knowledge or
consent, by or between parties to the said within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the Gujarat Energy Transmission
Corporation Limited. Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be made
only by the beneficiary directly
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is
restricted to Rs._____________. (Rupees _________________________________ only). Our
guarantee shall remain in force until ___________ (Date of validity of the Guarantee). Unless
demands or claims under this Bank Guarantee are made to us in writing on or before ___________
(Date of validity of the Bank Guarantee), all rights of Beneficiary under this Bank Guarantee shall
be forfeited and we shall be released and discharged from all liabilities there under:
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Please Mention here Complete Postal Address of the Signature of the Bank’s Authorized
Bank with Branch Code, Telephone and Fax Nos. Signatory with Official Round Seal
NAME OF DESIGNATED BANKS:
Note: The banks shall be the Banks recognized / notified by the Finance
Department, Government of Gujarat (GoG) from time to time
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. Bank Guarantee number and date to be written on every page of Bank Guarantee & its
2. If B/G amount is more than Rs. 50,000/-, kindly take sign of Two Bank Officer with their
respective Employee Code No.
3. Valid confirmation letter of the concerned Bank in an approved format should be attached with
every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be
beyond six months, in any case.
5. Round seal and signature of two Bank Officers with name & sign code should be affixed on
every B/G paper.
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
Application for refund of EMD
(To be submitted on firms letter-head. Duly stamped & signed)
Ref. No. Date :
The Superintending Engineer
Transmission Circle
GETCO__________
Sub: - Application for refund of EMD
I request your good self to refund my EMD for the tender mentioned below as soon as the
price bids are opened and if I/We am/are not the L1 for the same. The details are as under.
Name of Work Sub-etc.
EMD) RTGS/NEFT No., Date & Name of
Bank detail for RTGS into
which EMD is required to be
Faithfully yours,
(Name & Seal of Bidder)
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered in an
atmosphere of trust and respect between providers of goods and services and their users for the ultimate
benefit of society as the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution of
works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are
Indoor safety precaution Outdoor safety Indoor safety precaution Outdoor safety
precaution precaution
The method of work required T&P and manpower The method of work required T&P and manpower
should be discussed between GETCO supervisor, should be discussed between GETCO supervisor,
contractor’s supervisor and gang leaders. contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey must be Prior to execution of work a joint survey must be
conducted by GETCO supervisor and contractor’s conducted by GETCO supervisor, contractor’s
supervisor for risk assessment. supervisor and DISCOM line man in order to identify
Clearly identify the work location, to distinguish
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
equipment / part that may be live. line of the work.
Disconnect equipment from supply. b. Isolation point of each line crossing.
Protect against other live parts. c. Each line crossing & isolation point under each
span must be discussed and noted in
Take special precautions when close to bare
conductors / Bus bar. maintenance register with sketch.
Following safety guidelines are mandatory for all Contractor’s supervisor and GETCO Supervisor must
contractors operating in GETCO premises for ensure all isolations physically with adequate earthing
Electrical, non-electrical & civil works. technically prior to give clearance to gang leader for
1. The contractors must provide advance planning of
work to concerned in-charge of substation in writing. While execution of stringing work, the identified line
crossing must be isolated / de-energized and written
2. Before starting any work whether switch yard, clearance should be obtained from concerned DISCOM
“permit to allow to work” must be taken from control supervisor.
room in-charge.
The isolation of Tap line must be physically seen and
3. Utilizing Electrical / non-electrical equipments, verified by Contractor and GETCO supervisor.
safety rules must be implemented.
At D.O. fuse junction contractor’s person should be
4. If the work is to be carried out on Sunday or public posted to ensure that no person restore D.O. supply
holiday, the necessary permission must be taken in while work is under execution Contractor’s supervisor
advance, requesting in writing. must ensure that concern officer take LCP for EHV
line and power line crossing.
5. Unwanted person including children of labors will
not be allowed at working site/ in the switchyard and
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
Reg. office:- Corporate Office, GETCO, Race course, Vadodara
in the prohibited area.
6. Any electrical work or electrical connections to
equipment for any other work must be carried out by
certified electrician/wiremen with adequate size of
wire through MCB as per I.E. Rule.
o Live penal area / bus bar must be isolated and
sealed / bifurcated with red color tape for visible
O Display Board must hang on LCP panel.
o Transformer must be switched off whenever and
wherever contractor and line workers are not satisfied
with isolation, earthing or any equipment
performance of GETCO, it will be pointed out and
work shall begin only after resolution. Contractor shall
not take up job in absence of GETCO authorized
All wire temporary connection & material never
erection activity has any connection and
disconnection work of busbar, string bus.
All workers / labor of contractor & supervisors must All workers/labour of contractor & supervisors must
use personal protective equipment (PPE) during the use personal protective equipment (PPE) during the
work like gloves, safety belt, Safety shoes, Helmet, work like gloves, safety belt, Safety shoes, Helmet,
earthing rods, etc, duly approved by GETCO. earthing rods, Live line detector etc, duly approved
The local earthing must be done at the place of work The local earthing must be done at the place of work
before execution of any work. before execution of any work.
11 kV breakers in panel must be switched off and Circuit breaker opening is not isolation and isolator
racked out only after ensuring no voltage in breaker on either side must be opened. No work during rains
and without door opening. and cloudy weather condition.
Transmission line activities.
1) Used of Voltage detector to ensure outage.
2) Earthing at three points, local, left & right side of
bus bar / string bus.
3) Match line color code with color of wrist band.
Local earthing of electrical equipments like filter
M/c, welding machine, testing kits etc. is must.
Crane shall only be used for material handling and
erection. Working platform shall only be used for
work in switchyard.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.