| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹941.92Accepted-AOC | ₹941.92 Quoted ₹9.4 Cr | L1 | Accepted-AOC BID IS RESPONSIVE |
| 2 | L2₹9.5 CrRejected-Finance | ₹9.5 Cr | L2 | Rejected-Finance BID IS NON RESPONSIVE |
| Sl No | Description | Qty | Unit | PANWAR CONSTRUCTION AND ASSOCIATES L2 | BETAL SINGH KUMAIN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in hill road (hill side cutting):- Excavation in hilly area for construction of road in all types of soils, rocks & E&B etc. As met at site true to lines as per plan, L section cross slope, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lift & lead, required for safe disposal of surplus excavated material at suitable dumping places indicated in the drawing by mechanical means/ manual means and including construction of required coolie walling of minimum height of 0.60 mt with the stone available from the required hill side cutting for retaining of the muck , without damaging forest , forest land , utility and private properties ,including slip clearance and its safe disposal (same as per mentioned above for safe disposal of surplus excavated material ), till the completion of the work as per part II special conditions of contract , MORD Specification Clause 1601, 1602 & 1603 and as directed by Engineer-in-charge. | 1 | LS.Job. | 26,00,000 ₹30,68,000 | 22,00,000 ₹25,96,000 Lowest |
| 2.00 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (for Deeper Portion) | 690.26 | cum | 63.9 ₹52,046.98 | 63 ₹51,313.93 Lowest |
| 3.00 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(For Super Elevation) | 2,103.72 | cum | 120.7 ₹2,99,624.42 | 120 ₹2,97,886.75 Lowest |
| 4.00 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (For Patri Filling) | 2,083.78 | cum | 63.9 ₹1,57,121.18 | 63 ₹1,54,908.21 Lowest |
| 5.00 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) | 767.11 | cum | 1,542.4 ₹13,96,164.74 | 1,542 ₹13,95,802.67 Lowest |
| 6.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 3,678.46 | cum | 417.2 ₹18,10,891.14 | 417 ₹18,10,023.03 Lowest |
| 7.00 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications) | 2,958.55 | cum | 2,304.8 ₹80,46,261.93 | 2,304 ₹80,43,469.06 Lowest |
| 8.00 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 2,435.96 | cum | 4,463.5 ₹1,28,30,030.8 | 4,463 ₹1,28,28,593.59 Lowest |
| 9.00 | HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work. | 572.97 | cum | 1,060.1 ₹7,16,738.49 | 1,060 ₹7,16,670.88 Lowest |
| 10.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 294.35 | cum | 3,995.9 ₹13,87,907.94 | 3,995 ₹13,87,595.34 Lowest |
Tender Value
₹9.5 Cr
EMD Value
₹19.0 L
Closing Date
27 Feb 2026, 1:00 pmClosed
CE URRDA
Uttarakhand Rural Roads Development Agency, First Floor, Directorate of Panchayati Raj, Opp-IT Park, Sahashtradhara Road, Dehradun- 248001
UT114695 L031-Silethi Panwar Gaon MR Stage-I and II
2026_CCUK_146626_1
UT114695
National Competitive Bid
Civil Works - Roads
Item Rate
456 days
Kirtinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹19.0 L
Srinagar Garhwal
20 Aug 2026
9 Feb 2026
27 Feb 2026
9 Feb 2026
27 Feb 2026
17 Feb 2026
13 Feb 2026
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.03 MB
SBDUT114695.pdf
Tender Documents • 8.11 MB
BOQ_227076.xls
BOQ • 0.44 MB
DWGUT114695.pdf
Additional Documents • 10.73 MB
corrigendum06.pdf
PDF • 0.21 MB
Corrigendum03.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].