Tender Value
₹10.3 L
EMD Value
₹20,584
Closing Date
30 Aug 2026, 6:00 pm6d left
DEPUTY CONSERVATOR OF FOREST KOTA
DEPUTY CONSERVATOR OF FOREST KOTA
CONSTRUCTION OF CULVERT IN NAGAR VAN, DADDEVI
2026_FORES_591658_16
DCF KOTA NITNO53-2026-27
Open Tender
Civil Works
Percentage
90 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
1000 E GRASS CHALLAN AS PER NIT
₹20,584
Yes
30 Aug 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
30 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead upto 50 mtr. and lift upto 1.5 mtr. all kinds of soil | 94.5 | sqm. | 9 | ₹850.5 |
| 2 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed:
Hard rock (requiring blasting) useful material 30%
hard rock stone breaking for foundation of Culvert structure. | 1 | Cum. | 410 | ₹409.59 |
| 3 | Making of hole (width up to 150 mm) in R.C.C. slab/wall/beams by power driven drilling machine complete as per direction of EI
upto 150mm thick | - | per nos. | 176 | - |
| 4 | TMT bar of 16 mm, grouting main structure with ground, L Shape total length of TMT bar per grouting is 0.9 m , in total grouts nos 210 | 300 | kg | 80 | ₹24,000 |
| 5 | Providing and laying in position specified grade of cementconcrete for RCC structural elements upto floor five levelincluding curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls(any thickness) including attached pilasters, buttresses, plinthand string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. | - | Cum. | 5,609 | - |
| 6 | TMT bar of 10mm , used for re enforcing the concreate and fixing the 1 m dia. CC pipes in culvert, length of 10 mm rebar used is 503 mt | - | kg | 80 | - |
| 7 | T.M.T bar of 10mm and 8mm for foundation re enforcement ,156 mt TMT rebar of 8 mm, 420 mt of 10mm gauge TMT. | 320 | kg | 80 | ₹25,600 |
| 8 | TMT bar 420 m, of 10 mm , used for Top Horizontal Beam, and 112m of 8 mm TMT used for rings, rings | - | kg | 80 | - |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Columns, pillars, posts and struts etc.on both side of culvert structure and wing walls | - | Sqm. | 375 | - |
| 10 | R.C.C pipe procurement of 1m diameter Transportation of pipe from Newai to Kota Distence of 180 km dimension = 1m dia x 0.6 m length and thickness of 2 inches = 70 nos | - | nos | 3,500 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.98 MB
BOQ_1050630.xls
BOQ • 0.24 MB
53DATECORRIGENDUM.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].