Loading…
Loading…
| Sl No | Description | Qty | Unit | BABURAJ.K L2 | AJESH T V L1 |
|---|---|---|---|---|---|
| 1.00Drain Construction | |||||
| 1.00 | OD324926/2025-2026:DISMANTLING DR - Dismantling , clearing away and carefully , stacking materials useful for reuse for any thickness of walls in DR masonry | 1.62 | cum | 800.17 ₹1,296.28 | 764.68 ₹1,238.78 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 16.45 | cum | 379.97 ₹6,250.51 | 363.12 ₹5,973.32 Lowest |
| 1.00 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 2.59 | cum | 1,042.41 ₹2,699.84 | 996.18 ₹2,580.11 Lowest |
| 1.00 | OD324927/2025-2026:DR with Departmental stone- DRY RUBBLE MASONRY - Dry rubble without concrete levelling course using departmental rubble including packing to compactness to line and levels ,labour charges etc.complete as per directions of Departmental officers at site | 0.97 | cum | 1,812.48 ₹1,761.73 | 1,732.1 ₹1,683.6 Lowest |
| 1.00 | OD324925/2025-2026:DRY RUBBLE MASONRY - Dry rubble with out concrete levelling course masonry with good quality blasted rubble including packing to compactness to line and levels cost and convenience of all materials labour charges etc. complete as per directions of Departmental officers at site | 33.25 | cum | 4,218.28 ₹1,40,270.46 | 4,031.21 ₹1,34,049.83 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 8.22 | cum | 336.4 ₹2,766.89 | 321.48 ₹2,644.17 Lowest |
| 1.01 | 13.33.2:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Raised and cut pointing | 37 | sqm | 768.65 ₹28,440.05 | 734.56 ₹27,178.72 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 7.4 | sqm | 407.89 ₹3,018.39 | 389.8 ₹2,884.52 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 101.75 | kilogram | 118.75 ₹12,082.81 | 113.48 ₹11,546.59 Lowest |
Tender Value
₹1.9 L
EMD Value
₹4,763
Closing Date
31 Oct 2025, 6:00 pmClosed
PREETHA .TP ASSISTANT ENGINEER
veliyancode grama panchayath
Annual Plan Adiyarkulam Drainage Construction
2025_LSGD_814512_1
05/AE/LSGD/VKD-2025-26
Open Tender
Civil Works - Others
Item Rate
VELIYANCODE GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,763
Yes
3 Aug 2026
24 Oct 2025
3 Nov 2025
24 Oct 2025
31 Oct 2025
24 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1362522.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.26 MB
BOQ_1362522.xls
BOQ • 0.30 MB
affidavit.pdf
Tender Documents • 0.24 MB
fm.pdf
Tender Documents • 0.26 MB
preliminery.pdf
Tender Documents • 0.26 MB
viewsbd.pdf
Tender Documents • 1.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .