Loading…
Loading…
Tender Value
₹14.7 L
EMD Value
₹15,000
Closing Date
20 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Rajkot Irrigation Project Division Rajkot.
Repairing of Upstream & Downstream Training wall of Motisar Irrigation Scheme
283588
RIPD 23 of 2025-26
Open
Civil - All
Rajkot
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer Rajkot Irrigation Project Division Rajkot.
₹15,000
Yes
6 Mar 2026
6 Mar 2026
6 Mar 2026
20 Mar 2026
6 Mar 2026
BILL OF QUANTITIES (SCHEDULE - B)
Item Description of Item Quantity Unit Estimated Rate Rs. In Figures. Amount
No. (with brief specification and reference to book of specifications)
Rs. In Rs. In Words
1 Cement pointing in C.M.1:3 to stone masonry after racking out joints 20mm deep incl
(Rupees One Hundred
scaffolding watering and curing etc complete. 782.00 Sq.mt 137.00
Thirty Seven Only)
a) UPTO 6.0 Mt HEIGHT
2 Providing and fixing in position I.R.C. Fabrics of mesh 6"x6" & 10 gauge,
(Rupees Two Hundred
reinforcement with necessary nailing in position, overlap etc as directed with all lead 980.00 Sq.mt 283.00
Eighty Three Only)
and lift etc complete.
૩ Providing 40 mm thick guniting in cement mortar (1:2) for spillway works by using
guniting equipment and air compressor and accessories incl finishing,curing etc (Rupees Six Hundred
complete with cost of material and labours but excluding cost of IRC fabric
reinforcement with all lead and lifts.
4 Dewatering of foundation area, pits, &trenches of head works and allied works with
(Rupees Twenty Seven
diesel or electrical pumping arrangement incl. Cost of pipe line, others materials , 4051.00 Hp/Hr 27.00
labours etc complete as directed with all lifts.
5 Earth work in embankment from borrow pits in all sorts of soil and soft murrum
including spreading, breaking clods dressing to the design section with lead as
(Rupees Seventy Eight
under and all lift incl. site clearance etc comp. for all canal capacity & without rolling 855.00 Cum 78.00
6 Extra lead charges for transporting the borrow area/excavated usable materials for
earthen dam beyond the basic lead of 1.0 km up to 5.0km for each additional km or (Rupees Eighty Seven
part there of inclusive of all lift etc. complete. For additional 5.00km lead 5.00-1.00 = and Twenty paisa Only)
7 Providing Murrum including spreading the same and dressing the side slope &top (Rupees One Hundred
surface in required grade and camber with lead upto 1.0 km etc.complete Sixty Six Only)
Item Description of Item Quantity Unit Estimated Rate Rs. In Figures. Amount
No. (with brief specification and reference to book of specifications)
Rs. In Rs. In Words
8 Providing & Laying in position controlled cement concrete using cement sand &
crushed metal aggregate by machine mix incl. necessary formworks compaction by
(Rupees Four Thousand
mechanical vibratoer curing as directed with all lead and lift etc complete. Excluding
25.00 Cum 4673.00 Six Hundred Seventy
the cost of steel.
(i) For bucket and end sill etc
A) Concrete grade M-20 and MSA-40mm(Graded)
9 Preparation of spillway and allied works foundations incl. removal of loose
weathered material incl. hard rock by wedging, chiseling with all labours,tools and (Rupees Eight and Ninty
materials for cleaning the foundations with compressed air and water jetting as Paisa Only)
required etc complete.
10 Epoxy bonding of new concrete Or mortar to old surface in structure with proper
application of coat of resin and hardener in proportion of 2:1 by weight confirming to (Rupees Two Hundred
IS-9197 to give proper bond between old surface new concrete Or mortar etc One Only)
(Rupees Fourteen Lakh Sixty Nine Thousand Eight Hundred Thirty Two Only)
I/We/ am/are willing to carry out the work at ---------------------- % Below / Above ………….. % ( should be written in figures and words) of the
estimated rates mentioned above amount of my / our tender works out as under
Estimated Amount Estimated Amount
Put to tender Rs……………….. Put to tender Rs………………..
Deduct …….. % Below Rs…………. Add …….. % Above Rs………….
Net Rs………… Total Rs…………
( Please strike out whichever is not applicable)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
Signature of Contractor Executive Engineer
Rajkot Irrigation Project Div.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. ONLINE_NOTICE.pdf
2.SBD Rep. U S and D D of Motisar Dam Training Wall PART-1.pdf
3.SBD Rep U S and D D of Motisar Dam Training Wall PART-2.pdf
4.SCHEDULE B GUNITING.pdf
Download all tender documents and submit your bid