Loading…
Loading…
Tender Value
₹5.1 L
EMD Value
₹5,100
Closing Date
8 Sept 2026, 4:00 pmClosed
DEPUTY EXECUTIVE ENGINEER, PATAN ELECTRICAL (R&B) SUB DIVISION, PATAN
All inclusive comprehensive Maintanance of A.C. Machine & Water Heater of Patan City Section Under control of patan electrical R&B sub division, Patan for period of one year. (2026-2027)
339285
06/04 OF 2026/2027
Open
Electrical and Maintenance Works
Works
Patan
7 documents required · 7 mandatory
₹900
Executive Engineer, Mehsana Electrical (R&B) Division, Mehsana
₹5,100
27 Aug 2026
27 Aug 2026
27 Aug 2026
8 Sept 2026
27 Aug 2026
Name Of Work- All inclusive comprehensive Maintanance of A.C. Machine & Water Heater of Patan City
Section Under control of patan electrical R&B sub division, Patan for period of one year. (2026-2027)
Rate at which the materials
SR Quantity Perticulars Place of delivery
will be charged to the
Signature of contractor Deputy Executive Engineer
Patan R&B Ele Sub Division
Name Of Work- All inclusive comprehensive Maintanance of A.C. Machine & Water Heater of Patan City Section Under control of
patan electrical R&B sub division, Patan for period of one year. (2026-2027)
Item Description Qty Unit Nett Rate Rate in Words Amount Rs.
All inclusive comprehensive maintenance cost for the
period of one year for the Split type Air-conditioning
1 Unit of following Capacity
(B) 1.5 ton capacity
(1) Charges for breakdown Maintenance as per 57 Ea. 1233.21 Rupees One
requirement throughout the year Thousand Two
Three And Paise
Twenty One Only
(2) Charges for 1st Routine Maintenance of Dry 57 Ea. 144.43 Rupees One
Services between date of commencement to 3rd Hundred Forty
Months from date of issue of work order. Four And Paise
Forty Three Only
(3) Charges for 2nd Routine Maintenance of wet 57 Ea. 267.65 Rupees Two
Services with water or Chemical as per site requirement Hundred Sixty
Services between 3rd months to 6th Months from Seven And Paise
date of issue of work order. Sixty Five Only
(4) Charges for 3rd Routine Maintenance of Dry 57 Ea. 144.43 Rupees One
Services between 6th months to 9th Months from date Hundred Forty
of issue of work order. Four And Paise
Forty Three Only
(5) Charges for 4th Routine Maintenance of wet 57 Ea. 267.65 Rupees Two
Services with water or Chemical as per site requirement Hundred Sixty
Services between 9th months to 12th Months from Seven And Paise
date of issue of work order. Sixty Five Only
(C) 2.0 ton capacity ( Single Circuit)
(1) Charges for breakdown Maintenance as per 121 Ea. 1464.50 Rupees One
requirement throughout the year Thousand Four
Hundred Sixty Four
And Paise Fifty
(2) Charges for 1st Routine Maintenance of Dry 121 Ea. 171.70 Rupees One
Services between date of commencement to 3rd Hundred Seventy
Months from date of issue of work order. One And Paise
(3) Charges for 2nd Routine Maintenance of wet 121 Ea. 317.14 Rupees Three
Services with water or Chemical as per site requirement Hundred
Services between 3rd months to 6th Months from Seventeen And
date of issue of work order. Paise Fourteen
(4) Charges for 3rd Routine Maintenance of Dry 121 Ea. 171.70 Rupees One
Services between 6th months to 9th Months from date Hundred Seventy
of issue of work order. One And Paise
(5) Charges for 4th Routine Maintenance of wet 121 Ea. 317.14 Rupees Three
Services with water or Chemical as per site requirement Hundred
Services between 9th months to 12th Months from Seventeen And
date of issue of work order. Paise Fourteen
All inclusive comprehensive maintenance cost for the
period of one year for the Inverter Based Split type Air-
conditioning Unit of following Capacity
(B) 1.5 ton capacity.
(A) Charges for breakdown Maintenance as per 2 Ea. 2282.60 Rupees Two
requirement throughout the year Thousand Two
(B) Charges for 1st Routine Maintenance of Dry 2 Ea. 267.65 Rupees Two
Services between date of commencement to 3rd Hundred Sixty
Months from date of issue of work order. Seven And Paise
Sixty Five Only
(C) Charges for 2nd Routine Maintenance of wet 2 Ea. 494.90 Rupees Four
Services with water or Chemical as per site requirement Hundred Ninety
Services between 3rd months to 6th Months from Four And Paise
date of issue of work order. Ninety Only
(D) Charges for 3rd Routine Maintenance of Dry 2 Ea. 267.65 Rupees Two
Services between 6th months to 9th Months from date Hundred Sixty
of issue of work order. Seven And Paise
Sixty Five Only
(E) Charges for 4th Routine Maintenance of wet 2 Ea. 494.90 Rupees Four
Services with water or Chemical as per site requirement Hundred Ninety
Services between 9th months to 12th Months from Four And Paise
date of issue of work order. Ninety Only
All inclusive comprehensive maintenance cost for the
period of one year for the Cassette type split Air-
3 conditioning Unit of following Capacity
(C) 2.0 ton capacity
(A) Charges for breakdown Maintenance as per 6 Ea. 3184.53 Rupees Three
requirement throughout the year Thousand One
Fifty Three Only
(B) Charges for 1st Routine Maintenance of Dry 6 Ea. 371.68 Rupees Three
Services between date of commencement to 3rd Hundred Seventy
Months from date of issue of work order. One And Paise
Sixty Eight Only
(C) Charges for 2nd Routine Maintenance of wet 6 Ea. 690.84 Rupees Six
Services with water or Chemical as per site requirement Hundred Ninety
Services between 3rd months to 6th Months from And Paise Eighty
date of issue of work order. Four Only
(D) Charges for 3rd Routine Maintenance of Dry 6 Ea. 371.68 Rupees Three
Services between 6th months to 9th Months from date Hundred Seventy
of issue of work order. One And Paise
Sixty Eight Only
(E) Charges for 4th Routine Maintenance of wet 6 Ea. 690.84 Rupees Six
Services with water or Chemical as per site requirement Hundred Ninety
Services between 9th months to 12th Months from And Paise Eighty
date of issue of work order. Four Only
Shifting of Split A.C. The Scope includes dismantling, 6 Ea. 1969.50 Rupees One
shifting, re-installing & re-commissioning of the units Thousand Nine
including topping up of Refrigerant gas, minor civil work Hundred Sixty
wiring existing piping M S Stand electrical cabling with Nine And Paise
PVC drown piping for 1.00, 1.5 & 2.0 TR capacity. Fifty Only
Replacing old & u/s by Replacement of defective 6 Ea. 847.39 Rupees Eight
remote control hand set with new battery cells.(A) Split Hundred Forty
Unit - Local make Seven And Paise
5 Thirty Nine Only
Replacing old & u/s by Supplying and erecting 18 RMT 1158.47 Rupees One
insulated pair of soft copper tubing open or concealed Thousand One
including power and control cable,necessary PVC drain Hundred Fifty
pipes for Split/Cassette AC machine up to 4 TR Eight And Paise
6 capacity Forty Seven Only
All inclusive comprehensive maintenance cost for the
period of one year for the water Heater( Geysers)
inclusive inlet & outlet water connections flexible piping
7 of following Type & Capacity
(A) 3 to 10 Ltr Instant /Storage Type 30 Ea. 611.05 Rupees Six
(B) 15 to 25 Ltr Storage Type 2 Ea. 693.87 Rupees Six
Three And Paise
Eighty Seven Only
Amount in Words
Rupees Five Lakh(s) Nine Thousand Seven Hundred Nineteen And Paise Seventy Three Only
I / We am / are willing to carry out the work at ________________________________
above / below ______________________________________________ percent ( should be
written in figures and words )
below / above the tendered rates mentioned above.
Amount of my / our tender works out as under :-
Estimated amount Estimated amount
put to be tender Rs. _____________ put to be tender Rs. _____________
Deduct ______% below Rs. _____________ Add ______% above Rs. _____________
In words :- In words :-
* Please strike out whichever is not applicable.
1. I / We hereby declare that I / We have visited the site and fully acquited myself / ourselves
with the local situtaion regarding materials, labour and other factors pertaining the work
before submeeting this tender.
2. I / We hereby declare that I / We have carefully studied conditions of contractors,
specifications and other the tender documents of this work and agree to work execute that
same accordingly.
3. Dismental value Rs. 2348/- Will Be Deuduct from the Bill
Sign of Contractor
Dy. Executive Engineer
Patan Electrical R&B sub. Div.
Dismental Material
Name OF Work: All inclusive comprehensive Maintanance of A.C. Machine & Water Heater of
Patan City Section Under control of patan electrical R&B sub division, Patan for period of one year.
Sr.No. Item Qty Unit SOR Rate Amount
Old & U/S Remote Control
2 Old & U/S Copper Pipe 18 Rmt 1025 10 102.5
Sign Of Contractor
Deputy Executive Engineer
Patan Electrical (R&B) Sub-Dn.,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
CONDITION OF A C AND WATER HEATER.pdf
G S T LTR.pdf
GR.pdf
NOTICE NO 06.pdf
PQ REGULAR.pdf
SCHEDULE A B AND DM.pdf
STANDARD BIDDING DOCUMENTS.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .