Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC | ₹21.1 L Quoted ₹21.3 L | L1 | Accepted-AOC BEING LOWEST BIDDER |
| 2 | L2₹22.2 LRejected-Finance | ₹22.2 L | L2 | Rejected-Finance OTHER THAN BEING LOWEST BIDDER |
| 3 | L3₹24.4 LRejected-Finance | ₹24.4 L | L3 | Rejected-Finance OTHER THAN BEING LOWEST BIDDER |
| 4 | L4₹25.7 LRejected-Finance MINISTRY OF DEFENCE MES JALPAIGURI WEST BENGAL | ₹25.7 L | L4 | Rejected-Finance OTHER THAN BEING LOWEST BIDDER |
| Sl No | Description | Qty | Unit | SAMIR KUMAR MITRA L1 | NARAYAN MAJUMDER L4 | M/S S N ENTERPRISE L3 | M/S Pradeep Enterprise L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | PART-I : (B/R WORKS)
Taking down chowkats with shutters (without taking off shutter from the frames) not exceeding 1.50 Sqm each complete all as specified and directed. | 6 | EACH | 240 ₹1,440 | 70 ₹420 | 235 ₹1,410 | 100 ₹600 |
| 2.00 | Taking down chowkats with shutters (without taking off shutter from the frames) exceeding 1.50 Sqm but not exceeding 4.00 Sqm each complete all as specified and directed.
(Note for Item No. 1.00 & 2.00 - Rate shall be deemed to be include for cutting holes/demolition of masionry walls etc for taking down chowkats and making good the damaged surfaces). | 19 | EACH | 380 ₹7,220 | 140 ₹2,660 | 314 ₹5,966 | 110 ₹2,090 |
| 3.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillar etc complete all as specified and directed. | 2.58 | CUM | 720 ₹1,857.6 | 400 ₹1,032 | 1,288 ₹3,323.04 | 500 ₹1,290 |
| 4.00 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 10.83 | CUM | 800 ₹8,664 | 420 ₹4,548.6 | 1,280 ₹13,862.4 | 550 ₹5,956.5 |
| 5.00 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of roofs, floors (other than ground floors), beams, stair cases, landing, chajja and similar suspended work complete all as specified and directed . | 1.7 | CUM | 1,350 ₹2,295 | 400 ₹680 | 2,355 ₹4,003.5 | 550 ₹935 |
| 6.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 209 | SQM | 52 ₹10,868 | 40 ₹8,360 | 82 ₹17,138 | 50 ₹10,450 |
| 7.00 | Taking down cement plaster of any description on brick or stone or concrete surface of wall & celing etc including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 460 | SQM | 24 ₹11,040 | 20 ₹9,200 | 75 ₹34,500 | 25 ₹11,500 |
| 8.00 | Dismantling wrought iron or mild steel work of any description etc complete all as specified and directed. | 2.5 | QTL | 320 ₹800 | 600 ₹1,500 | 451 ₹1,127.5 | 650 ₹1,625 |
| 9.00 | Removing building materials and debris (other than excavated earth) to a distance of 5 KM inside MD Land at locations specified including loading and dumping/ levelling at the destination complete all as specified and as directed. | 2 | PER LOAD (MT) | 2,000 ₹4,000 | 1,500 ₹3,000 | 208 ₹416 | 1,000 ₹2,000 |
| 10.00 | Taking down eaves gutters and rainwater pipes CI/PVC/AC soil pipe including all fittings, heads, shoes, bends, swan-necks, etc. (measured overall as fixed along the centre line over fittings and accessories) complete all as specified and directed. | 25 | RM | 42 ₹1,050 | 15 ₹375 | 40 ₹1,000 | 45 ₹1,125 |
Tender Value
₹31.1 L
EMD Value
₹62,120
Closing Date
27 May 2026, 6:00 pmClosed
CWE BINNAGURI
HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232
PROVN OF 01 X COVERED VEH PARKING WITH OVERHEAD SHED FOR 24 X MD ACCN (BLOCK NO 4/H/4) AT SUJIT VIHAR, SPL REP OF 03 X MD ACCN (BLOCK NO 4/N/1) QTR NO 26 TO 28 AT SIJIT VIHAR OF 311 FD WKSP EME AND PROVN OF IRON GATE WITH CEMENTED PILLAR NEAR GUN PA
2026_MES_762769_1
8363/E8
Open Tender
Civil Works
180 days
GE SOUTH BINNAGURI
AS PER NIT
8 documents required · 8 mandatory
₹500
GE SOUTH BINNAGURI
₹62,120
Yes
30 Jun 2026
29 Apr 2026
29 May 2026
29 Apr 2026
27 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-I : (B/R WORKS)
Taking down chowkats with shutters (without taking off shutter from the frames) not exceeding 1.50 Sqm each complete all as specified and directed. | 6 | EACH | 1 | ₹6 |
| 2 | Taking down chowkats with shutters (without taking off shutter from the frames) exceeding 1.50 Sqm but not exceeding 4.00 Sqm each complete all as specified and directed.
(Note for Item No. 1.00 & 2.00 - Rate shall be deemed to be include for cutting holes/demolition of masionry walls etc for taking down chowkats and making good the damaged surfaces). | 19 | EACH | 1 | ₹19 |
| 3 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillar etc complete all as specified and directed. | 2.58 | CUM | 1 | ₹2.58 |
| 4 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 10.83 | CUM | 1 | ₹10.83 |
| 5 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of roofs, floors (other than ground floors), beams, stair cases, landing, chajja and similar suspended work complete all as specified and directed . | 1.7 | CUM | 1 | ₹1.7 |
| 6 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 209 | SQM | 1 | ₹209 |
| 7 | Taking down cement plaster of any description on brick or stone or concrete surface of wall & celing etc including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 460 | SQM | 1 | ₹460 |
| 8 | Dismantling wrought iron or mild steel work of any description etc complete all as specified and directed. | 2.5 | QTL | 1 | ₹2.5 |
| 9 | Removing building materials and debris (other than excavated earth) to a distance of 5 KM inside MD Land at locations specified including loading and dumping/ levelling at the destination complete all as specified and as directed. | 2 | PER LOAD (MT) | 1 | ₹2 |
| 10 | Taking down eaves gutters and rainwater pipes CI/PVC/AC soil pipe including all fittings, heads, shoes, bends, swan-necks, etc. (measured overall as fixed along the centre line over fittings and accessories) complete all as specified and directed. | 25 | RM | 1 | ₹25 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
8363TENDERDOCUMNETS.pdf
Tender Documents • 1.48 MB
BOQ_854423.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid