Sunil Pevekar
MES DEPT ROOM NO 25 ADMIN BUILD RCF LTD CHEMBUR MUMBAI-400074
Dismantling, fabrication, erection and commissioning of Urea ET-4, ET-7 and ANP ET- 7 conveyor systems in Bagging plant of RCF Tromaby Unit.
2020_RCFL_560213_1
ET - MES/238/L/2021/063
Open Tender
Miscellaneous Services
Item Rate
730 days
MES DEPT ROOM NO 25 ADMIN
AS PER NIT
12 documents required · 12 mandatory
₹0
₹20,000
Yes
30 Jul 2020
20 May 2020
3 Jun 2020
20 May 2020
3 Jun 2020
20 May 2020
Amount
JOB I) - Dismantling, Fabrication, Erection & Commissioning Of ET- 4 Conveyor System Of Urea Bagging Plant In Trombay Unit Of RCF.
Dismantling /Removal of old conveyor structure , frames, rollers, G/B & Motor Foundation, ducts etc of Urea ET-4 as per scope of work
Fabrication, erection and commissioning of conveyor structure, Gearbox & Motor foundation, Head, Tail &Take up pulley structure, transfer chutes of Urea ET- 4 conveyor as per scope of work.
Installation of Head Pulley, Tail pulley, bend pulleys (2 Nos), Take-up Pulley, Snub pulleys (2 Nos), troughing & return frames (90 & 30 respectively) and rollers, Gear box with motor, and load cells etc. of Urea ET-4 conveyor as per scope of work. (Supply & installation of 16 nos. anchor fasteners, size M-16 is in Party scope)
Fabrication & erection of hand railing & toe guard for Urea ET-4 Conveyor
JOB II) Dismantling, Fabrication, Erection & Commissioning Of ET- 7 Conveyor System Of Urea Bagging Plant In Trombay Unit Of RCF.
Dismantling /Removal of old conveyor structure , frames, rollers, G/B & Motor Foundation, ducts etc of Urea ET-7 as per scope of work
Fabrication, erection and commissioning of conveyor structure, Gearbox & Motor foundation, Head, Tail &Take up pulley structure, transfer chutes of Urea ET- 7 conveyor as per scope of work.
Installation of Head Pulley, Tail pulley, bend pulleys (2 Nos), Take-up Pulley, Snub pulleys (2 Nos), troughing & return frames (90 & 30 respectively) and rollers, Gear box with motor, and load cells etc. of Urea ET-7 conveyor as per scope of work. (Supply & installation of 16 nos. anchor fasteners, size M-16 is in Party scope)
Fabrication & erection of hand railing & toe guard for Urea ET-7 Conveyor
JOB III) Dismantling, Fabrication, Erection & Commissioning Of Approximately 30 Meter Conveyor Stringer & Tail Pulley Structure With Discharge Chute Of ANP ET -7 In ANP Bagging Plant, Trombay Unit Of RCF.
Conveyor Dismantling /Removal of old conveyor structure , frames, rollers, ducts etc. of ANP ET-7 as per scope of work
Fabrication, erection and commissioning of conveyor structure, Tail pulley structure, transfer chutes of ANP ET- 7 conveyor as per scope of work.
Installation of Tail pulley, Snub pulleys, Troughing & return frames (30 & 10 respectively) and rollers etc. of ANP ET-7 conveyor as per scope of work. (Supply & installation of 16 nos. anchor fasteners, size M-16 is in Party scope)
Fabrication & erection of hand railing & toe guard for ANP ET-7 Conveyor
Balaji Engineering Works
Jyotsna Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .