The Executive Engineer (O&M), DGVCL Piplod Division Office, Surat.
Tender for ARC to release connection and rectification work with other activities as mentioned in sch-B for any scheme or various scheme in VADOD & BAMROLI AND ANY SUBDIVISION under PIPLOD Division.
292075
DGVCLDPPL/0630/03/2026 Approved Date: 30-03-2026
Open
Electrical
Works
Surat
1 document required · 1 mandatory
₹590
SURAT@DGVCL
₹2,000
31 Mar 2026
31 Mar 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
5.Pre-Qualification criteria for selection in Technical Bid
A. Copy of Pan Card of the Firm / Person of the bidder.
B. Work order or Experience certificate of any private or Government Company of
C. GST registration copy.
6. Separate provident fund code number towards registration of your firm
with Regional P.F. Commissioner.
7. EMD & Tender fee as described in the tender document.
8. The contractor who have been blacklisted with GUVNL/ DGVCL/ MGVCL/
UGVCL / PGVCL/ GSECL/ GETCO shall not be considered.
9. Duly signed online Technical Bid must be submitted along with tender
documents in technical bid by online. The tender for the bidder without Technical
Bid-1 will not be considered.
10. The bidder must have Goods and Service Tax (GST) Registration and same
shall be submitted along with the Tender only. The tender of the bidder without
GST Registration will not be considered.
The Bidders shall submit documentary evidences in support of all above
Qualification criteria, failing which the bid will be rejected.
The above documents will be analyzed and after satisfaction, the price bid will be
opened online only. DGVCL may verify the documents, experience certificates with
authority who have issued such certificates / details.
The price bid of only those bidders shall be opened online, who are pre-
qualified in Technical bid based on Bid Evaluation Criteria mentioned above.
1. The bidder have to be submit the copy of the pan card.
2. The bidder have to submit the copies of work completion certificate showing name
of owner, name of work, order amount, final completion amount, time limit
commencement date and completion date.
3. The bidder have to be submit the list of on going works along with name of owner,
name of work, order amount, commencement date, time limit, due date of
completion and expected date of completion
4.No tender shall be accepted / opened in any case after due date and time of
receipt of tender, irrespective of delay due to postal services or any other reasons
and the company shall not assume any responsibility for late receipt of tender.
5. The Earnest Money Deposit and tender fee will be accepted in Online mode
only.Please submit Technical Bid & price bidin online mode only.
The DGVCL reserves the rights to reject any or all tenders or accept any tender
without assigning any reason thereof.
Executive Engineer (O&M)
PIPLOD DIVISION
Name of Contractor __________________________
01 Should the tender be accepted :-
02 I / We hereby agree to abide by and fulfill all the terms and conditions of the tender as
applicable and in default thereof to forfeit and pay to the DGVCL the sum of money due.
03 The full value of the Earnest money deposit paid herewith should absolutely be forfeited to
the DGVCL if I / WE not deposit the full amount of security deposit in time.
04 I / we understand and agree that canvassing in any form will disqualify me /us.
Date: Sign. & Seal of contractor
Executive Engineer (O&M)
PIPLOD Division
Name of work: Tender for ARC to release connection and rectification work
with other activities as mentioned in sch-B for any scheme or various scheme in
VADOD & BAMROLI AND ANY SUB-DIVISION under PIPLOD Division.
Description Page No.
01 Section-A: Letter of Invitation of Tender & instructions to the Bidder. 5 to
Section-B: Technical Scope of work, Schedule-B: Schedule of price.
03 Section-C, Special Instruction to the tenderer 11 to
04 Section-D: Labour Laws and Safety Rule. 12 to
05 Section-E : Tender specification 12 to
06 Section –F : Special Terms and conditions 16 to
INVITATION OF TENDER & INSTRUCTIONS TO THE BIDDERS
SUB: Tender for ARC to release connection and rectification work with other
activities as mentioned in sch-B for any scheme or various scheme in VADOD &
BAMROLI AND ANY SUB-DIVISION under PIPLOD Division.
DGVCL, PIPLOD Division. Surat, Gujarat State is pleased to invite Tender for ARC to release
connection and rectification work with other activities as mentioned in sch-B for
any scheme or various scheme in VADOD & BAMROLI AND ANY SUB-DIVISION under
PIPLOD Division.
1. Tenders for the said works are invited in accordance with the following:
a) Section-A-This letter regarding invitation to tender and instructions to Bidder.
b) Section-B Technical specifications and scope of work as per attached.
c) Section-C-Cost of equipment and other charges as per schedules B.
d) Section-D-Labour laws and safety rules.
e) Section E- General Terms & condition of contracts applicable to work contract.
f) Section-F- special Terms and conditions regarding Labour laws and other related matters
attached. (Applicable for erection/works to be carried out at site).
g) Conditions mentioned in This Invitation of Tender & Instructions to the Bidders shall over
ride similar conditions mentioned in the “General terms and conditions of contracts
enclosed as Section-E. If you are in a position to quote, your tender should be submitted
to this office on or before due date.
h) In this offer the word “DGVCL” means DGVCL, Surat having its corporate Office at Nana
Varachha Road, Kapodra, Surat Printed terms & conditions of the Bidder will not be
considered as forming part of the tender.
j) Bidder must indicate the official designation and authority of the individual signing
The tender. The Bidder shall submit their P.F. code no. allotted to them by Regional P.F.
Commissioner and copy of challan through which PF deposit in provident office. Failure to
do so is likely to result in the offer being ignored.
2. IMPORTANT DATES:
The time and date of receipt of tender and date of opening Technical bids are as under:
1. Time and date of opening of technical bids: At 12.00 hours on As mentioned in
2. Time and date of on line opening of price bid: At 15.00 hours on As mentioned in
The tender will be opened on the date and time specified as above in office of the Ex. Engineer
(O&M), DGVCL ,PIPLOD Div. in presence of the authorized representatives of the Bidder, who
wish to remain present at the time of bid opening.
Bidder is responsible for ensuring that the bids are actually received well in time and at the
place mentioned above only. DGVCL shall be neither responsible for late Tender neither receipt
nor shall entertain Tenders received after due time and date.
Conditional tenders are not accepted. In tender the Price should be given above/ below in
percentage only.With tender you are required to submit License Copy, Original solvency
Certificate P.F. No., PAN Card No., G.S.T.No. , PF Registration No, If you are the lowest than,
You have to pay 5% of Order value SD, Execute the agreement, Indemnity Bond, Sub order may
be issue after complete the above official tender formalities..
4. MODE OF DESPATCH OF TENDER/BID:
Tender is to be submitted in online mode only.
5. OFFER TO BE MADE ACCORDING TO TENDER DOCUMENTS:
Offer / Tender / Bid must be in accordance with and must be responsive to this invitation to
tender and all documents appended hereto. Incomplete tender, amendments and additions to
tender received after the bid deadline, amendment and addition to tender received prior to bid
dead line but which are not in sealed covers and not super scribed as stipulated below and late
tender are liable for rejection. Printed General terms and conditions of the Bidder shall not be
6. SECURITY DEPOSITS:
a) Successful Bidder shall pay security deposit equivalent to 5% of the order value
within a week from the date of issue of letter of Intent. The Security Deposit shall be paid
in cash or by crossed demand draft drawn on payble at , Surat in favour of “Dakshin Gujarat
Vij Co. Ltd”, this security deposit will be valid till work completed satisfactorily and final bill is
b) This Security Deposit is for the due performance of contract and the same is liable to be
forfeited by the DGVCL in event of non-fulfillment of the terms & conditions of this contract
by the contractor.
c) Refund of S.D. will only be made on return of the original money receipt given by the
DGVCL or in case of loss of the receipt the contractor shall furnish an indemnity
Bond duly stamped under the Bombay stamps act. And receipt of NOC from DE of
07. PRICE EVALUATION:
No price preference shall be given on any account. All Tenders shall be evaluated on firm Price End
Cost (with GST and Cess as applicable) basis unless otherwise mentioned in the Tender documents.
If the Tender is invited with Total Owning Cost (TOC) Clause, the evaluation shall be done accordingly.
For the same, the Bidders have to give the detailed breakup of the End Cost.
Prices quoted should be FIRM and on F.O.R. Destination basis (i.e. any of the stores of COMPANY in
Gujarat). However, the Tenderer should indicate in the Schedule– “B” (i.e. Price Bid), the break-up of
Total Unit F.O.R. Destination Prices and Total Unit End Cost with GST and Cess as applicable stating the
Unit Ex-works price, freight, packing & forwarding charges, Insurance Charges, GST and Cess as
applicable separately in price bid, which is a must.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration &self-certified Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the contract, the
rate (i.e. price) mentioned in the price bid shall be final and any additional GST will have to be borne by
the tenderer himself. In no case additional amount towards GST or otherwise will be paid / reimbursed
to supplier/contractor. Further Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for
each item of Goods/Service. If not specifically mentioned then COMPANY will have the option to take
the prices as exclusive of taxes and duties at maximum higher slab rates for the evaluation of the
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B). The
price bid submitted in physical mode shall not be considered. The Tenderer should invariably indicate
the total unit end cost price considering all their costs / calculations in the Price bid itself for each item
and all sub-items if any. This is a must. Cost components hidden / furnished elsewhere will not be
considered and will be ignored out rightly. Every bidder shall inform their GSTIN No. of the registered
place(s) wherefrom the bidder intends to supply the goods / services, meaning thereby the bidder have
to supply the goods / services from the relevant declared / registered place of supply only.
The tender shall remain open for acceptance for a period of given in tender from the date of price bid
opening. The DGVCL will intimate the date and time for opening of price bids, after receipt and scrutiny
of Technical bids.Any further extension of validity, if and when requested, shall be given without
changing prices, terms and conditions. Also the validity of EMD shall be extended accordingly.
a) GOODS AND SERVICE TAX
The above rates are as per the prevailing SOR of the company and as and when
any changes made by government. It will be applicable as per the rule. DUE TO
IMPLEMENTATION OF GST,IT IS COMPULSORY TO SUBMIT ALL THE RELEVANT
DOCUMENTS SUCH AS GSTIN,HSN CODE AND SAC CODE.
The F.O.R. Destination prices are EXCLUDING VAT/GST and Cess as applicable which
will be paid extra on a given taxable goods and/or services within the original contractual
delivery period. The amount of GST and Cess as applicable should clearly be indicated
separately. (GST/Cess means all applicable Tax/Cess under GST Laws. GST Laws means
IGST Act, GST(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act
and SGSCT Act, 2017and all related ancillary legislations).You shall have to submit a C.A
Certificate& duly authorized Signatory of successful bidder, certifying that you have not
claimed Refund of any applicable GST and Cess, charged to DGVCL or shall not claim any
such Refund, on a future date, from the concerned Authorities and if, any Refund, in
respect of such GST/ and Cess, is claimed by you, it will be immediately passed on to the
COMPANY, without/COMPANY making any specific Claim, for the same, either from the
Department or from you.The offers having price INCLUSIVE OF GST and Cess is likely to
be rejected if the rate of GST and Cess is not mentioned clearly unless the bidder has
opted for Composition Scheme under GST act which be should be clearly indicated in the
price bid. Company may at its discretion consider such offer with presumption of highest
applicable rate of GST/Cess prevailing when the price quoted is inclusive of GST and
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will
have to be borne by the tenderer. In no case additional amount towards tax or otherwise
will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will
not be applicable in case of Supplier / Contractor has opted for Composition Scheme
under GST.Supplier/Contractor should charge GST in Invoice at the rate as agreed to /
mentioned in acceptance of tender only and any deviation in the same shall not be
accepted. Further, any additional liability of GST (later on due to wrong mentioning of
GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above as charged in the
invoice shall be borne by the Supplier/Contractor. However, any refund received by the
supplier / contractor on account of GST charged from the company; such refund shall
have to be passed on to the company, along with interest if any. Such refund along with
interest needs to be passed on suo-moto by the supplier / contractor. Further, the
Company has a right to recover the amount of GST along with penal interest at the rate
of 15% per annum if GST charged is not paid / short paid to the government or fail to
upload the details or uploads inaccurate particulars on GSTIN portal by the Supplier /
Contractor within the stipulated time limit. In case, Govt. revises the rate of GST rate /
Code during the tenure of the contract, the provision of GUVNL’s statutory variation
clause shall apply.
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any
other additional item of their inputs / input services under the ambit of the Input Tax Credit provisions
under the GST Act, subsequent to the date of submission of the offer, the same should be passed on to
COMPANY and you should inform such changes to COMPANY from time to time.
Deduction of Income Tax from the bill shall be made as per Income Tax Rules prevalent
at the time of payment.
12) STATUTORY VARIATION: Any statutory increase or decrease in the taxes and duties
including GST and Cess as applicable or in the event of introduction of new tax/cess or
cessation of existing tax/cess subsequent to suppliers offer if it takes place within the original
contractual delivery date will be to COMPANY’s account subject to the claim being supported by
documentary evidence. However, if any decrease takes place after the contractual delivery
date, the advantage will have to be passed on to company.Statutory Variation clause shall not
be applicable in case of Supplier / Contractor has opted for Composition Scheme under GST.
13. PAYMENT TERMS:
No advance payment shall be made.
The payment will be release within 30days from the date of receipt of bill without
any query to the account section
14. PENALTIES FOR DELAYS:
The delivery, erection and commissioning periods (as applicable) shall be guaranteed under
penalty clause mentioned below. Any delay that may take place in erection and commissioning
activities beyond contractual cut of date shall be subject to penalty at the rate of 2% of the
contract value (of delayed materials/works) per month or part thereof subject to a maximum of
10% of the total contract value.
INSURANCE ERECTION AT SITE:
This is entirely in the scope of the Bidder; the bidder will have to make their own
arrangements for insuring the all materials and equipments possessed by him and also for
Laborers etc. The DGVCL will not be responsible for any loss or damage either to Bidder’s
personnel or to the equipment/materials.
16. PRINTED TERMS & CONDITIONS WILL NOT BE CONSIDERED:
Printed terms & conditions of the Bidder will not be considered as forming part of the tender.
17. DESIGNATION & AUTHORITY OF THE PERSONS SIGNING THE TENDER:
Bidder must indicate the official designation and the authority of the individual signing the
18. BIDDERS TO ENSURE RECEIPT OF THE OFFERS BY EXECUTIVE ENGINEER (O & M),
DGVCL, PIPLOD Division, Surat.
Bidder is responsible for ensuring that their tenders are actually received in time and the place
mentioned above.
19. CANVASSING NOT PERMITTED:
Bidder should not canvass their offer personally or otherwise by approaching to any Officers of
the DGVCL. If any Bidder wants to make any representation regarding his offer, he should write
to undersigned, but personal oral representation is not permitted. Inspite of the above clear
instructions, if any Bidder is found to canvass his offer or against his competitor’s offer through
personal approach to officers of the DGVCL, his offer will be rejected without assigning any
reason and the firm may even be blacklisted.
20. CLARIFICATIONS REQUIRED BY BIDDER:
If any Bidder require any information and/or clarification on any point of technical or commercial
nature pertaining to this tender enquiry or on any of the conditions or requirements indicated in
the tender documents, the same should be given in writing in duplicate to the under mentioned
EXECUTIVE ENGINEER
DAKSHIN GUJARAT VIJ
PIPLOD DIVISION SURAT
21. ARBITRATION CLAUSE:
All questions, disputes or differences what so ever which may at any time rise between the
parties to this agreement touching the agreement or subject matter thereof, arising out of or in
relation thereto and whether as to construction or otherwise shall be referred to the decision of
the sole Arbitrator, appointed by the chairman, DGVCL for that purpose, who shall be a retired
High Court Judge or a retired District and sessions Judge and the decision of the said, Arbitrator
shall be final and binding upon the parties. Reference to the Arbitrator shall be governed by the
provision of Indian Arbitration & Conciliation Act, 1996 as amended from time to time and the
rules made there under. The arbitration proceedings shall be conducted at Chief Engineer
(O&M), DGVCL, Corporate Office, Surat or at such places as the sole Arbitrator may determine.
The award of sole arbitrator shall be final and binding upon the parties. The arbitrator shall pass
reasoned award.
22. AGREEMENT & BOND:
Necessary contract agreement shall have to be executed in prescribed format by successful
bidder on a stamp paper of appropriate value of Rs. 300/- at their own cost. The agreement is
to be executed for the complete work referring to this work order and shall be signed by an
authorized person of your company with seal of the bidder. For this purpose, their authorized
signatory shall have to visit this office on any working day, as some of the documents have to
be signed in presence of DGVCL’s officials.
23.TERMINATION:
The DGVCL may terminate the contract at any time by giving a written notice of 30 days for any
case if your performance as a whole OR part, is found unsatisfactory. Whether terminated for a
cause of convenience, payment to the actual work done and the calculated pro-rata and not to
lump sum amount payable under the normal conditions for the successful completion of the
entire work. In addition in case of contract is terminated for convenience and though no fault of
you. You shall be paid also for commitments, which cannot be terminated and paid at the time
of termination. Upon receipt of written notice, you shall attempt to terminate all commitments
and otherwise minimize all costs. To order that the work of the contractor be measured up and
to take such part thereof, as shall be unexecuted, out of his heads and to give it to another
contractor to complete, in which case, any expenses, which may be incurred in excess of the
sum, which would have been paid to the original contractor, if the whole work had been
executed by him (as to the amount of which excess expenses the certificate in writing of the
Engineer-in-charge shall be final, conclusive and shall be borne and shall be paid by the original
contractors and shall be deducted from any money due to him by the DGVCL under the contract
or otherwise from his security deposit of the proceeds sale thereof or a sufficient part thereof.
24. FORCE MAJEURE:
Force majeure is herein defined as
(1) Any cause which is beyond control of a Seller or The DGVCL as the case may be
(2) Natural phenomena including but not limited to weather condition, floods, droughts,
earthquakes and epidemics
(3) Acts of any Governmental authority domestic or foreign including but not limited to war,
declared or undeclared, priorities, quarantine, embargoes, licensing control or production
or distribution restrictions
(4) Accidents and disruptions including but not limited to fires, explosions, breakdowns, of
essential machinery or equipment and power shortage
(5) Transportation delay due to force majeure or accidents:
(6) Strikes, slowdown, lockouts and sabotage
(7) Failure or delay in the Seller’s source of supply due to foregoing force majeure
(8) Failure to reach agreements as set forth below.
(a) The Seller shall not be liable for delays in performing his obligation resulting
directly or indirectly from any Force Majeure cause as referred to and defined in
paragraph (a) above.
(b) The Seller shall within 10 days from the beginning of any such delay notify the
DGVCL in writing of the cause of delay.
(c) The DGVCL shall ascertain the facts and the delivery period shall subject as
hereinafter provided, be extended for a period equal to the time lost by reason of any such
cause even though such cause may occur after the Seller’s performance of his obligation
has been delayed for other causes. If such delay lasts for more than 6 months, the
DGVCL and Seller shall immediately consult each other for purpose of agreeing upon a
reasonable basis on which the contractor shall resume production of the unfinished
equipment and if the parties do not agree upon a solution of the problems involved,
including adjustment of the price, such price adjustment being both upwards and
downwards depending on the variation in the base indicates of materials and labour
(Provided however if complete dispatch is made within 12 months from the commencement
of delay there shall be no price adjustment) then either party may, by written notice, cancel
that portion of the equipment which is delayed. In the event of cancellation, the parties
shall endeavor to agree on the amount of reasonable and proper cancellation charges, if
any, if they fail to reach an agreement within 90 days after the date of cancellation, either
party may refer the matter to arbitration pursuant to Article 40. All the provisions clause
shall apply whether the disruption caused is total or partial in its effect upon the ability of
the Seller to perform.
25. If you are in a position to quote as per the term and condition mention in the tender, your tender
submitted to this office on or before due date. If the Bidder wishes, he may familiarize himself
with the site conditions by visiting plant / site office.Any representation at a letter date in this regard
shall not be entertained. On production of proof of purchase of the tender documents, the site officers
will permit for site visit.The DGVCL reserves the right to accept any tender and or to reject any or all
tenders without assigning any reason thereof. No correspondence shall be entertained in this regard.
Yours faithfully,
EXE. ENGINEER (O&M),
PIPLOD DIVISION .
TECHNICAL SCOPE OF WORK and GENERAL CONDITION OF CONTRACTOR
1. The work entrusted as per the contract should be soundly constructed in accordance
with the best practice and should present a neat appearance when complete. All the
works have to be carried out accordingly to the drawing and specifications and as per
the instruction of Engineer-in-charge. There should not be any damage or injury to
material of other’s property during transport or erection.
2. Marshy or water logged locations must be avoided as far as possible. If it becomes
inevitable to locate poles at such points special pre-cautions about foundation will have
to be taken and work carried out as per instruction of Engineer-in-charge.
2. GENERAL CONDITION OF CONTRACTOR:-
1. All single pole structures, special strucial; structures & fitting of cross arms, earthing etc.
should be carried out according to standard drawings available or reference in the Company’s
Divisional Office.
2. Quantities: - The quantities mentioned in the accompanying schedule are only approximate,
Actual quantities may increase or decrease according to the local conditions. The company
reserves the right or revising or deleting any of the quantities to be erected by during the
execution of the contractor and the final quantities actually erected by the contractor will be
calculated and paid for at the rates given in the contractor schedule of rates.
(a) Whenever there is an excess work carried out by a contractor beyond the technically
sanctioned amount against the work order, the approval for the excess quantity of work
done should be obtained from the competent authority as per Company’s rules.
3. Dakshin Gujarat Vij Co.. Ltd. Does not bind itself to accept the lowest or any tender.
(a) Closing down and recommencement of works at all stages must be intimated by the
contractor to Engineer-in-charge or Vice-versa in writing with reasons if any failing which
their claims for extension of time will not be entertained.
4. The work will have to be carried out as per programmed fixed out by the Company and the
contractor should employ proper and competent supervisors who should thoroughly supervise
the execution of work by being on present on the work site through out.
5. No tools will be supplied except jointing dies by the Company and the Contractor should
make his own arrangement to get adequate quantities of all other tools in order to complete
the job within the prescribed period jointing dies will be supplied free of charge.
6. Starting of work and commenced period: the erection work should be commenced within
days from the date specified in the order issued by the Executive Engineer and should be
completed within the prescribed period for each work.
7. Minimum period of Guarantee if during 12 calendar months from the date of handling over
charge after completion of work the erected lines are found defective in any way, the same
should be rectified by the Contractor.
8. All the general conditions of contract to the company will be applicable to this order. An
agreement is to be sighed in the prescribed form.
9. R.A. Bills – Bills will be prepared once a month looking to the progress of the work and
payment will be as under.
a) Running bills may be paid on the works carried out after measurements are recorded up to
80 % and on submission of material account by the contractor.
b) Final bill for the contract will be paid after completion of work recording measurement and
after submission of materials account by the contractor.
10. The contractor after completion of the work shall prepare the final detailed materials account
of the materials received by him from the Company’s stores within one month from the date
of completion of work ,if ,however the contractor does not tender the material account a
Register A.D. Notice will be issued to him, if within ten days from the date of issue of such
notice there is no replay from the contractor, the material account will be finalized and
recoveries made as per the Company’s account which shall have to be account which shall to
be accepted by the contractor. Disputes if any raised later shall not be entertained.
11. The contractor is bound to complete the work within the specified period for each work, given
by the Executive Engineer.
12. The Contractor will remain in force for the period given in tender
13. Priority of work would be decided by the Executive Engineer and contractor shall carry out the
work within the stipulated period for the order issued by the Executive Engineer.
14. The contractor must have adequate resources and gang of unskilled and skilled persons to
under-take the work at different place.
15. The contractor will be given separate order for each work on the basis of the rate contract
order, the date of commencement and date of completion of work will be stipulated in order
which the contractor has to agree otherwise the penalty will be livable for the completion of
work as per Company’s standard condition.
The soil may be hard or normal the tender should fill in the rate after seeing the site.
16. The contractor shall be responsible for returning the residual materials after completion of
the contract and if he fails to return the balance material supplied to him by the Company,
the cost of the residual materials will be recovered from the contractor at material account
plus 15% It is certified by the contractor that-
1. I/We hereby agree to abide by and fulfill all the terms and provision of the ‘’ The
Tender and contract for work’’ as applicable and in default there of to forfeit and pay
to the Company sum of money as become due.
2. The full value of the ‘’Earnest Money Deposit’’ paid herewith shall be absolutely
forfeited to the Company should I/We not deposit the amount of specified security
deposit-in-time.
3. The competent can delete any time in Schedule ‘’B’’ in the tender.
4. I have filled in rates after visiting the site of work personally.
Date: Signature of
NOTES TO THE PRICE BID
1. Above rates shall be inclusive of all taxes/duties/levies etc.
2. Bidders shall have to furnish relevant documents for payment of work contractor tax / service
tax as applicable along with each R.A. Bill.
3. The work shall be executed by successful bidder within the over all tender /work order value.
4. Individual quantities may vary with actual execution of work. The same shall be accepted within
the overall value.
5. The bidder shall have to keep the tender valid for 365 days from the returnable date of the
6. The work shall not be sub let to any other contractor.
7. If any leave is not available and if it is required to lay additional cable in the existing trench by
widening the same trench then the rate for excavating for excavation for laying additional cable
will be considered half the rate of item no.1 of Schedule-B.
SPECIAL INSTRUCTION TO THE TENDERER
1 Tender fee is non refundable.
2 The Tenderers shall have to submit the Tender duly filled in without any additions / alterations,
by R.P.A.D. or Speed Post only. The Tenderers are forbidden from furnishing their own printed /
typed commercial and other terms and conditions.
3 The tenderers shall specifically note that the Tenders are invited on percentage basis only.
4 The Tenderers shall specifically note that the quantities mentioned in the Tender are likely to
vary as per the actual requirement / work involved. As such, the successful Tenderer shall have
to execute the work at the same rates of the order for the changed / increased quantities, if any,
without any extra compensation whatsoever.
5 The Tenderers will ensure submission of the Tenders duly filled in before the due
6 SPECIAL REMARKS-It is compulsory for all bidders to submit their
tender documents and Price-Bid must be filled in Electronic format on
above mentioned website and date shown in tender details before
digitally signing the same .
7 Tendered is not allowed to transfer their offer to other firm who have not purchased the tender
document nor to the firms who have purchased the tender document.
8. Tender should be completely fill up. Incomplete tender will be rejected.
[NOTE: - With tender you are required to submit copy of EMD Receipt, License Copy, Original solvency
Certificate P.F. No., PAN Card No., G.S.T.No., PF Registration No, If you are the lowest than, You have
to pay 5% of Order value SD, Execute the agreement, Indemnity Bond, Sub order may be issue after
complete the above official tender formalities]
SIGNATURE AND EXE. ENGINEER (O&M),
SEAL OF BIDDER. PIPLOD DIVISION
LABOUR LAWS AND SAFETY RULES
E OTHER CONDITION OF SUPPLY:
1. The Company’s General Conditions of contract will apply to all contracts and supplier will be
deemed to be fully aware of the Company’s general conditions of contract for the supply of
plant equipment and materials except the conditions modified in this commercial terms and
conditions and any ignorance of these Conditions, will not exempt supplier from their liability to
abide by the same. Copies are available from the Division Office
2. Although the materials have to be supplied as per ISS and or as per the tender specifications,
Company will take random samples from the materials supplied and subject them to tests
To ISS in approved laboratories. The materials should stand these tests and if the materials do
Stand these tests, they will be summarily rejected and the supplier should make immediate
Arrangement to replace them with standard materials and after getting them duly inspected and
2. If in any company, the interest of any employee of the DGVCL or his relative as defined in
Section VI of the Company’s Act. 1956, is 10% or more, DGVCL will not deal with such
company at all. Tenderer therefore, must specifically disclose this fact in his technical
Bid. Non-disclosure of such facts would disqualify the Tendered for further dealing with
4. JURISDICTION:
All questions, disputes or differences arising under out of or in connection with the Tender /
Contract if concluded shall be subject to the exclusive jurisdiction of the
court under whose jurisdiction the place from which the tender / Acceptance of tender is issued,
is situated i.e. DGVCL,CORPORATE OFFICE; SURAT.
tenderers are submitting their offers with the conditions ; such tenders are not
acceptable by the Company.
5. The Tendered if being an agent, who submits its offer to Company, will have to give information
and declare the name of the principle from which he will procure the materials and supply to
Company along with company’s written confirmation about quality and backup performance
guarantee. Only on getting complete information from Agent, such offer if found suitable shall
be taken in consideration.
6. Company reserves the right to cancel any or all the offers / bids or to accept any offer without
assigning any reasons. Also in case Company finds that there is an attempt of cartel in the
prices, Company reserves the right to consider or reject any or all the parties offers without
assigning any reasons thereof.
7. Company reserves the right to increase or decrease the quantity against each item/s while
placing the order.
8. All the suppliers / manufacturers should possess high quality ISO 9001 / ISO 9002 Certificate
within 2 years. Other things being equal the company possessing the ISO 9001 / ISO
license will be given preference if other requirements match.
9. The tenderers are required to furnish the technical information and the guaranteed technical
particulars (GTP) along with company seal and signature of the Tenderer on each and every
page / papers of the tender documents.
10. All the costs of the stamp papers are to be borne by you as per the Govt. Of India’s latest
guidelines. Definition of “similar type of work” is the criteria regarding satisfactory
performance of works, personnel, establishment, plant, equipment and the execution of work as
per the specification and norms mentioned in work schedule within stipulated time period of
respective work order etc. shall be in corporate according to the requirement of the project.
11. Tenderer should invariably fill up all the details of all the Annexure including the prices in the
Price Bid Annexure of this tender document. This is mandatory. Also all the Annexure should be
duly signed by authorized signatories with their rubber stamp and along with Company’s Rubber
(Round) seal / stamp affixed on each paper.
12. If the Tenderer fails to pay the Security Deposit or defaults in execution of the order placed or if
Company suffers any financial loss due to this, then Company will be at liberty to adjust the
amount from other orders of the same firm or by encashing the Bank Guarantee.
13. LABOUR LAWS:-
Persons below the age of 18 years shall not be employed for the work. No female workers shall
be employed in the night shift between 07.00 P.M. and 6.00 .A.M. next day. Contractor shall
maintain a valid labour license under the Contract Labor (Regulation and abolition) Act for
employing necessary manpower required by him. In the absence of such a licensee, the contract
shall be liable to be terminated without assigning any reason thereof. Contractor should also
employ qualified and experiences persons as per requirement of Electricity Act and rules for
carrying out supply and erection work under this contract.
The Contractor shall at his own expenses comply with all labour laws and keep the DGVCL
indemnified in respect thereof. Some of the major liabilities under various labour and industrial
laws which the Contractor shall comply which are as under: Payment of contribution by way of
Employer’s Contribution towards Provident Fund. Family Pension Scheme Deposit Linked
Insurance Scheme, Administrative charges etc. at the rates made applicable from time to time
by the Government of Gujarat / Government of India or others Statuary / Authority.Payment of
Deposit in respect of each contract labour with the Office of Commissioner of Labour as per the
Contract Lab our ( Regulation and Abolition ) Act .License fee as prescribed under the Contract
Labour ( Regulation and Abolition ) Act and Rules framed there under depending upon the
number of workmen.Paid leave facility and wages as per the provision of the Factories Act., at
the rate of one day forevery 20 days of working. Identify Cards as prescribed under the Factories
Act., with photo affixed thereto for identification.Payment of retrenchment compensation, Notice
Pay and other liabilities as per Industrial Dispute Act., Any payment to the Contractor’s
employee arising out of any claim of dispute under the Industrial Disputes Act,1947 or any other
Labor Laws. Payment of compensation in case of accidental injury.Provision of creche if the
female laborers employees are more then 30.Maternity leave as per the provisions of the
Maternity Benefit Act. The above are some of the major liabilities of the Contractor in addition to
other liabilities prescribed under the various labor laws, in force from time to time, from
Statutory Authorities like State Government / Government of India, which the Contractor shall
have to comply with.
14. PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (Month wise) a Statement regarding deduction
against employees Provident Fund and Family Pension Scheme in respect of each concerned
employees. The contractor’s contribution and the workers’ contribution towards Provident Fund
and Family Pension Scheme shall be done at the rate made applicable by the Government from
time to time and deposited by the contractor with Regional Provident Fund Commissioner
15. DEPOSIT LINKED INSURANCE SCHEME:-
The contractor shall have to deposit 1.2% of the wages in respect of employees who are
members of the Provident Fund as the contribution to the Deposit Linked Insurance Scheme with
Regional Provident Fund Commissioner, SURAT.
16. ADMINISTRATIVE CHARGES:-
Administrative charges for maintaining Provident Fund Account shall be deposited by the
Contactor with Regional Provident Fund Commissioner, SURAT at the rates applicable.
17. PAID LEAVE FACILITY:-
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour
shall be provided by the Contractor to his workers. He shall maintain Leave Records, Leave cards
for individual labourer which shall be duly verified approved and certified by the authorized
Officer of the DGVCL.
18. WORKMEN’S COMPENSATION ACT AND EMPLOYER’S LIABILITY INSURANCE:
The Contractor shall cover all his employees under workmen’s compensation act and under its
liability insurance. The DGVCL shall not be responsible for any payments of compensation to the
workers / supervisor of the contractor for fatal or non fatal accidents during the tendency of the
contract. The contractor shall employee adequate number of qualified and experienced staff at
site for daily supervision and for maintenance of various registers and records rejected under
the law and contract. No payment for supervision shall be admissible. The list of names of such
persons with their qualification and experience should be furnished with the tender.
19. CONTRACTOR TO INDEMNIFY THE DGVCL:-
The Contractor shall indemnify the DGVCL and every officer and employees of the DGVCL
including, Engineer – In-charge and his staff against all actions, proceedings, claims, demands,
cost and expenses whatever, arising out of or in connection with the matter referred herein
above and elsewhere and against all actions, proceedings, claims demands, cost and expenses
which may be made against the DGVCL or Government for or in respect of performance of the
obligation under the contract documents. The DGVCL shall not be liable for or in respect of or in
consequence of any accident or injury to any workman or other person in the employment of the
contractor or his sub-contractor and the contractor shall indemnify and keep indemnified the
DGVCL against all claims, demands, proceedings, cost, charges and expenses whatever in
respect thereof or in relation thereto.
20. WORKMEN’S COMENSATION AND EMPLOYEES LIABILITY INSURANCE:
Insurance shall be affected for all the Contractor’s employees engaged in the performance of
this contract. If any of the work of subject matter, the Contractor shall require the Sub-
Contractor to provide workmen’s employers’ liability insurance for the latter’s employees and
ensure that such employees are covered under the Contractor’s Insurance.
21. WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR:-
The Contractor shall pay minimum wages per day to his Labours / Workers as per rates fixed
under the minimum wages Act. The wages of every Contract Labour employed by him under this
contract shall also be paid by him before the expiry of 7th day from the last day of the month in
respect of which the wages are payable (i.e. wages of a month have to be paid by him in the
first week of the next month).Any default will result in cancellation of contract work with or else
the Contractor shall be punishable to the extent of Rs. 100/- for each day of default.
The Contractor shall give his Addresses, Telephone Number and etc. to the DGVCL, so that, in
case of labour trouble etc. the Contractor can be contacted. The Contractor shall arrange to
have his office within working area and the contractor keep himself present throughout the
The contractor who are having separate P.F. Code No. from RPFC, it should be ensured that all
the contract labourers are covered under the Provident Fund scheme, and employees’ pension
scheme and their contributions are remitted regularly to the concerned Xerox copies of the
challans in this regard be collected from the concerned contractor and kept in the file of the
concern contractor.
22. INCOME –TAX:-
Income-tax at source at the prevailing rate will be deducted from your bill in accordance with
the provision of Income-Tax Law sand to that effect a certificate will be issued to the contractor.
As the material is to be procured by the successful bidder, the contractor shall make its own
arrangement to avoid breakage, losses and wastages of material etc. And no wastage on this
account shall be considered payable by the DGVCL.DGVCL reserve the right to check all the
activities carried out by the successful bidder at each stage or during execution to see that the
work is executed as per the various drawings, standards, norms, rules and the regulations of the
24. PRESENTATION OF BILLS:-
The contractor may note that no payment shall be released for the additional quality supplied
which is not required for completion of line. The Contractor has to submit the final bill along with
the material consumption statement along with other required datas of the work carried within
months from the date of completion of work.For non-submission of part submission of above
information, no bills shall be processed.
25. WAY LEAVE /ACCESS TO LOCATION / RIGHT OF WAY:-
DGVCL will arrange to get the permission from various government agenciesfor carrying out
the underground cable laying work i.e. SMC/B&C/ Forest etc. The successful bidder shall have to
cut tree branches/tree at his cost.It will be the contractor’s sole responsibility to take the
materials up to the location. Any path way, temporary road, temporary bridge required will
have to be provided by the contractor at his cost. If for any reasons, the above is not feasible,
the contractor at his own cost shall have to arrange transportation by head loads. The
contractor will be deemed to be very well familiar with the route of the Distribution line before
giving the offer. Not withstanding the difficulties of terrain location approaches way leave and
other obstructions the price quoted for all the items of erection I the Schedule of Section shall
not undergo or any change at any stage or granted by DGVCL for any special rates /
26. The enclosed List of Annexure and Documents should be invariably submitted along with the
1) Technical Bid should be submitted separately with all Annexure and all relevant papers
as asked in tender. On envelope mention “TECHNICAL BID ONLY”. Mentioning the
2) Schedule–“B” Price Bid to be submitted in the Separate Price Bid cover super scribed
“PRICE BID COVER ONLY” mentioning the TENDER NO.
3) Technical Specifications with Guaranteed Technical Particulars.
All the above documents should be duly filled in, signed & stamped with company’s seal
should be submitted along with the Technical Bids and Schedule–“B” to be kept in the
third big cover.
27. Please note that any additional conditions / deviations, if any, found in the Commercial terms &
conditions then the Price Bids of such tenderers will not be opened and no further
correspondences in the matter will be allowed.
28. All the tenderers must ensure that all the relevant documents / papers submitted with the
tender should be serially numbered, properly bounded / tied together and properly documented.
This must be adhered to.
29. All the above points should be complied by the Tenderers. If not, tenders are likely to be ignored
without making any further reference.
Signature of Contractor EXECUTIVE ENGINEER
DGVCL, PIPLOD DIVISION
TENDER SPECIFICATIONS
F. COMMERCIAL TERMS & CONDITION Tender for ARC to release connection and
rectification work with other activities as mentioned in sch-B for any scheme or
various scheme in VADOD & BAMROLI AND ANY SUB-DIVISION under PIPLOD
TENDER SPECIFICATIONS:
All technical specification should be ISS/ISI/BIS. Specification framed out by the Company is
separately brought out in the tender documents. No deviation in specification shall be allowed
and Company’s decision shall be final. The Company also desires that all the suppliers should
possess high quality ISO 9001 / ISO 9002 certificate within 2 years from 1/1/2001 and other
things being equal, suppliers who possess ISO 9001 / ISO 9002 certificate will be given
preference in quantity distribution. The technical scrutiny committee of the Company shall
evaluate the techno-commercial view of the tender. Tender should be in two bids.
a) Techno – Commercial Bid and b) Price Bid.
LATE / DELYAED TENDER SHALL NOT BE CONSIDERED.
1. Incomplete bids and amendments and additions to bids after opening of the bids will be ignored
out rightly.The price bid of those who are techno-commercially qualified shall be opened. After
technical bid is opened, for modification, if any, all shall be given equal chance.
2. The Tenderer must give in his offer, the full name and address with phone, Fax & mobile
Representative who has been authorized by the Tenderer to do work with the Corporation on
3. The tenderers should invariably write the name and address of the Company, both on sealed
covers of EMD, Technical & Price Bids. Otherwise the tender covers without the name and
address will not be opened which may please be noted.
THE TENDER SHOULD BE SENT ONLINE ONLY IN https://tender.nprocure.com
(NO COURIER SERVICE WILL BE ACCEPTED). Hand delivery of tenders will not be accepted.
Bidders submitting their offers with the any conditions; such tenders are not acceptable by
4 DELAYED AND LATE TENDERS: No tender shall be accepted/opened in any case which are
received after due date and time of the receipt of tender irrespective of delay due to postal services or
any other reasons and company shall not assume any responsibility for late receipt of tender. any
correspondence in this matter will not be entertained.
Tender fee (Non-refundable) plus GST as applicable notified in the tender notice should invariably be
paid by way of Demand Draft/ Bankers Cheque; otherwise offer will be ignored out rightly. Indian Postal
Orders (IPO’s) & Cheques are not acceptable. Demand Draft/ Bankers Cheque should be in the “Name
of Company.”, Payable at_______.
The Tender Fees is Non-refundable under normal circumstances. However, if purchaser company
decides to scrap/ cancel the tender, by one or another reason, in which bidders are not responsible for
cancellation/ scrap of tender, in such case tender fee may be refunded to bidder(s), at sole discretion of
the purchaser company.
6. EARNEST MONEY DEPOSIT:
E.M.D. at the rate of 1% of the value of the Tender is payable. The EMD is payable by
Demand Draft in favour of The Dakshin Gujarat Vij Company Ltd. Drawn on any Scheduled /
Nationalized Banks payable at Surat. It can also be furnished by way of an irrecoverable Bank
Guarantee from any nationalized Bank in a standard format prescribed by DGVCL
If the amount of EMD exceeds Rs. 1 Lac(One lacks), then 50% of the EMD should be paid in by
D.D. in favour of DGVCL and balance 50% by Bank guarantee in standard format prescribed by
DGVCL OR 100% DD from any nationalized/scheduled Bank. Cheque is not acceptable,
CORPORATE BANK GUARANTEES NOT ALLOWED.
7. SECURITY DEPOSIT:
Security Deposit should be paid within one week after receipt of the order. The successful
tenderers will be required to pay an amount equivalent to 5 % of the value of the order as a
Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable
in Cash / D.D./Bank guarantee of any nationalized or Schedule Bank. If the full Security Deposit
amount is not paid within one week after the receipt of the order, then the order will be out
rightly cancelled at the risk & cost of the Tenderer (at the discretion of the Company) and
without entering into any correspondences and this will be binding to the Tenderer. Security
Deposit will be refunded only after receipt of NOC from DE of the Sub-division.
1. 8. PRICES: Prices quoted should be FIRM and inclusive of all taxes. The above rates are
as per the prevailing SOR of the company ansd as and when any changes made by
government. It will be applicable as per the rule.
2. DUE TO IMPLEMENTATION OF GST, IT IS COMPULSORY TO SUBMIT ALL THE RELEVANT
DOCUMENTS SUCH AS GSTIN,HSN CODE AND SAC CODE
VALIDITY OF THE OFFER:
The offer will have to be kept valid for a period of 365 days from the date of opening of technical
bids. In case of finalization of the tender is likely to be delayed, the tenderer’s will be asked to
extend the same without change in the prices or any terms and conditions of the offer. If any
change is made, original or during the extended validity period, the offer will be liable for
outright rejection without entering into further correspondence in this regard and no reference
will also be made.
9. PRICE EVALUATION:
b) No price preference shall be given on any account. All Tenders shall be evaluated on firm
Price End Cost (with GST and Cess as applicable) basis unless otherwise mentioned in the
Tender documents.
c) If the Tender is invited with Total Owning Cost (TOC) Clause, the evaluation shall be done
accordingly. For the same, the Bidders have to give the detailed breakup of the End Cost.
11. QUANTITIES:-
The quantities mentioned in the schedule attached herewith are tentative and to be procured /
executed by the successful contractor at the same rates accepted by the DGVCL in various A/T
and all the terms and conditions of the order. However payment shall be made only for the
actual quantities utilized / executed to complete the work.
12. PAYMENT TERMS:
Payment shall be made by the Division Office on completion of the job and production of work
completion certificate of the Division / Sub – Division Office in charge, after following the
procedures of D.G.V.C.L.R. A. Bill will be passed as per Company’s Rules and Regulation. The
payment will be release within 30 days from the date of receipt of bill without any query to the
account section. Running bills may be paid on the works carried out after measurements are
recorded up to 80 % and on submission of material account by the contractor. Final bill for the
contract will be paid after completion of work recording measurement and after submission of
materials account by the contractor.
13. REPEAT/ADDITIONAL ORDERS:
The Company reserves the right to place repeat orders / additional orders on the successful
tendered up to 50% of the original quantity of the A/T at the same prices terms and conditions
stipulated in the original order mutually agreed upon.
15. COMPLETION PERIOD:-
The Tenderer should agree activity wise time bound programme for completion of supply and
erection work in all respect as per terms and conditions of tender specifications.
The Tenderer shall confirm that on placement of order, the work will be commenced, executed
and competed as per schedule given by DGVCL Corporate Office/ Circle Office only.
16. POST TENDER CORRESPONDENCE / INQUIRIES:
Any correspondence or enquiry subsequent to opening of Technical and Commercial bids is not
desirable, if the same is indulged into, it will be considered for disqualifying the tender. The
Tenderer will be required to abstain from pursuing / canvassing the matter, directly or indirectly
with any Officers of the Company, otherwise the same would also amount to disqualification of
17. The purchaser (i.e. Company) shall have the right to make any changes, additions / deletions or
modifications in any terms / conditions of the tender and / or specifications as may be deemed
necessary by the Corporation at its sole discretion at any time before the due date of opening of
18. Tenderer should furnish a list of orders for similar works executed by them indicating the name
of the party and their order reference to which they have worked to be furnished. Failure to do
this will result on suppliers tender being rejected without any reference. In case of bought out
items, they should furnish the back up guarantee from their principals.
19. Company does not accept the printed conditions of any Tenderer. It will be ignored without any
reference; hence tenderers should withdraw such printed conditions if they have any.
20. The materials should be offered strictly confirming to ISS / BIS / Tender specifications given in
the tender. If the tenderer desires to quote with any technical deviations, they should
specifically quote the deviation & the ISS or BIS Nos. in the body of the tender itself under the
respective Annexure of this tender document. If technical deviations furnished by the Tenderer
are not agreeable to the Company, the offers may be ignored. However it will be solely at
Company’s discretion to consider the technical deviations OR not for considering the Tender. No
correspondence with the Tenderer after opening of the bid will be entertained in this matter.
21. Revision of prices or any commercial terms affecting the price after opening of technical bids
shall not be considered and will be ignored.
22. Please give suitable declarations as under: I / We declare that we are Authorized Distributor OR
Dealer for all the tendered items.
23. Tenderer should specifically mention in the offers and should indicate in Block letters the name
of the Partners / Proprietor / Directors who is / are the signing authority.
If the goods, stores and equipments found defective due to bad design or workmanship,
the same should be replaced by you free of charge if reported within 24 months of their
installation at site. You will be responsible for the proper performance of the equipments /
materials for the respective guarantee period.
Signature of Contractor EXECUTIVE ENGINEER
DGVCL PIPLOD DIVISION.
SAFETY RULES APPLICABLE TO WORK CONTRACTS
1 The contractor shall invariably obtain LINE CLEAR PERMIT through concern in-charge Engineer
through supervising department’s engineer and shall observe all rules and Regulations. The
contractor shall provide to his laborer all the equipments / accessories necessary for safe
execution of work.
2 Only trained and experienced persons should be employed for working. Particularly in places
where the working environment is hazardous, it is a must.
3 The contractor shall employ such Supervisor(s) who have good understanding and experience of
the job entrusted to him. The supervisor must be familiar with the associated risks and he will
remain present to guide the workers regarding safe execution of work.
4 Contractor shall use 24 volts lamps for lighting purpose, which are having grill around it
(insulated handle in case of hand lamp) wherever required.
5 Safe working environment to workers will be provided and maintained by contractor e.g.
(1) In confined spaces provision of fresh air during welding / cutting operations,
(2) In coal Handling Area, Contractor must provide respirator and Breathing equipments to
their workers. Wherever require, Helmet, Safety shoes, Goggles etc must also be
(3) In chlorination plant, breathing equipment must be provided.
6 All amendments coming in force in Factories Act, State Factory Rules must be strictly followed
from the date of enforcement.
Name of Work:- Tender for ARC to release connection and rectification work with
other activities as mentioned in sch-B for any scheme or various scheme in VADOD
& BAMROLI AND ANY SUB-DIVISION under PIPLOD Division.
Technical Conditions of Contract.
Description of Work: - Tender for ARC to release connection and rectification
work with other activities as mentioned in sch-B for any scheme or various scheme
in VADOD & BAMROLI AND ANY SUB-DIVISION under PIPLOD Division.
Signature of Contractor EXECUTIVE ENGINEER
DGVCL, PIPLOD DIVISION,
SPECIAL TERMS AND CONDITIONS:
1. The work is to be executed in the area of DGVCL in all respect as per the instructions of
Engineer-in-charge by arranging all required materials tools, tackles equipment including
labours, transportation etc. DGVCL will not pay anything extra on this account.
2 The DGVCL reserves the rights of retrenching and dismissing any person employed for the work
if there is complaint against his misbehavior, misconduct or disloyalty towards job.
3 Terms and conditions regarding industrial laws and other related matters shall be complied by
the contractor in all respect.
4 No part of the contract nor any share of interest there in shall in any manner of degree be
transferred/assigned or subject by the contractor directly or indirectly to any person/firm or
Corporation whatsoever.
5 The contractor shall ensure that all persons are provided with the safety tools, shoes, etc. as
may be required from safety point of view and all his persons shall follow the instructions issued
by the DGVCL from time to time related with the safety and security to carry out the work.
6 DGVCL shall not be liable for any damages or compensation for any injury or for any accident
occurred to any person engaged by the contractor. The contractor shall keep the DGVCL
indemnified thereof.
7 The contractor shall be liable for making good all damages/losses arising out of workmanship,
breakages, pilferage, etc. to the DGVCL.
8 Contract period:
1) The contract period will be
2) six Months from the date of issue of the Order. However if required, the period of order may
be extended for further six months.
3) If during the contract period, execution of work is not found satisfactory in any respect, job
will be got executed through other agency at the risk and cost of the contractor. DGVCL
reserves the right to terminate your order without assigning any reason.
9 The rates agreed herein shall remain firm till the expiry of contract. The contractor shall not be
entitled to any
increase or revision (Statutory or otherwise) or any other right or claim. What so ever by way of
representation, explanation statement or any undertaking or promise given or alleged to have
given by any employee of the company or due to contractor’s own ignorance on account of any
difficulties or hardships faced by him. The rates as such are all inclusive of all.
10 The rates should be quoted in percentage in enclosed schedule only, both in words and in figures,
as specified therein. In case of any discrepancy between the rates/amount quoted in words &
figure, the rates/amount most favorable to the DGVCL shall be considered.
11 Conditional tender will not be accepted and likely to be rejected.
12 The DGVCL do not bind them selves to accept lowest or any tender.
13 The DGVCL reserves all rights to accept or reject any or all tenders without assigning any reason.
The terms and conditions stated above are carefully read by me/us and are acceptable to me/us.
14 The quantity given in Schedule ‘B’ is approximate. There will be increase or decrease in the
quantities. Please note that within the estimated cost quantities of item may very as per the
requirement of the Board. In such event, payment will be made on the basis of actual quantities
executed. For making any change in the quantities, the C.E (SD&P), DGVCL, SURAT is only
Successful bidder shall submit monthly report for work executed by them giving details of
Name of s/s, Name of feeder, type of kit used ,date of providing kit, sub order no. etc. utilized by
them to the C.E (SD&P), DGVCL, SURAT
Signature of Contractor EXECUTIVE ENGINEER (O&M)
DGVCL, PIPLOD DIVISION,
Sub: - : Tender for ARC to release connection and rectification work with other
activities as mentioned in sch-B for any scheme or various scheme in VADOD &
BAMROLI AND ANY SUB-DIVISION under PIPLOD Division.
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the undersigned have read and examined the Tender Specifications in tender mentioned
under reference along with the Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender specifications (except the
deviations shown in Annexure of Technical Deviations as per clause no.22 of this tender
3. Further, I / We also agree that additional conditions / deviations, if any, found in the Commercial
terms & conditions (except reference under clause no.22 of this tender document), our offer
shall be out rightly rejected without assigning any reason thereof.
Signature of Contractor EXECUTIVE ENGINEER (O&M)
DGVCL, PIPLOD DIVISION,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Meter Replacement Vadod Bamroli sdn.pdf
(2) Tender general terms and condition.pdf
(4) Sch-B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .