Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.8 L
EMD Value
₹4,500
Closing Date
24 Oct 2026, 2:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Estate Division,TDB
Executive Engineer, Estate Division,TDB
PALAMEL SASTHA DEVASWOM IN KARUNAGAPPALLY GROUP-RECONSTRUCTION OF THE DAMAGED COMPOUND WALL IN THE FRONT SIDE REG
2026_TDB_880368_1
EDT/eT-11/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
PALAMEL SASTHA DEVASWOM IN KARUNAGAPPALLY GROUP-RE
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
Yes
₹4,500
Yes
17 Oct 2026
17 Oct 2026
26 Oct 2026
17 Oct 2026
24 Oct 2026
17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PALAMEL SASTHA DEVASWOM IN KARUNAGAPPALLY GROUP-RECONSTRUCTION OF THE DAMAGED COMPOUND WALL IN THE FRONT SIDE REG:- | |||||
| 1.001 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 3.6 | cum | 2,542 | ₹9,151.2 |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.87 | cum | 359.72 | ₹1,392.12 |
| 1.003 | OD130274/2026-2027:Departmental Random rubble masonry in CM 1:6 with hard stone for foundation and basement | 3.6 | cum | 3,757.55 | ₹13,527.18 |
| 1.004 | OD130275/2026-2027:Random rubble masonry in CM 1:6 with hard stone for foundation and basement | 9.15 | cum | 5,603.11 | ₹51,268.46 |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 3 | sqm | 386.16 | ₹1,158.48 |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 59.54 | kilogram | 112.43 | ₹6,693.52 |
| 1.007 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.75 | cum | 10,488.77 | ₹7,866.58 |
| 1.008 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 6.1 | cum | 7,713.54 | ₹47,060.31 |
| 1.009 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 63.42 | sqm | 369.76 | ₹23,450.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_1497151.xls
BOQ • 0.32 MB
SBDPALAMEL.pdf
Tender Documents • 1.10 MB
formsanddeclarations.pdf
Tender Documents • 0.66 MB
preliminaryagreement.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .