Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC | ₹3.4 Cr | L1 | Accepted-AOC lowest rate |
| 2 | L2₹3.9 Cr+₹54.7 L (16.3%)Rejected-Finance P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | ₹3.9 Cr+₹54.7 L (16.3%) | L2 | Rejected-Finance Firm has quoted high rate |
Tender Value
Refer Docs
Closing Date
30 Jun 2021, 10:00 amClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizoram
PDG AND LYG OF READY MIX BC 30 MM TH INCL CORRECTION WK FOR RESURF WK KM 39 PT 635 TO KM 48 PT 00 COMMA KM 54 PT 00 TO KM 55 PT 50 AND KM 57 PT 50 TO KM 58 PT 785 NET 11 PT 15 KM ON CHK RD UNDER 74 RCC PROJECT PUSHPAK IN MIZORAM STATE
2021_BRO_450158_1
CA CE (P) PSK/13/2020-21
Open Tender
Civil Works
Item Rate
180 days
BET KM 39.635 to KM 58.785 ON CHK RD
As per Tender Docs
8 documents required · 8 mandatory
₹0
Exempted
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizor
26 Aug 2021
10 Jun 2021
1 Jul 2021
10 Jun 2021
30 Jun 2021
16 Jun 2021
11 Jun 2021 - 15 Jun 2021
14 Jun 2021
Amount
RESURFACING WORK ON CHAMPHAI-HNAHLAN-KHUANGPHAH ROAD BETWEEN KM 39.635 TO KM 48.000, KM 54.000 TO KM 55.500 AND KM 57.500 TO KM 58.785
Providing and laying of Bituminous Concrete (BC) 30 mm thick consolidated with bitumen VG-10/VG-30 as per clause 507 of MoRT&H (Ministry of Road Transports and Highways)(fifth revision) specification for road & bridge works, including tack coat as per clause 503 of MoRT&H (fifth revision) on the already existing BT surface, correction work with WBM 75 mm thick consolidated as per Clause 404 of MoRT&H (Fifth revision) and Prime coat over WBM correction surface as per Clause 502 of MoRT&H (Fifth revision) duly maintaining the road profile and laying the ready mix for Bituminous Concrete 30 mm with paver finisher and rolled as per clause 501.6 and 501.7 of Mort&H (fifth revision) to achieve desired compaction (including cost of conveyance of mix). Note : 1. The specification given at Clause 3004.2 of MoRT&H (Fifth revision) specifications will be complied while carried out correction work i.e Preparation of area for potholes and patch repair, filling/spreading with WBM materials and application of bitumen emulsion (prime coat) 2. The maximum area of correction work with WBM 75 mm thick consolidated thick will be 10% of BC area
SLT INFRACON PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .