Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Lowest quoted bidder |
| 2 | L2₹4.7 LRejected-AOC | ₹4.7 L | L2 | Rejected-AOC High rate |
| Sl No | Description | Qty | Unit | MUJEEB RAHMAN K L1 | C T KUNHOYI L2 |
|---|---|---|---|---|---|
| 1.00SIDEKETTU | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 62.5 | hour | 317.3 ₹19,831.25 | 350.7 ₹21,918.75 |
| 1.00 | OD501807/2025-2026:60.1.1. RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using
empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle
clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the
work etc. complete. | 7 | metre | 1,760 ₹12,320 | 1,961.8 ₹13,732.60 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.65 | cum | 330.3 ₹4,178.30 | 365.1 ₹4,618.52 |
| 1.00 | OD498214/2025-2026:(Item 60.7.1) DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 47.15 | cum | 3,668 ₹1.7 L | 4,053.2 ₹1.9 L |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 9.2 | sqm | 655 ₹6,026 | 723.8 ₹6,658.96 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.15 | cum | 7,286 ₹8,378.90 | 8,051.6 ₹9,259.34 |
| 2.00steps | |||||
| 2.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 40.25 | cum | 330.3 ₹13,294.58 | 365.1 ₹14,695.28 |
| 2.00 | OD498295/2025-2026:(Item 60.7.1) DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 37.55 | cum | 3,668 ₹1.4 L | 4,053.2 ₹1.5 L |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹10,589
Closing Date
7 Mar 2026, 11:00 amClosed
SAFEEDA NP
Office of AE, LID - EW, Mukkam municipality
Annual Plan-Pro.555/25-26 KUTTIPAYIKADAV SIDE KETT IN DIVISION 17 - MUKKAM MUNICIPALITY -General Civil Work
2026_LSGD_842062_3
28/2025-26/AE/LIDEW/MKM
Open Tender
Civil Works - Others
180 days
Mukkam municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,589
Yes
3 May 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
7 Mar 2026
28 Feb 2026
SIDEKETTU
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD501807/2025-2026:60.1.1. RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD498214/2025-2026:(Item 60.7.1) DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
steps
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD498295/2025-2026:(Item 60.7.1) DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.44 MB
BOQ_1420428.xls
BOQ • 0.30 MB
PREAGREEMENT.pdf
Tender Documents • 0.26 MB
SBD.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid