Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹1.1 Cr+₹38,824.16 (0.36%)Rejected-Finance GRAM PO KUNWALI TEHSIL RANIKHET DISTRICT ALMORA | ALMORA | UTTARAKHAND | 263601 | ₹1.1 Cr+₹38,824.16 (0.36%) | L2 | Rejected-Finance rejected being to be 2nd lowest |
| 3 | Not Admitted-Fee/PreQual/Technical SOMESHWAR DISTRICT ALMORA | ALMORA | UTTARAKHAND | 263601 | - | - | Not Admitted-Fee/PreQual/Technical Others-hard copy not submitted by bidder |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
6 Feb 2023, 5:00 pmClosed
GENERAL MANAGER CONSTRUCTION WING UKPJN HALDWANI
Office of the General Manager (kumaon), Nirman Wing Uttarakhand Peyjal Nigam, Haldwani.
CONSTRUCTION OF BOUNDARY WALL AT GOVERNMENT P.G. COLLEGE RANIKHET DISTRICT ALMORA
2023_MDPEY_53980_1
135/NIVIDA ANUBANDH RANIKHET/15 DATED 16/01/2023
Open Tender
Civil Works
Item Rate
240 days
RANIKHET
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹4,720
PM CONSTRUCTION UNIT UKPJN RANIKHET
₹2.2 L
PM CONSTRUCTION UNIT UKPJN RANIKHET
23 Mar 2023
17 Jan 2023
8 Feb 2023
17 Jan 2023
6 Feb 2023
24 Jan 2023
23 Jan 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level Cement mortar 1:4 (1 cement :4 coarse sand)
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement : 6 fine sand)
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar work
Mahesh Verma Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .