| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹10.9 LAccepted-AOC | Ist | Accepted-AOC first lowest | |
| 2 | IInd₹11.3 LAccepted-AOC | IInd | Accepted-AOC second lowest |
Tender Value
₹10.1 L
EMD Value
₹25,500
Closing Date
18 Jan 2020, 5:00 pmClosed
Assistant Executive Engineer
Transmission Subdivision Kurumassery,110kV Substation compound, N.Paravur,Mannam.P.O pin 683520
Construction of 110kv Bay and installation of an additional 12.5 MVA 110/11kV Transformer
2019_KSEB_330319_1
08/19-20/AEE/TSD/Kumy dtd 18.12.2019
Open Tender
Civil Works - Others
Item Rate
110kV Substation N.Paravur
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,950
online
₹25,500
30 Jan 2020
26 Dec 2019
22 Jan 2020
26 Dec 2019
18 Jan 2020
30 Dec 2019
Picking 40/20 mm metal from yard stacking outside for taking measurement cleaning for reuse and spreading back the same after the completion of the work as per direction of departmental officers at site.
Dismantling the chain link fencing from iron post without damaging the same and stacking at a suitable place as directed by deptl officers
Dismantling and stacking the chain link fencing iron post including all earth work and dismantling of concrete etc. complete without damaging the same and stacking at a suitable place as directed by deptl officers
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed in all kinds of soil.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock
Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered):
Providing and laying in position 1:4:8, 40mm cement concrete for tower footing,revetment and below pile cap of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Stub setting for equipments in correct alignment using template, water level etc in concrete foundation excluding cost of excavation, concreting and back filling but including grouting anchoring etc. and removing stub setting template after the predetermined setting period etc. complete as per specifications and directions of departmental officers at site
Setting up anchor bolt in correct alignment using template or water level etc in concrete foundation excluding cost of excavation, concreting and back filling but including grouting anchoring etc. and removing template after the predetermined setting period etc. complete as per specifications and directions of departmental officers at site
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering shuttering,finishing and reinforcement-All works up to plinth level reinforced cement concrete 1:1.5:3 using 20mm broken stone including watering ,curing and cost of form working but excluding costof reinforcement for yard equipment foundation work
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Steel reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete up to plinth level Thermo-Mechanically Treated bars
Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
Plastering with cement mortar 1 :4 ,12 mm thick one coat
Filling available excavated earth (excluding rock) in trenches ,plinth,sides of foundations etc,in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering ,lead upto 50m and lift upto 1.5m.
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Description of Work / Item(s)
Quoted Amount of BOQ1 in figures
GST Rate in percentage
vishnuduth
vishnuduth
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .