Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAccepted-AOC NOT AVAILABLE | ₹45.9 L | L1 | Accepted-AOC Award to L1 |
| 2 | L2₹49.2 L+₹3.3 L (7.09%)Rejected-Finance | ₹49.2 L+₹3.3 L (7.09%) | L2 | Rejected-Finance Found L2 |
| 3 | L3₹52.3 L+₹6.4 L (14.0%)Rejected-Finance V PO TALARA TEHSIL FATEHPUR DISTT KANGRA HP | MANDI | HIMACHAL PRADESH | 175013 | ₹52.3 L+₹6.4 L (14.0%) | L3 | Rejected-Finance Found L3 |
| 4 | L4₹53.2 L+₹7.3 L (15.9%)Rejected-Finance VILL BHOL KHAS PO LARTI TEH JAWALI DISTRICT KANGRA HP | MANDI | HIMACHAL PRADESH | 175013 | ₹53.2 L+₹7.3 L (15.9%) | L4 | Rejected-Finance Found L4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | VIVEK KUMAR L4 | NEERAJ KUMAR SHARMA L3 | SANJAY GAUR L2 | ANKUSH KUMAR L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 370.93 | Cum | 247 ₹91,619.71 | 193 ₹71,589.49 | 183 ₹67,880.19 | 150 ₹55,639.5 Lowest |
| 2.00 | Excavation in Earth work and banking in 20 cm layers including breaking clods, ramming and dressing ground for thr purpose of making embankment or filling up ground depressions upto a lead of 20 m and lift upto 1.50 m in all respect and to the entire satisfaction of the Engineer-in-Charge. | 336 | Cum | 237 ₹79,632 | 293 ₹98,448 | 283 ₹95,088 | 50 ₹16,800 Lowest |
| 3.00Centering and shuttering including strutting, propping etc. and removal of form work for : | |||||||
| 3.01 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 844.77 | Sqm | 247 ₹2,08,658.19 | 193 ₹1,63,040.61 Lowest | 193 ₹1,63,040.61 Lowest | 250 ₹2,11,192.5 |
| 3.02 | Suspended floors, roofs, landings, balconies abd platform complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 200.08 | Sqm | 247 ₹49,419.76 | 193 ₹38,615.44 Lowest | 193 ₹38,615.44 Lowest | 250 ₹50,020 |
| 3.03 | Edges of slabs and breakes in floors and walls under 20 cm wide complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 1,143.14 | Rmt | 87 ₹99,453.18 Lowest | 93 ₹1,06,312.02 | 93 ₹1,06,312.02 | 130 ₹1,48,608.2 |
| 4.00 | Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 34.18 | Cum | 5,297 ₹1,81,051.46 | 5,600 ₹1,91,408 | 4,803 ₹1,64,166.54 | 4,800 ₹1,64,064 Lowest |
| 5.00Providing and laying in position reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) and curing complete in : | |||||||
| 5.01 | All work up to plinth level complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge | 63.02 | Cum | 8,297 ₹5,22,876.94 | 8,500 ₹5,35,670 | 7,883 ₹4,96,786.66 | 7,800 ₹4,91,556 Lowest |
| 5.02 | In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 61.51 | Cum | 8,297 ₹5,10,348.47 | 8,500 ₹5,22,835 | 7,883 ₹4,84,883.33 | 7,800 ₹4,79,778 Lowest |
Tender Value
₹42.9 L
EMD Value
₹71,823
Closing Date
5 May 2025, 5:00 pmClosed
District Project Management Unit HPCDP JICA ODA
District Project Management Unit HPCDP JICA ODA Phase-II, Opposite to Soil Testing Lab, Holta at Palampur
C/o Flow Irrigation Scheme Manbhari, Village- Sunehar, G.P. Jawali, Tehsil Jawali, District-Kangra (H.P.)
2025_HPCDP_104502_1
No.AGR. DPMU. KGR. F (7) Tender/13/2022-197
Open Tender
Civil Works
Item Rate
365 days
G.P. Jawali, Tehsil Jawali, District-Kangra
Please refer Tender documents.
15 documents required · 15 mandatory
₹1,500
District Project Management Unit HPCDP JICA ODA
₹71,823
District Project Management Unit HPCDP JICA ODA
1 Jul 2026
26 Apr 2025
6 May 2025
26 Apr 2025
5 May 2025
26 Apr 2025
28 Apr 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .