Loading…
Loading…
Tender Value
₹14.8 L
EMD Value
₹29,700
Closing Date
31 Jul 2026, 12:00 pm
EXECUTIVE ENGINEER
EE RED SECOND FLOOR VIKAS BHAWAN BAREILLY
In village Kalari construction of a CC road from Shaukat Pradhan s house to the canal culvert. (MLAY-Bithrichainpur)
2026_REDUP_1165597_1
663/01/EE/RED/NIVIDA/2026-27 DATE 20-05-2026
Open Tender
Civil Works
90 days
BITHRICHAINPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹29,700
1 Jul 2026
1 Jul 2026
31 Jul 2026
1 Jul 2026
31 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - |
| 1 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251 | 20.31 | cum | 209 | ₹4,244.79 |
| 2 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 | 9.33 | cum | 3,705 | ₹34,567.65 |
| 3 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 18.95 | cum | 5,500 | ₹1,04,225 |
| 4 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 4 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). | 21.8 | Sqm | 217 | ₹4,730.6 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - III ( with 22.40-53 mm size stone ballast) As per technical specification clause 405. | 57.14 | cum | 4,236.7 | ₹2,42,085.04 |
| 6 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) | 106.53 | cum | 7,833 | ₹8,34,449.49 |
| 7 | Supply & Laying of Polythene sheet 125 Micron for separation layer Including all Material, Labour T&P ……..Complete .(As sanctioned by S.E. Bareilly) | 690 | Sqm | 20 | ₹13,800 |
| 8 | Making contraction joint in C.C. Road ................ Complete as per directed by E/I (senctioned by S.E. Bareilly). | 200 | rmt | 38.5 | ₹7,700 |
| 9 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283A. | 0.23 | cum | 8,881 | ₹2,042.63 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
T1.pdf
Tender Documents • 1.64 MB
BOQ_2186062.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid