Loading…
Loading…
Tender Value
₹12.9 L
EMD Value
₹12,870
Closing Date
16 Jun 2026, 5:00 pmClosed
BDO, Lathikata
Panchayat Samiti Office, Lathikata
Works
2026_PRZLA_130779_2
BDO/LKT/01/2026-27
Open Tender
Civil Works - Others
Percentage
Lathikata
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
BDO, Lathikata
₹12,870
Yes
3 Jun 2026
3 Jun 2026
17 Jun 2026
3 Jun 2026
16 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation in hardsoil within initial lead and lift including rough dressing and breaking clods to max 5cm to 7cm and laying in layers not exceeding 0.30m in depth etc complete | 1 | Cum | 1 | ₹1 |
| 2 | Filling foundation and plinth with sand well watered and rammed etc complete | 1 | Cum | - | - |
| 3 | Cement Concrete (1:3:6) using 40mm size HBG metal including Cost,Coveyance, royality etc complete | 1 | Cum | 1 | ₹1 |
| 4 | C.C. (1:2:4) with 12mm and down grade C.B. chips approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 1 | Cum | 1 | ₹1 |
| 5Fly Ash brick masonary in CM(1:6) in using 23cmx11cmx8cm size brick including cost,conveyance,taxes,royality labour & T&P etc complete. A- foundation | |||||
| 6 | Fly Ash brick masonary in CM(1:6) in using 23cmx11cmx8cm size brick including cost,conveyance,taxes,royality labour & T&P etc complete. B- Super structure | 1 | Cum | - | - |
| 7 | RCC work for M-20 using 20mm and down graded h.g chips with cost,conveyance and royality etc.complete | 1 | Cum | - | - |
| 8Reinforcement for Rcc works includingcutting,bending,binding &tying the grills placing in position including cost of binding wire 18 to20mm gauge & cost of MS rod. | |||||
| 9 | Rigid smooth centering &shuttering for R.C.C Work including false work &dismentaling then after casting including cost of material complete-Beam and Column (i) Lintel Band | 1 | Qntl | 1 | ₹1 |
| 9.1 | Beam & Column | 1 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_594211.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .