| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.7 CrAdmitted-Finance | ₹44.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Doppelmayr India Private Limited L1 |
|---|---|---|---|---|
| 1.00 | SCHEDULE A - DESIGN AND CONSTRUCTION WORK : Complete Engineering, design, manufacturing, fabrication, transportation including loading, unloading and handling at site, erection/installation, testing and commissioning of a Bi-Cable Jig Back Aerial tramway Ropeway system of length 700 m* for carrying 300 PPHPD on EPC mode with allide infrastructure necessary (based on the EPC design) for its smooth operations and maintenance as per the best Industry practice and various governing laws of states. All the design, execution, testing and commissioning at all levels including but not limited to following:
(a) Civil and strucural work as per the latest CEN/ Bureau of Indian Standards (BIS)
(b) Ropeway system and towers as per the latest European Committee for Standardization (CEN)
(c) Other infrastructure like Generator set, LT Pannel and all others associated E & I works as per the latest Bureau of Indian Standards (BIS)
Also Adhering to the General Conditions of Contract, Special condition of Contract and Scope of Work as given in Technical specifications/ tender drawings, employers requirements mentioned in Tender document
Scope includes collection of all the site specific data required for design, erection, commissioning and operations of the system and getting all the design approved from appointed IIT/ consultant having tie up with CEN certified engineers as approved by authority.. | 1 | lumpsum | 38,89,83,150 ₹38.9 Cr |
| 2.00OPERATION AND MAINTENANCE of ropeway system and allied infrastructure for the period of 5 years with overall Equipment Efficiency (OEE) of more than 90%. | ||||
| 2.01 | Operation and maintenance cost for 1st Year | 1 | lumpsum | 1,00,00,000 ₹1 Cr |
| 2.02 | Operation and maintenance cost for 2nd Year | 1 | lumpsum | 1,08,00,000 ₹1.1 Cr |
| 2.03 | Operation and maintenance cost for 3rd Year | 1 | lumpsum | 1,15,00,000 ₹1.1 Cr |
| 2.04 | Operation and maintenance cost for 4th Year | 1 | lumpsum | 1,24,00,000 ₹1.2 Cr |
| 2.05 | Operation and maintenance cost for 5th Year | 1 | lumpsum | 1,35,00,000 ₹1.4 Cr |
Tender Value
₹42.0 Cr
EMD Value
₹83.9 L
Closing Date
25 May 2021, 3:00 pmClosed
Chief General Manager
Ropeways and Rapid Transport System Development Corporation HP Ltd US Club Shimla
Development of Ropeway between Chandigarh Manali National Highway near Pandoh Dam Reservoir and Mata Baglamukhi Temple (Bakhli) District Mandi in Himachal Pradesh on EPC mode CEN Standard
2021_RTDCH_47109_1
RTDC/Baglamukhi/2021/2634-38
Open Tender
Construction Works
390 days
District Mandi Pandoh
Experience of the Firm Financial Creditability Staffing for the Contract Quality Certificationbs LI will be find out on the basis of combined score of Financial quote and Guaranteed Power Consumption
7 documents required · 7 mandatory
₹11,800
GENERAL MANAGER RTDC HP
₹83.9 L
Virtual mode (online)
6 Jul 2021
4 May 2021
25 May 2021
4 May 2021
25 May 2021
4 May 2021
17 May 2021
Amount
SCHEDULE A - DESIGN AND CONSTRUCTION WORK : Complete Engineering, design, manufacturing, fabrication, transportation including loading, unloading and handling at site, erection/installation, testing and commissioning of a Bi-Cable Jig Back Aerial tramway Ropeway system of length 700 m* for carrying 300 PPHPD on EPC mode with allide infrastructure necessary (based on the EPC design) for its smooth operations and maintenance as per the best Industry practice and various governing laws of states. All the design, execution, testing and commissioning at all levels including but not limited to following: (a) Civil and strucural work as per the latest CEN/ Bureau of Indian Standards (BIS) (b) Ropeway system and towers as per the latest European Committee for Standardization (CEN) (c) Other infrastructure like Generator set, LT Pannel and all others associated E & I works as per the latest Bureau of Indian Standards (BIS) Also Adhering to the General Conditions of Contract, Special condition of Contract and Scope of Work as given in Technical specifications/ tender drawings, employers requirements mentioned in Tender document Scope includes collection of all the site specific data required for design, erection, commissioning and operations of the system and getting all the design approved from appointed IIT/ consultant having tie up with CEN certified engineers as approved by authority..
OPERATION AND MAINTENANCE of ropeway system and allied infrastructure for the period of 5 years with overall Equipment Efficiency (OEE) of more than 90%.
Operation and maintenance cost for 1st Year
Operation and maintenance cost for 2nd Year
Operation and maintenance cost for 3rd Year
Operation and maintenance cost for 4th Year
Operation and maintenance cost for 5th Year
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.72 MB
Tendernotice_2.pdf
PDF • 1.59 MB
Tendernotice_3.pdf
PDF • 14.36 MB
BOQ_70792.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid