Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Fee/PreQual/Technical/Finance | -28.27% | ₹10.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.6 L+₹46,282.14 (4.56%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹10.6 L+₹46,282.14 (4.56%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹10.6 L+₹46,282.14 (4.56%)Admitted-Fee/PreQual/Technical/Finance EAST GOBINDAPUR KAILASHAHAR TRIPURA U | KAILASHAHAR | UNAKOTI | TRIPURA | -25.00% | ₹10.6 L+₹46,282.14 (4.56%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹10.6 L+₹46,282.14 (4.56%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹10.6 L+₹46,282.14 (4.56%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹10.6 L+₹46,282.14 (4.56%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹10.6 L+₹46,282.14 (4.56%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.2 L
EMD Value
₹28,307
Closing Date
21 Aug 2026, 3:00 pmClosed
Chief Executive Officer KMC KLS
O/O the Chief Executive Officer KMC KLS
Construction of C.C. Road and RCC Drain at Ward No.13 under Kailashahar Municipal Council, Kailashahar Unakoti Tripura for the year 2025 26.
2026_Urban_75818_1
PNIeT No.07/KLS/MC/2026-27 Sl No.02
Open Tender
Civil Works
Percentage
90 days
Ward No.13 under KMC
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹28,307
24 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No 01 : Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. | - | cum | 179.9 | - |
| 2 | Item No. 02 : Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | 1,177.3 | - |
| 3 | Item No. 3: Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: i) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | cum | 8,980 | - |
| 4 | Item No 4: Providing and laying in position specified grade excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level: - i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 10,742.6 | - |
| 5 | Item No. 5: Centering shuttering including struttings, propping etc. and removal of form work for: i) i) Foundations, footings, bases for columns etc. for mass concrete with timber plank | - | sqm | 333.9 | - |
| 6 | Item No 6: Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level: - i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20 mm nominal size) | - | cum | 11,080.4 | - |
| 7 | Item No. 7: Centering shuttering including struttings, propping etc. and removal of form work for: i) Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply | - | sqm | 729.5 | - |
| 8 | ii) Walls (any thickness) including attached pilasters,buttresses, plinth and string courses etc. using shuttering ply | - | sqm | 496.1 | - |
| 9 | Item No. 8: Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. i) Thermo-Mechanically Treated bars of grade Fe-500D or more | - | kg | 103.9 | - |
| 10 | Item No 9: First class brick work in foundation and plinth including cost of all materials as required complete: i) In cement mortar 1:6 ( 1 cement : 6 fine sand ). | - | cum | 9,515.2 | - |
stage.html
html • 0.03 MB
finance_77182.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Tendernotice_2.pdf
PDF • 3.72 MB
BOQ_77182.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .