Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC aoc | |
| 2 | L2₹1.5 L+₹12,000 (8.89%)Rejected-Finance 55 M G ROAD DEWAS M P | DEWAS | DEWAS | MADHYA PRADESH | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
13 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Incharge Officer
Municipal Corporation A.B. Road Dewas
Tender for installation of auto timer in citys different places switching point
2023_UAD_313403_1
192/electric/2023 dewas 29.09.2023
Open Tender
Miscellaneous Services
Item Rate
60 days
Dewas
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,000
Yes
₹60,000
Yes
9 Jul 2024
29 Sept 2023
16 Oct 2023
29 Sept 2023
13 Oct 2023
29 Sept 2023
Supply and Installation HARDWARE Procurement and installation of a Three Phase Unified Regulation System (URS) designed for comprehensively managing the regulation of a collection of street lights. The device have the following provisions- 1.1 Regulating Unit a) 240 MHz and dual core processor. b) Communication mode : GSM/ GPRS. c) 4.5kA (short duration) max peak surge current, max energy of 100J at an operating voltage of 250V and an operating temperature range of -40℃ - 80℃. d) Over-The-Air (OTA) firmware update capability. e) 2KW (approx 40 lights @50W each) load regulation per phase. f) 12 seconds of lead time for real time feedback of all operations and commands within a good network connection. g) Software based timer (Indian Standard Time). 1.2 Enclosure a) SMC/FRP/Thermosetting material. b) Fire-retardant material- Class FV-0 as per IS:11731 Part-II or V-0 as per UL-94. c) High heat distortion resistant. High heat distortion temperature should be 200°C as per IS:10192. d) The enclosure must have rubber beadings constructed to give a water tight compartment to ensure 100% weatherproof and waterproof. e) Rust proof, termite proof, shockproof, pilferage proof and watertight and non-hygroscopic in nature and shall conform to IP55. 1.3 Communication Module a) Capability to establish Full duplex secure communication through cellular networks (GSM/GPRS) b) Capability to issue commands centrally for tasks such as activating, deactivating, or scheduling. c) Communication protocol used should be Message Queue Telemetry Transfer protocol (MQTT) to ensure realtime communication. d) Token based authentication between device and cloud. SOFTWARE Providing cloud-based Software for online surveillance of the URS. The Software must have following - a) Accessibility through desktop and mobile platforms. b) Dashboard interface displaying the status of individual master devices. c) Refresh Token based authentication. d) Remote schedule and regulate the activation and deactivation of the master device via the dashboard. e) Remotely grouping of devices using software. f) Central and group-level master regulation. g) Interface for Hierarchy based regulation of users over devices. h) Should be a progressive web application that can be used across multiple platforms.
Supply and Installation HARDWARE Procurement and installation of a Three Phase Unified Regulation System (URS) designed for comprehensively managing the regulation of a collection of street lights. The device have the following provisions- 1.1 Regulating Unit a) 240 MHz and dual core processor. b) Communication mode : GSM/ GPRS. c) 4.5kA (short duration) max peak surge current, max energy of 100J at an operating voltage of 250V and an operating temperature range of -40℃ - 80℃. d) Over-The-Air (OTA) firmware update capability. e) 5KW (approx 100 lights @50W each) load regulation per phase. f) 12 seconds of lead time for real time feedback of all operations and commands within a good network connection. g) Software based timer (Indian Standard Time). 1.2 Enclosure a) SMC/FRP/Thermosetting material. b) Fire-retardant material- Class FV-0 as per IS:11731 Part-II or V-0 as per UL-94. c) High heat distortion resistant. High heat distortion temperature should be 200°C as per IS:10192. d) The enclosure must have rubber beadings constructed to give a water tight compartment to ensure 100% weatherproof and waterproof. e) Rust proof, termite proof, shockproof, pilferage proof and watertight and non-hygroscopic in nature and shall conform to IP55. 1.3 Communication Module a) Capability to establish Full duplex secure communication through cellular networks (GSM/GPRS) b) Capability to issue commands centrally for tasks such as activating, deactivating, or scheduling. c) Communication protocol used should be Message Queue Telemetry Transfer protocol (MQTT) to ensure realtime communication. d) Token based authentication between device and cloud. SOFTWARE Providing cloud-based Software for online surveillance of the URS. The Software must have following - a) Accessibility through desktop and mobile platforms. b) Dashboard interface displaying the status of individual master devices. c) Refresh Token based authentication. d) Remote schedule and regulate the activation and deactivation of the master device via the dashboard. e) Remotely grouping of devices using software. f) Central and group-level master regulation. g) Interface for Hierarchy based regulation of users over devices. h) Should be a progressive web application that can be used across multiple platforms.
Supply and Installation HARDWARE Procurement and installation of a Three Phase Unified Regulation System (URS) designed for comprehensively managing the regulation of a collection of street lights. The device have the following provisions- 1.1 Regulating Unit a) 240 MHz and dual core processor. b) Communication mode : GSM/ GPRS. c) 4.5kA (short duration) max peak surge current, max energy of 100J at an operating voltage of 250V and an operating temperature range of -40℃ - 80℃. d) Over-The-Air (OTA) firmware update capability. e) 6KW (approx 62 lights @96 W each) load regulation per phase. f) 12 seconds of lead time for real time feedback of all operations and commands within a good network connection. g) Software based timer (Indian Standard Time). 1.2 Enclosure a) SMC/FRP/Thermosetting material. b) Fire-retardant material- Class FV-0 as per IS:11731 Part-II or V-0 as per UL-94. c) High heat distortion resistant. High heat distortion temperature should be 200°C as per IS:10192. d) The enclosure must have rubber beadings constructed to give a water tight compartment to ensure 100% weatherproof and waterproof. e) Rust proof, termite proof, shockproof, pilferage proof and watertight and non-hygroscopic in nature and shall conform to IP55. 1.3 Communication Module a) Capability to establish Full duplex secure communication through cellular networks (GSM/GPRS) b) Capability to issue commands centrally for tasks such as activating, deactivating, or scheduling. c) Communication protocol used should be Message Queue Telemetry Transfer protocol (MQTT) to ensure realtime communication. d) Token based authentication between device and cloud. SOFTWARE Providing cloud-based Software for online surveillance of the URS. The Software must have following - a) Accessibility through desktop and mobile platforms. b) Dashboard interface displaying the status of individual master devices. c) Refresh Token based authentication. d) Remote schedule and regulate the activation and deactivation of the master device via the dashboard. e) Remotely grouping of devices using software. f) Central and group-level master regulation. g) Interface for Hierarchy based regulation of users over devices. h) Should be a progressive web application that can be used across multiple platforms.
B K LIGHT AND SOUND
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .