Loading…
Loading…
Tender Value
₹3.0 Cr
EMD Value
₹3 L
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Upgrade Drainage Line & SWD Line Network,Maintanace Work and Breakdown Repairing Works in Diiff.T.P.Road and Diff.chwali Area,Diff.gamtal Area and other Require Differant Places in Different Ward of West Zone. (A.R.C. TENDER) (Re-Tender)
337445
2/26-27 (T.N.13)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Municipal Commissioner, Ahmedabad
₹3 L
21 Aug 2026
21 Aug 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
Name of Work :- Upgrade Drainage Line & SWD Line Network,Maintanace Work and
Breakdown Repairing Works in Diiff.T.P.Road and Diff.chwali Area,Diff.gamtal Area
and other Require Differant Places in Different Ward of West Zone”(A.R.C. TENDER)
1 Excavation for pipe line trenches for water supply,
sewerage lne, manhole etc. all with shoring and
struting if required as per required gradient and line
including safety provisions using site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified.
(a) 680 Upto 1.50 mt depth 89 Cmt
(b) 260 1.5 mt to 3 mt depth 98 Cmt
(c ) 36 3.00 mt to 4.50 mt depth 103 Cmt
(d) 36 4.50 mt to 6.00 mt depth 109 Cmt
2 Extra rate over item of excavation of earth for
excavation of asphalt pavement/RCC of thickness up
to 0.20 meter including demolishing the asphalt
carpet,metal,soiling /cutting reinforcement etc.comp.
with stacking the material as directed.
(a) 90 up to 0.20 meter thickness (By Manual) 71.42 Smt
(b) 200 Up to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator,
fuel, & transportation etc complete. 178.57 Smt
(c ) 100 0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete. 312.5 Smt
3 Refilling the pipeline trencheds incl. ramming,
watering, consolodating desposal of surplus stuff as
directed within a radius of 3 km.
(a) 800 Refilling as directed 22 Cmt
(b) 400 do-- with selected soil brought from outside including
all lead 175 Cmt
4 980 Conveyance charge of earth,lime,murrum, building
rubbish,manual garbage,sludge ,excavated rock,fly
ash, aggregate of any kind etc. comp. up to 5Km.
5 Providing and supplying ISI marked only standard
length Stonewate pipes in standard lengths of
following class and diameter including all
taxes,insurance, transportiton, fright charges,
octroi,inspection charges, loading,unloading,
conveyance to departmental stores, stacking etc.
complete (IS- 651-1989)
6 Lowering, laying and jointing stone ware pipes of
following diameters with cement joints in C.M.1:1
proportion in proper position , grade and alignment
at all level as directed by Engineer-in- charge
including conveyance from stone to site of work,
Jointing material etc.comp.
7 Providing and supplying ISI Standard RCC pipes (of
sulphate resisting Cement )in standard lengths of
following class and diameter suitable for rubber ring
joints (socket and spigot) including all taxes,
insurance, transportation,treight charges,octroi,
inspection charges, loading,unloading, conveyance
to departmental stores, stacking etc. complete
Class NP3 Test pressure 0.7 Kg/Sq.Cm
(a) 200 300 mm dia 755 Rmt
(b) 50 450 mm dia 1361 Rmt
(c ) 20 500 mm dia 1485 Rmt
(d) 20 600 mm dia 1946 Rmt
8 Lowering, laying and jointing R.C.C. pipes in C.M.1:1
1/2 of following diameters in proper position , grade
and alignment at all level as directed by Engineer-in-
charge including conveyance from stone to site of
work, labour giving hydraulic testing as per ISI code.
(a) 200 300 mm dia 119 Rmt
(b) 50 450 mm dia 171 Rmt
(c ) 20 500 mm dia 189 Rmt
(d) 20 600 mm dia
9 Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of
chamber seat cover etc..completed.
(a) 30 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=150 mm. 2261.6 No
(b) 30 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to
0.90meter for pipe dia <=20 mm. 2874.1 No
(c) 45 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to
1.20 meter for pipe dia <=20 mm 3905.35 No
10 Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling, Brick
Bats Cement Concrete (1:5:10) of thickness 15 C.M.,
CC Channel (1:2:4) of thickness 10 C.M., finished
mm thick cement plaster inside & outside (Only for
shaft) In Cm 1:3, Finishing With Cement Slurry, P/F
4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab
In Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at 15 C.M.
c/c bothway 10 mm dia.)But Excluding The Cost Of
Manhole Seat Cover Etc..Completed Of Size 0.75 X
1.00 Meter (Inside Clear, M.H. length should be
parallel to the flow)
(a) 50 1.00 to 2.00 meter depth, (Slab at Ground level) (for
pipe dia <=230 mm) 5651.78 No
(b) 25 2.00 to 3.00 meter depth, (Slab at below 0.60 mt.
From G.L.) (for pipe dia <=300 mm) 11395.54 No
11 8 Rate reduction over item of Constructing Slab Type
M.H. Chamber of size 1.00 x 0.75 mt for constructing
slab @ depth more than 0.60 mt below Ground
Level (Max. 3 unit of DM should be reduced in this
item) 460.71 DM
12 Constructing Slab type M.H. Chamber of the
following size including excavation, refilling, brick
bats cement concrete (1:5:10) of thickness 15 C.M.,
CC Channel (1:2:4) of thickness 10 C.M., finished
mm thick cement plaster inside & outside (Only for
shaft) in CM 1:3, finishing with cement slurry, P/F
mm dia M.S.Steel HDPE coated steps 35 cm c/c at
35 cm staggered in masonary CM 1:5, RCC Slab in
CC 1:1.5:3 of thickness 23 C.M., including Cantering
& reinforcement (double jalli at 15 C.M. c/c bothway
12 mm dia.) but excluding the cost of Manhole seat
cover etc..completed. of Size 1.00 X 1.40 meter
(Inside Clear, M.H. length should be parallel to the
flow, for pipe dia <= 800 mm)
(a) 30 1.00 to 2.00 meter depth, (Slab at Ground level) 10177.68 No
(b) 12 2.00 to 3.00 meter depth, (Slab at below 0.6 mt.
From G.L.) 19258.04 No
(c ) 8 3.00 to 4.00 meter depth, (Slab at below 1.00 mt.
From G.L.) 26867.86 No
(d) 6 5.00 to 6.00 meter depth, (Slab at below 1.00 mt.
From G.L.) 44050 No
13 Extra rate over item of Constructing Slab Type M.H.
Chamber of following size for constructing M.H.
Chamber, per 1.00 Decimetre of additional depth or
part thereof. etc. complete. Of size 1.00 x 1.40 mt.
(inside clear) and Depth from
(a) 8 4.00 to 5.00 meter depth,
(b) 8 6.00 to 7.00 meter Depth 536.6 DM
(c ) 8 8.00 to 9.00 meter Depth 551.78 DM
(d) 8 9.00 to 10.00 meter Depth 564.28 DM
14 7 Rate reduction over item of Constructing Slab Type
M.H. Chamber of size 1.00 x 1.40 mt for constructing
slab @ depth more than 0.60 mt for ( MH 2 to 3 mt
depth) and 1.0 mt for (MH above 3.0 mt depth)
below Ground Level (Max. 5 unit of DM should be
reduced in this item) 586.6 DM
15 Dismantling of existing Arch type manhole up to Arch
and then Const. Slab type manhole of following size
incl. excavation, refilling and & finished 15 mm thick
cement plaster inside in CM 1:3, P/F 4 mm dia
M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggered in masonry CM 1:5, incl. cost of RCC Slab
in CC 1:1.5:3, including Cantering & reinforcement
as directed by engineer in charge. Rate includes
carting of debris and excavated soil
(a) 60 1.00 x 0.75 mt (inside clear) RCC Slab of thickness
15 C.M& reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
(b) 15 1.00 x 0.75 mt (inside clear) RCC Slab of thickness
15 C.M& reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.)
(c ) 20 1.40 x 1.00 mt (inside clear) RCC Slab of thickness
23 CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 0 to 2 mt depth (Slab at
Ground level) 8080.35 No
(d) 15 1.40 x 1.00 mt (inside clear) RCC Slab of thickness
23 CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at
below 1.00 mt. From G.L.) 17008.93 No
(e) 10 1.40 x 1.00 mt (inside clear) RCC Slab of thickness
23 CM & reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 3 to 4 mt depth (Slab at
below 1.00 mt. From G.L.) 24776.79 No
16 15 Provdg. & laying S.W. Gully trap with brick
masonry chamber & water tight G.T.Stone including
fixing of cover Square mouth trap 100 mm x100 mm
size P-Trap 1279.4 No
17 Making connection to the ex. M.H.in running
sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any
convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
a 110 a. 150 mm to 300 mm dia.
b 10 b. 400 mm to 600 mm dia. 2232.14 No
18 Cutting the pipes of following dia coming in the new
M.H.in running sewer including cutting bars,
including removing debris /silt from the M.H. and
carting at a suitable distance etc..complete as
directed. No payment for M.H. work will be made
until pipe is not cut completely in all respect.
a 150 150 mm to 300 mm dia. 1133.92 No
b 50 400 mm to 600 mm dia. 1687.5 No
19 Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in
C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and
carting the same as directed.
a 650 (A) up to 0.15 mt. (@ Two Coarse) 732.14 No
b 270 (B) up to 0.35mt. (@ Four Coarse) 1160.71 No
c 100 (C) up to 0.65 mt. (@ Seven Coarse) 1794.64 No
d 45 (D) up to 0.90 mt. (@ Ten Coarse ) 2160.71 No
20 500 Repairing damaged I.C./ Raising removing
damaged brick work and repairing by brick masonry
in C.M. 1:5 and plaster in C.M. 1:3 and fixing
C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the
same as directed. 401.78 No
21 RCC Precast M.H.Frame & Cover Manufacture
supply & Delivery at store or at side of work Precast
RCC M200 Frame & Cover Suitable to drainage
M.H. and as per type design & Drawing including
cost of reinforcement M.S. Angles or Flat , cutting
1 500 Frame Suitable for 50 Cm opening of MH 1121 No.
2 500 Cover Suitable for 50Cm Opening Of MH 1173 No
1 110 Frame Suitable for 50 Cm opening of MH 1000 No.
2 110 Cover Suitable for 50Cm Opening Of MH 1066 No
c House connection Chamber Light Duty
1 265 Frame 813 No.
2 265 Cover 920 No
22 50 Carting and Fixing M.H. Chamber or Catchpite Seat
and Cover in line and level to match exisisting road
level in CC 1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as directed.
M.H. seat cover will be supplied byA.M.C.(from any
23 Providing Kachha of Pakka Dummy in the following
dia pipes and removing the same after
completion of the connection work as directed.
a 800 (A) 100 mm to 300 mm dia. 199.1 No
b 10 (B) 350 mm to 600 mm dia 302.67 No
24 9000 Providing and fixing cast iron manhole frame of
weight 80 to 85 kg suitable for existing EHD-35 FRC
MH cover, rate also incl. loading, unloading and
fixing the frame in line and level to match exisisting
road level in CC 1:2:4 and finishing smooth, watering
and protecting for 7 days etc. complete as per
instruction by engg. in charge. 71.42 Kg
25 380 Raising of Existing manhole item includes,cutting of
existing road surround by Manhole by diamond
cutter machine dismantling of road in confined area
by breaker machine and carting of dismantal
material.item also included necessarey brick work to
raise the manhole at road level in CM 1:3 item also
included fixing of Manhole frame at exact road level
by using MaserEmaco S 488 trowable fibre
reinforced thixotropic repair mortal material Laying of
concrete made form Master Emaco 5 346 flowable
micro concrete material in desired thickness and
laying of hot bitumanous material in Upper layer and
compaction of hot bitumanious material by palte
compactor machine .Rate also included necessary
plaster at inside of manhole in CM 1:3 in 20 MM
thickness on raised brickwork. 6830.35 No
26 80 Brickwork using common burnt clay building bricks
having crushing strength notless than 35kg./Sq.Cm.
in foundation and plinth in Cement Mortar 1:5 (1-
Cement:5-finesand) (B) Conventional (upto 10 ton)
27 Supplying, labour for break down repairing work for
activities like excavation, disliting, removing debris
from trench back filling etc. comp. as directed by
a 9000 Mazdoor at day /Night 452 No
b 1500 Makadam/ supervision at day / Night 711 No
28 300 Providing Dead Cantering using good quality
Country Wood Planks, wall Plate of required
thickness and size including placing the nece.
supports of reqd. size, nailing, fixing with mortar,
levelling. All specification for dead centring as per
standard engg. practice etc. comp. as directed. 312.5 Smt
29 750 Providing 15mm thick cement plaster in single coat
on Rough (Similar)side of single or half brick walls
for interior plastering upto floor two level and finished
even and smooth in (i) Cement mortar 1:3 (1-
cement:3-sand) finishing with a floating coat of neat
cement slurry. 174.83 Smt.
30 10 Supplying cutting, bending, binding and placing in
position steel as per plan and design and as per IS
2502 including cost of steel and binding wire for
reservoirs/ structuresonly including lift up to 6 meter
height or depth below GL for all diameters TMT bars
Fe-415 grade for all diameters 73208 MT
31 15 Providing and laying cement concrete work 1:2:4 (1-
Cement:2-Coarsesand:4-graded stone aggregates
20mm nominal size) and curing complete excluding
cost of formwork and rein for cement for reinforced
concrete work in (A)Foundations,footings,Base or
columns and Mass concrete (upto 10 ton) 3661.3 Cmt
32 800 Providing and installation of barricading with retro-
reflective paint/ film/ tapes (Minimum 3.0Mt. height) as
specified in the drawing & specifications for the
construction of road work, along with necessary
diversion arrangement for existing traffic movement in
an unobstructed condition, all relevant markings, sign
boards and illumination as per relevant MORT&H
specification. Precoated galvanised iron profile sheets
shall be of approved make and shade having 0.50 mm
(+0.05 %) total coated thickness with zinc coating
grams per sqm as per IS: 277, in 550 mpa steel grade,
5-7 microns epoxy primer on both side of the sheet
and polyester top coat 15-18 microns. Rate to be
inclusive of all materials, fabrication works, paint works
for information (retro reflective paint), foundation works,
transportation, loading, unloading, installation,
dismantling and inclusive of all taxes and including the
same design for providing openable gates. No extra
rental will be given to the contractor in case of any
delays from his part for construction or due to any valid
time limit extensions. Each barricading sheet is to be
numbered with a unique number. The barricading
provided shall be retained in position at site
continuously i/c shifting of barricading from one location
to another location as many times as required during
the execution of the entire work till its completion. Rate
include its maintenance for damages, painting, all
incidentals, labour materials, equipments and works
required to execute the job. The barricading shall not
be removed without prior approval of Engineerin-
Charge. (Note :- One time payment shall be made for
providing barricading from start of work till completion
of work i/c shifting. The barricading provided shall
remain to be the property of the contractor on
completion of the work). Blinkers are to be installed on
the barricading and rate for blinkers will be payable as 654.91 Rmt
per relevant item. Barricading is to be cleaned by
33 500 Barricading the entire break down or excavated area
on rental basis using wooden ballies / M.S.angles at
max. 2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board out side to avoid accident &
for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement
through out the work with necessary required
arrangement. ..The same shall be removed after
completion of work. (Only for break down work from
start to complete) 80.35 Rmt
34 25 Manufacturing,and supplaying steel vantilation
colums 15 cms dia medium class pipe with 60 x
cm 20 mm thick base plate and stiffeners C.I
ormamental cap 50 Kg and necessarey foundation
nut bolts with one coat or red lead oxide paint etc as
per drawing and carting to the work site etc. 11660 No
35 25 Labour charges for erecting steel ventilation colums
15 cms dia with ornamental cap safety with the help
of reqyuired capicity of hydra crane and base fixed
with necessarey foundation with coat or lead oxide
paint and two coat of any approved colour with
cms dia stone ware of RCC pipe connecting with MH
including excavation and jointing as required etc. 7500 No
36 100 Providing and operation dewatering Pump including
fuel charges & operator Charges etc. as directed etc.
comp. (Shift for Eight Hour) (For Each Pump Set, No
payment should be allowed for non working
condition of machinery) 600 Shift
37 19500 Hiring and operating Mud Pumps incl. Cost of fuel
and operator including the cost of to and fro
transportation, laying of the delivery hoses as
required, lowering and lifting the pumps as and when
required etc. complete. Set Do As Directed. (No
payment should be allowed for non working H.P/H
condition of machinery ) 18.32 r
38 190 Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery, and
lighting and other requirements with Arranging
diesel to run the D.G. Set Do As Directed. 8 Hrs
Shift. (No payment should be allowed for non
working condition of machinery) 2800 Shift
38- 100 Hiring and operating the 60 KV 3 Phase Electric
A Generator for operating desilting machinery, and
lighting and other requirements with Arranging diesel
to run the D.G. Set Do As Directed. 8 Hrs Shift. (No
payment should be allowed for non working
condition of machinery )
39 3000 Providing & Supplying JCB Machine on rental basis
in case of emergency situation and break down type
work & also during unavoidable condition as per
instruction of engg.incharge, rate includes all nece.
shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store.
(No payment should be allowed for non working
condition of machinery and for pipe line excavation
and laying work 600 Hour
40 700 Providing & Supplying Hitachi Machine -110 capacity
on rental basis in case of emergency situation and
break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating
charges . 2000 hr
41 430 Providing & Supplying Hitachi Machine -200 capacity
on rental basis in case of emergency situation and
break down type work & also during unavoidable
condition as per instruction of engg.incharge , rate
includes all nece. shifting, fuel and operating
charges. 2700 hr
42 20 Providing & Supplying hydra carne Machine of
tone capacity on rental basis in case of emergency
situation and break down type work & also during
unavoidable condition as per instruction of
engg.incharge, rate includes all nece. shifting,fuel
and operating charges. 3334.49 Shift
(a) 10 16 tone 3418.65 Shift
43 70 Supplying electric breaker machine for RCC slab or
asphalt demolishing work on site by using operator,
fuel, power supply etc.complete as directed. 1200 Shift
44 950 Supplying Pneumatic Breaker Machine for RCC Slab
or Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. 600 Hr
45 900 To Provide Tractor with Hydraulic trolley, driver with
fuel to carryout different works during day/night for
Hr. shift Work shall be carried out as per the
instructions of engineer in charge. No Extra charged
shall be paid for night shift. 1661.02 Day
46 400 Hiring of Three wheeler carrier (Chakado/Rixa)
considering 10 Hrs. as working day hours incl. Driver 1153.24 Day
47 15 Levelling or orientation of existing gully trap chamber
incl. Nece. masonry in CM 1:6 and plaster in CM 1:3
etc. using old G.T.stone and cover etc. comp. 71.42 No.
48 120 Constructing bombay pattern type catch pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
BBCC (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the
prop M15 at bottom and 15 mm thick cement
plaster inside the catch pit in the proportion of CM
(1:3) with out jali etc. comp. as directed. 3125 No.
49 120 CatchPit Jali Fixing P/F FRC catch pit jali with frame
600mm x 600mm clear opening etc. comp. As
directed by engineer in charge. 1522 No.
50 4500 Supplying & fixing M.S. plate of required size
including cutting bending carting to site placing on
damagrd portion of main drainagr line on site incl.
loading un loading etc. comp. as directed by engg. In
charge.. 85 Kg.
51 Temporary / Permanent Plugging for blocking of
sewer line, branch connections and diversion of
flows and removal of all plugs by any means etc.
comp. as directed by Engineer In Charge of the
52 1950 Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or
round bars with round headed bolts and nuts or by
screws (A) Plain Grill. (upto 10 ton) 100.17 kg
53 66 Providing and laying in position Ready Mixed M-250
grade concrete for reinforced cement conctere work
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead
up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade
for reinforced cement concrete work including
pumping of R.M.C. from transit mixer to site of
laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of
admixtures in recommended proportions as per IS:
9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and
durability as per direction of the Engineer - in -
charge 4853.56 Cmt
54 250 Filling in plinth with sand under floors including
watering ramming, consolidating and dressing etc.
complete. 455.63 Cmt
55 203 Supplying Potable Water Tanker to be filled from
nearby water distribution station of AMC. with
meter Delivery Pipe. The tanker should be supplied
as & where reuired & when order placed by Engineer
In -Charge The rate includes the fuel charge, driver's
charge etc..complete. 400 Trip
56 Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC
in mechanical mix plant carriage ofmixed Materialby
tipper to site, laying inuniform layers insubbase/
base course on wellprepared surface and
compacting with vibratory roller to achieve the
desired density as per Codal Provision
(a) 120 Production & Supply of WMM
(b) 120 Laying Of WMM 31.25 Cmt
57 65 Supply of graded machine cut black trap stone
aggregate (metal) of Sevaliya /Tima or equivalent
quality metal of size 25 mm to 40 mm. 870.53 Cmt
58 975 Labour work for spreading the metal 85 mm thick in
single layer, incl. providing & applying bitumen for
semi grouting 2.5 kgs/sqm. & Providing & spreading
the key black trap aggregate of good quality on top
at the rate of 0.013 cmt. per sq.m. of size18mm
passing in 9.5 mm retain rolling with 10 tonne roller
etc comp. as directed. 112.81 Smt
59 305 Dismentaling tiled of stone floors laid in mortar
ncluding stacking of serviceable materilas and
disposal of unserviceable materials with all lead and
lift. 47.25 Smt
60 375 Labour work for fixing any kind of paving with
cement pointing in CM 1:2, including watering,
ramming etc comp. as dir.For pavement I) Laying on
Sand bedding as per requirement to fix the
C.C.Block / Nibhada Stone in Line & Level 69.64 Smt
61 730 Labour work for reinstament or asphalt pavment
covering excvation watering consoldation resoiling
meating with the activity of teackcoat including
carting the mix from the nearest store pacting it with
convayance charge of excavation earth etc.comp as
directed. 44.64 Smt
Contractor's Sign Addl.C.E.
Mobil No: - (west zone)
Tender Fee Rs.3600.00
Earnest Money Rs.3,00,000.00
Contractor’s Name & Address :
MEMORANDUM OF WORK IN BRIEF
Upgrade Drainage Line & SWD Line
Network,Maintanace Work and Breakdown
1. Name of Work Repairing Works in Diiff.T.P.Road and
Diff.chwali Area,Diff.gamtal Area and other
Require Differant Places in Different Ward of
West Zone”(A.R.C. TENDER) (Re-Tender)
Rs. 2,99,99,974.44 (exclusive of GST). GST will be paid extra by
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.-3,00,000.00)
3. Earnest Money (D.D./Pay Order /B.G.)
4 Tender Fee Rs Demand Draft of Rs.-
6. Time-Limit 12 months
7. Validity Period 120 Days
8 Eligibility Criteria Register “B” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
(i) Last Date of Online Submision of
9 the Tender Upto Dt.01-09-2026 upto 18:00 PM
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
Date and Place of Tender Document
11 Date of Opening Submission of EMD. Tender fee and other Documents during office
hours: On Dt..02-09-2026 &12:00 pm West Zone, 2nd Floor, A.M.
Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and
12 Penalty Due to Delay of work
upto 30 Lakhs), (3) Rs.5000 per day (for all tenders amounting
above 30 Lakhs) but not more then 10% of bill
13 Terms, Condition, & Specification All general condition of contract of Form B1 condition of contract
shall be applicable..
The staff of the contractor shall wear safety jackets,
hoes, helmets etc. while on duty and any violation will attract fine
14 of Rs. 5,000/- for each incident.
Safety Failure to erect safety signage or trying to carry out he
works without proper precautions/safety measures as equired will
attract a fine of Rs. 5,000/- for each incident.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at his
own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards the
expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion.
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the certified
date of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall
be 12 months from the certified date of completion which should
include one monsoon.
(d) For building works, the period specified in (a), (b) or (c) above
OR elapse of monsoon period following the certified date of
completion, whichever is later. For the purpose of deciding the
monsoon period, the 30th September may be treated as the last
16 Time permitted to start parts of Whenever a work is allotted by Engineering staff, whether
work minor or major of part thereof of any amount, the contractor
shall be bound to start the works within 48 hours of intimation
of work. Communication done telephonically via SMS, Via
Whatsapp and through letter / E-mail shall be considered legal
and binding for the same. Failure of comply to start the works
in 48 hours of intimation as above by contractor the contractor
shall be levied penalty of (1) Rs.1000/- per day (for tenders
amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders
amounting above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per
day (for all tenders amounting above 30 Lakhs). Three times
failures by contractor shall make contractor responsible to be
black listed unless and otherwise justified properly in writing /
binding within 15 days of last notice of penalty.
17 Compensation for Delay 10% of Remaining work (As per Circular)
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
Of Tender And The Same As to be Attached Along With The
Tender Document.
19 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
20 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor's Sign Addl.C.E.(west zone)
AMCFinancedept.circular No –41,Dt.08/02/2022
(A) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDonpermanentbasis.
(1) AllNationalizedBanks
(B) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDfortheperioduptoMar
ch-31,2022.Thevaliditycut-
offdateintheGRiswithrespecttothedateofissueofBankGuaranteeirrespectiveofthedateoft
erminationofBankGuarantee.GuaranteesissuedorAuthorizedbyAhmedabadBranchOnly
(1) CommercialBanks:
(5) KotakMahindraBank
(6) IndudIndbank
(8) TamilnaduMercantileBank
(9) UjjivanSmallFinancebank
(10) AUSmallFinanceBank
(11) FedaralBankBank
(12) EquitasSmallFinancebank
(13) BandhanBank
(14) StandardCharteredBank
(2) Co-Operative&RuralBanksofGujarat
1. TheMehsanaUrbanCo-operativeBankLtd
2. TheAhmedabadMercantileCo-OperativeBankLtd
3. NutannagrikSahakariBankLtd
4. TheKalupurCommericalCo-operativeBankLtd
5. RajkotNagarikSahakariBankLimited
6. TheGujaratStateCo-OperativeBank
8. SaurashtraGraminBank
Seal and Signature of theBidder AddlCityEngineer
TERMS&CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
(B)GENERALTERMS&CONDITIONS
(C)FINACIALTERMS&CONDITIONS
(D)MAINCONDITION/FETURESOFTHEWORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender fee & EMD
(Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate envelope (marked
as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed Post/ Hand Delivery in
duplicate. The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by the bidder.
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures then announce
the names of bidders in the presence of bidders or their representatives who choose to attend on the date and
time mentioned in the NIT In the event of specified date of bid opening being declared as a holiday for the
Employer, the Tender will be opened at the appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer at the
opening will announce bidder’s names, , the presence/or absence of EMD, the amount and validity of EMD
furnished with each bid, is valid registration and such other details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the Invitation for Bid
and has not been furnished in the form, the bid shall be rejected by the Employer as non-responsive and the
Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with valid EMD will
be taken up for further evaluation. In case, the Bank does not confirm the EMD, the bid shall be rejected as non-
responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed, meets
the eligibility and qualification criteria, has the required available bid capacity, is accompanied by the requisite
certificates, undertaking and other relevant information specified in the bid documents and is substantially
responsive to the requirement of the bidding documents and provides any clarification for ascertaining the
correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not subsequently
be made responsive by correction or modification or withdrawal of the nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be substantially
responsive in accordance with Clause 2 and qualified for award of Contract in accordance with Clause 5 (General
Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and time. In the
event of specified date of bid opening being declared bidders who qualify the criteria then bidder bid will be
considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price, provided that such
bidder has been determined to be (i) eligible in accordance with the provisions of Clause 3(General Terms and
Condition); and (ii) qualified in accordance with the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This letter shall
name the sum which the Employer will pay the Contractor in consideration of the execution, completion and
maintenance of the Works by the Contractor as prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving letter of
Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion, ask any
bidder for authentication the correctness of the information/details furnished by him in his bid. Such request by
the Employer and the response by bidder shall be in writing or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from the
time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid comparison or
contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and recommendations
for the award of a contract shall not be disclosed to bidders or any other persons not officially concerned with
such process until the award to the successful bidder has been announced. Any effort by a bidder to influence
the Employer's processing of bids or award decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for itself on its own
responsibility all information that may be necessary for preparing the bid and entering into a contract for
construction of the Works. The costs of visiting the Site shall be at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its premises
and lands for the purpose of such inspection, but only upon the express condition that the bidder, its personnel
and agents, will release and indemnify the Employer and its personnel and agents from and against all liability
in respect thereof and will be responsible for death or personal injury, loss of or damage to property and any
other loss, damage, costs and expenses incurred as a result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for the
construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed in the table
given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class and or equivalent. If
contractor is not registered with AMC in the relevant class, on award of contract he shall be required to
register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the Employer shall
reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of R.&B.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required to
provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown, produced or
manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder; and
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
The work shall be completed with 12 Months after the order to start the works.
The details of reinforcement of R.C.C. work shall be as per design and instructions of City Engineer/Addl.City
Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought by him on
site. This account shall be regularly maintained and kept open for inspection by Municipal Staff. Watering of all the
items shall be as per instructions. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any when such case occurs. The
contractor shall arrange formed ampersand in night and he shall be responsible for any damage of life and limb or
property if any happen, during the execution of work. In case of dispute for unseen or overlooked items the decision
of the city Engineer/Addl.City Engineer shall be final. The contractor shall have to give site clean of all rubbish on
completion of work and have over the building with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by contractor at this risk and cost.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to prepare
through of bigger size and mix the mortar in the required proportion. In on case he shall be allowed to mix the
mortar either on floor or any finished surfaces.
The contractor shall have to make his own arrangement for water required for the work and shall pay the water
charges as per water meter.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall be
paid at the rate fixed by C.E . /Addl. City Engineer as per the rate analysis based on current market rates.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to
carry out the works and he will be paid at the rate quoted by him and no claim for extra for subsequent changes may
be entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to prepare
the measures boxes according to this measure.
The R.C.C. or specified work shall not be done on Sunday and holiday excepting emergency or when technical
requirements are such that continuity of work should be maintained and that to will be with prior permission of the
competent authority.
Retention money at the rate of 2% shall be deducted from every running bill of the contractor and which will be paid
at the time of final bill.
Contractor will be fully responsible for compliance of the various prevision under contract Act. 1970 and the Rules
framed for to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for this
work and the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If any
tenderer withdraw or makes any modifications (s) or addition (s) in the terms and conditions of his tender not
acceptable to the Municipal Corporation, the Municipal Corporation shall without prejudice to any right or remedy
be at liberty to forfeit in full the said earnest money absolutely.
As per Circular No. MCR 2176 (96) 2418 (ii) GHH dated 31-03-77 issued by Government of Gujarat contractors are
requested to produce their quarry materials for construction work through legal sources. i.e. only form the quarry
lease holders, permit holder or middle man who satisfies the contractor as to the legality of the source of purchase
by him on these materials.
If the work is not carried out within the specified time limit penalty will be charged applicable as per AMC Rules.
Contractor has to make his own arrangement for procurement of steel and cement.
i) Conditional tender will not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft
iv) Condition of form B1 Standard Specification of material & code of practice will be applicable. Form B1 & B2
can be is available in website. Condition of Form B-1 For Defect liability Clause is not applicable For this Work.
V) in the Case missing/Dout,Correction or Detail Specification As Per Govt.Speecification Applicable For this Work
& As Per instruction of Engg.inchage & also General Technical Specifications for Building Works book available from
Gujarat Book Stores (Pvt.) Ltd. Sector-21,Gandhinagar,DETAILED GENERAL TECHNICAL SPECIFICATIONS can be
available from Ahmedabad Municipal Corporation website “www.egovamc.com”.
Contractor’s Signature Add. City Engineer
General information
All individual firms must complete the information in this form. Nationality information shall be provided for all
owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the following
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non-performance of the contractor, consistent history of litigation awarded against the
applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only in E-
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and words) only in E-
Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their misleading or false
representations in the forms statements etc. for the period to be decided by the Employer.
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a joint venture. A
bidder who submits or participates in more than one bid for a contract package will be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to comply with the
requirements of bid documents will be at the bidder's own risk. Pursuant to Clause 16, bids which are not
substantially responsive to the requirements of the bidding documents will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the Employer
shall be written in the English language. Supporting documents and printed literature furnished by the bidder may
be in another language provided they are accompanied by an accurate translation of the relevant passages in the
English language, in which case, for purposes of interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as described in
bidding documents, based on the percentage rate amount in the Bill of Quantities submitted online by the
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and words) for
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures and words) for
overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid submission specified in
Clause. The Employer as non-responsive shall reject a bid valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may request the
bidders to extend the period of validity for a specified additional period. The request and the responses
thereto shall be made in writing or by fax. A bidder may refuse the request without forfeiting his bidder
agreeing to the request will not be required or permitted to modify his bid but will be required to extend the
validity of his Bid Security for the period of the extension, and in compliance with Clause 2 ( Financial Terms &
Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly authorized to
sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions issued by
the Employer, or as necessary to correct errors made by the bidder, in which case the person or persons
signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date specified in
Any bid received by the Employer after the deadline for submission of bids will be returned unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the Employer will
direct him to submit the Performance Security and attend the Employer's office on a date determined by the
Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high quality work
within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner and medium,
so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original and extended
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for award has
engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer will declare
the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract by AHMEDABAD
MUNICIPAL CORPORATION if it at any time determines that the firm has engaged in corrupt or fraudulent
practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private sectors by which they
improperly and unlawfully enrich themselves and/or those close to them, or induce others to do so, by
misusing the position in which they are placed, and it includes the offering, giving, receiving, or soliciting of
anything of value to influence the action of any such official in the procurement process or in contract
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement process or the
execution of a contract to the detriment of the Borrower, and includes collusive practice among bidders
(prior to or after bid submission) designed to establish bid prices at artificial non-competitive levels and to
deprive the Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract without
assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material misrepresentation or
provided fraudulent information / statement, the said Bidder will be liable for disqualification / rejection at any
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender volume is
submitted without valid documents and without proof of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are conditional
tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws as well
as framed from time to time). Any penalties laid due to violation of such laws shall be directly deducted from the
contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the road i.e. public
and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers, traffic signs as per
design, safety tapes etc. to be arranged at site. Necessary florescent marking on traffic signs to be provided so
that it should be visible at night. During night working hours safety in charge personnel shall be provided with
florescent jackets. This shall be Provided at no extra cost by the bidder under attaché with specified in the
tender documents under payable iteme.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new connection
on behalf of AMC. It includes filling the necessary application to power Supply Company, follow up and getting
the supply, filling the necessary test reports to the power supply company. All official fees including security
deposits and other expenses shall be of initially paid by the contractor. AMC may support to get the temporary
connection and may at its diseretien get the same converted to permanent connection at the same of AMC if
desired do,and contractor shall as no extra cost support the same. In this case AMC my be as the remaining
cost subject to approval.
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract upon any
agreement for a commission, percentage, brokerage or contingent fee. Breach of this warranty shall give the
Municipal Commissioner the right to cancel the contract or to take any other measure as the Municipal
Commissioner may deem fit. The warranty does not apply to commissions payable by the contractor to
establish commercial or selling agent for the purpose of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this contract or to any
benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or under this
Contract against the contractor the same may be deducted by the Municipal Corporation from any sum then
due or which at any time thereafter may become due to the contractor under this contract and failing that
under any other contract with the Municipal Corporation or from any sum due to the contractor with the
Municipal Corporation (which may be available with Municipal Corporation), or from his retention money, or
he shall pay the claim on demand. The Municipal Corporation reserves the right to carry out post payment
audit and technical examination of the final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment when detected
not withstanding the fact that the amount of the final bill may be included by the Contractor.
If as a result of such audit and technical examination any over payment is discovered in respect of any work
done by the Contractor or alleged to have been done by him under the contract, it shall be recovered by the
Municipal Corporation from the contractor by way of all the means prescribed above or if any under payment
is discovered by the Municipal Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at any time thereafter become due
before payment is made to the contractor from him to the Municipal Corporation on any other contract
account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become liable and
which is chargeable to the contractor, the owner shall have the right to retain out of any payment then due or
thereafter to become due an amount sufficient to completely indemnify the owner against such lien or claim
or if such lien or claim be valid the owner may be or become due and payable to the contractor. If any lien or
claims remaining, unsettled after all payments are made, the contractor shall refund or pay to the owner all
money that the latter may be compelled to pay in discharging such lien or claim including all cost and
reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the
contract documents. The full consideration shall be given to such addendum or corrigendum before submission of
tender duly filled in by the contractor. Therefore, the contractors shall have to kindly refer the tender for such
addendum or corrigendum published by AMC through its website www.amc.nprocure.com & www.nprocure.com
hours prior to the deadline of submission of the tender. Tenderers shall verify the number of addendum issued and
enclose the same with the tender documents , failing which the tenders shall be liable for rejection and no any
complaint in respect to this shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the Employer will in
no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be valid for
days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as promptly as Early as
possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when the bidder
has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder shall
deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in the form of a Bank
Guarantee/ DD/Locle MICR cheque for an amount equivalent to 5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a policy is
framed by Audit department of AMC to charge 4% interest for the balance period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as per format
shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released along with
release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the same.
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. & As per AMC
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding GST) etc. on
material procurement or any other component for the works from any source shall be borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount shall be deducted
against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration with any other
state Govt. or institutions. Copy of registration should be attached with tender document. Tenderer who
was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources Department with
the correction slips made up to 15-08-1999 may be referred. (only English version) Clause No. -2 liquidated
damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved" by the
Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to mean as
reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of specific mention
for a particulars point / aspect, the same in the relevant Indian Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to the following
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its specifications
shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's Consultant shall not
absolve the contractor from the responsibility of replacing defective materials brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/ Architect before
using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed from the
site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for checking
lines, levels, alignment of the works & all precautionary measures during execution shall have to be kept in
sufficient numbers and in good working condition at the site of the work. All excavated trench shall be kept
covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be adopted by
the contractor shall be considered only if the contractor provided satisfactory evidence that such special
mode of construction and completion of work to the required strength and quality. Acceptance of the same
by the Engineer in charge shall not however, absolve the contractor from the responsibility of any adverse
effect and concordance of adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the "Minor Mineral
Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant Indian Standard)
shall be taken to engrave the safety of men, materials and machinery on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the quantum of
actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to be executed &
as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the contractor. The
contract agreement shall have to be executed between AMC & the agency to which work is awarded for
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of sanctioned tender
and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work order shall be issue
to contractor and the time limit shall be start from the date of issue of the written work order to the
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned tender and
resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall be issue to
contractor and the time limit shall be start from the date of issue of the written work order to the
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order / demand draft / cheque or Bank
Guarntee of nationalized bank/scheduled bank only. Contractor shall have to sign contract paper with AMC.
The contractor shall be fined 4% of interest per year for delay in submission of S.D and shall be deducted
from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by M.C. Or His
Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or specification and the
Engineer -in-charge shall make such corrections and interpretations as necessary to fulfill the intent of the
plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal Corporation. will be
payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be paid.
27. Contractor is requested to see the site physically before tendering. He is also requested to quote the rates
keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for the
construction of the works and provide a satisfactory supply of potable water for drinking, washing,
sanitation and cleaning down. The contractor will be responsible for all the costs where applicable of
connection, meter installation, water consumed, water required for testing purposes, disconnection and the
laying, maintenances and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor must make
his own arrangements with the Corporation and Electricity Supply Authorities and with other contractors to
connect and to take a supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of the
work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the work.
No compensation shall be paid for idle labor staff, machineries and for use of diesel operating sets etc. as
the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria mentioned
above along with the bid. They shall have also to submit the income tax clearance certificate and solvency
31. No advance such as secured advance machinery advance, mobilization advance or materials advance will be
32. The contractor shall get the electrical works executed through the authorized Government approved
licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by Engineer in
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby total amount of
work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so ever.
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect will be
rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No any claim
to that effect shall be entertained. The Municipal Commissioner also reserves the right to reject any or all
the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason (like site is not
available and due to unavoidable circumstances arise), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or the scope of work.
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for the work done by
the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of work should be in
proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and instructions of Add.
City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought by
him on site. This account shall be regularly maintained and kept open for inspection by Municipal Staff. Watering of
all the items shall be as per instructions otherwise no payment shall be made to contractors. Mixing of concrete
shall be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C. works if required shall have to
be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall
arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for any
damage to public. If any incident happen, during the execution of work. In case of dispute for unseen or overlooked
items the decision of the Dy. City Engineer shall be final. The contractor shall have to give site clean of all rubbish
during the work and at the time of completion of work and hand over the site with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be allowed
to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his own
arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall
be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in SOR
than based on current market rates. In case of extra item decision of Add. City Engg. shall remain final regarding
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to
carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes in
site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to prepare
the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the tenders for this
work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If
any tenderer withdraw or makes any modifications or addition in the terms and conditions of his tender not
acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any right or remedy
be at liberty to forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start shall be
recovered separately from the immediate bills payable to the contractor. Contractor has to make his own
arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can
be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building
Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
TECHNICAL SPECIFICATIONS
temNo. Excavation for foundation up to 1.5 tm. depth in all type of hard and soft soil
1 includingsorting out stacking of useful material & disposing of excavated stuff up to
tm. leadloose or soft soil, girding, lighting, fencing the trenches', and pits. (depth
measured fromGL). Etc.comp.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,concrete
and asphalt road paving work etc. Root of trees met with during excavation shall bestacked at lead of 4’
away from the trenches as per instruction so that it may not damage
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly leveled. The
excavated earth shall be stacked at any place or places shown within 50mtr. as directed. After completion
of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor lining out
and shall care to preserve the level pegs given. He shall have to arrange forshorting at his own cost if the
soil is found to be loose and sandy. He shall have to arrange forsorting out brickbats or any serviceable
materials found during excavation and shall have tostock. Nothing extra shall be paid for this. He shall
have to cart the excavated soil to site shownwithin 50 mtr. If so ordered by officer in charge of this work.
No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as per
drawing. Contractor should arrange for safely measures so that there is no danger offalling any men or
animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The contractor
should not damage any of the municipal property, water lines, electric cables etc.at the time of excavation.
Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such damages
will be recovered from him. Excavated stuff will be stacked at the siteshown or will be carted by the
contractor immediately as per the other item of this tender.Instructions of C.E. or his representative will be
strictly followed. Measurement shall be given onCmt.basis.
Excavationforfoundationupto(a)Upto0to2.0Mt(b)from2.0to3.0mtdepth(c)from3.0to
5.0mtdepth(d)above5.0mtdepthincludingsortingoutandstackingofusefulmaterialsanddisposalof
theexcavatedstuffupto50mt.lead.
Excavation shall be done as per plans and alignment in all sorts of soil including all masonary,concrete
and asphalt road paving work etc. Root of trees met with during excavation shall bestacked at lead of 4’
away from the trenches as per instruction so that it may not damage
thesidesofexcavatedtrenches.Thesidesoftrenchesshallbeverticalandbottomshallbeuniformly leveled. The
excavated earth shall be stacked at any place or places shown within 50mtr. as directed. After completion
of the work the site shall be well dressed and cleared of
allrubbishsothatitmaygivedecentappearance.Contractorshallarrangeforallmaterialsrequiredfor lining out
and shall care to preserve the level pegs given. He shall have to arrange forshorting at his own cost if the
soil is found to be loose and sandy. He shall have to arrange forsorting out brickbats or any serviceable
materials found during excavation and shall have tostock. Nothing extra shall be paid for this. He shall
have to cart the excavated soil to site shownwithin 50 mtr. If so ordered by officer in charge of this work.
No old brickbats recovered
fromexcavationshallbeallowedtobeusedbythecontractorinthework.Thedepthoffoundationwillbe as per
drawing. Contractor should arrange for safely measures so that there is no danger offalling any men or
animal in the excavated portion, otherwise he will be held responsible for
thecompensationtobepaidasthecasemaybe.Heshouldalsoarrangeforredlampatnighttimes.The contractor
should not damage any of the municipal property, water lines, electric cables etc.at the time of excavation.
Water lines, electric cables etc. coming in the way will be shifted
bycorporationbutheshouldseethatnodamageisdoneforgross negligenceonhispart,otherwise such damages
will be recovered from him. Excavated stuff will be stacked at the siteshown or will be carted by the
contractor immediately as per the other item of this tender.Instructionsof C.E.orhisrepresentative
willbestrictlyfollowed.
MeasurementshallbegivenonCmt.basis.
ItemNo.2 (a) Extra rate over item of excavation of earth for excavation of asphalt pavement /
upto0.20meterincludingdemolishingtheasphaltcarpet,metal,soiling/cuttingReinforcemente
tc. comp.withstackingthematerialasdirected.(app.rate)
(b) 0.20meterto0.30meter(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
(c) 0.30meter&above(ByBreakerMachineincludingcostofoperator,fuel,&transp
ortaion etccomplete.
Extra rate for excavation of asphalt pavement of any thickness including demolishing
theasphalt carpet, metal, soiling etc. complete with stacking the materials as directed.
Theroad surface of asphalt shall carefully be opened to full width as directed by the
Engineerin charge Asphalt, popada's spouls, metals etc shall be separately deposited in
suchplaces as may be determined by the Engineer-in-charge. In case above materials
notbeing so deposited or being mixed up with the excavated materials will not be allowed
forrefilling.Thecostofmaterialsshallbechargedfromthecontractor.Thedecisionofthe
C.E.shallbefinalandbindingtothecontractor.
Theratepersq.mt.inthisitemshallbepaidextraadditiontotherateforexcavationMode
ofmeasurement:Therate shallbefora unitofSmtBasis.
ItemNo. Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuff
3 asdirectedwithin aradiusof3km.
Refillingthepipelinetrenchedsincl.ramming,watering,consolodatingdesposalofsurplusstuffasdirectedwithina
--do--withselectedsoilbroughtfromoutsideincludingalllead
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
ItemNo. Conveyancecharge of earth ,lime,murrum, building rubbish, manual garbage,sludge
4 ,excavatedrock,flyash,aggregateofanykindetc.comp.Upto5.0Km.lead
Allthe surplusearthetc.shallbecarriedawayimmediatelyfromthesiteofworktoaplacewithin
5km.distanceorasdirectedandorderedbytheEngineer,soasnottocauseanyinconvenience to the public traffic
finding which in view of public safety and traffic convenience.The Corporation shall carry out the work
by any other agency at the contractor’s risk and cost. iftheinstructions arenotcomplied within7daysfrom
thedateoforder tocart the surplusmaterials and clear the site, the said work shall be carried out by the
Municipal Corporation attherisk
andcostofthecontractorandnoclaimordisputeshallbeentertainedinthisrespect.
If the filling in trenches after settlement of the earth filling in trenches is to be done andthe
sameshall becarriedoutby thecontractorwithout asking any extra rate. The contractorshall have to cart the
surplus earth after the trenches we will watered and refilled with the sand.The rate of carting including
carting of brick bats, metal, rubble vegetable and garbage, ifnecessarytoclearthe roadsurface.
Modeofmeasurement:-
TherateshallbeforaunitofCmtbasis
5-6 Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling,
transportingpipes to work site, unloading lowering in trnch such as cementsand, hemp
bitumen asdirected,incl.wateringthetrenchesspreadingandcartingawayofsurplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement
jointsin C.M.1:1 proportion in proper position , grade and alignment at all level as
directed byEngineer-in- charge including conveyance from stone to site of work, Jointing
materialetc.comp.
A)…………do…….(b)10 cm dia
lineB)………do ..... (c)15cmdialine,20cmline
C)……………do….(c)23cmdialine
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved qualitymake
and shall be brought on site after approval. (The pipes shall be laid in grade as
perinstruction.)Contractorshall havetoprocurebillsforstandardpipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarndipped in
hot asphalt and caulking tools. The hydraulic pressure test shall be given to thecontractor for testing pipes
and jointing. No trenches shall be filled without the approval of theengineerincharge.
Therateofthepipeworkareincludingofexcavationandrefilling.Theexcavationetc.
shallbedoneasfollows:
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on theplan and
section. In all sorts of soil including old masonary, asphalt roads and wet excavation.The sewer
excavation shall be commenced at the down stream end of the sewer and
becontinueduptothegradientasdirected.Thetrenchshallnotopenmorethan60mts.inadvanceof the completed
sewer only when directed by the engineer in charge looking to the progress ofthe work in obtaining the
formation of the bottom of the trenches the usual methods of using signrails and boning roads shall be
adopted during the whole of the process. The centre line ofuniform height shall be carried clearly on each
rail. The depth of the excavation and invert of thesewer shall be checked by means of boning road of
approved length and also by straight edge.The bed of the trench shall be well rammed before starting
laying of sewer lines and cementconcreteandmasonarywork.
Where trenches are deep in bad grounds the sides shall be supported by suitabletimbering of
shorting work looking to the nature of the soil near big or important structure, thesides of the trenches
shall be closely and securely timbered, if any settlement of the buildings inanticipated the timbering shall
be left in the ground. The various materials excavated shall beseparately stacked so that in refilling that
may be relayed on the same order as before and leastpossible damage shall be done carpet on the public
roads and private properties. Surfacecovering consisting of asphalt carpet shall be kept on side and
preserved for reinstatement. Theexcavated earth shall not be heaped near the trenches so as to caused
unnecessary obstructionalong the trenches during inspection trenches etc. shall be tunneled under only as
necessary.The side of the trenches shall be nearly vertical and plumb and red light shall be placed at
eachend at intervals and instructions and further protected by rope fence. Necessary caution
boardsshallalsobe createdandasdirectedbytheengineerincharge.
Wherever possible material excavated from the trenches of whatever kind shall not
beplacednearerthanthreemetersfromtheouteredgeoftheexcavatedtrenches.Theutmostshallhave to be taken
in refilling the trenches so that no damage may be done no sewer, no lumpshall be allowed to be put
around the sewer. The ramming of the filling shall be done and wellwatered.
The surplus earth shall be removed directed within 30 meters lead. The measurementsof the work
shall be exact length and width of the trenches as specified or as per City Engineerinstruction and depth
shall be measured vertical as per section up to invert or the pipeline. TheCity Engineer reserves the right
of extra excavation on either side if considers necessary for thesafetyofthework.
The bottom and sides of the trench shall be dressed in level and plumb in all directedbefore any
concrete is in dia. In case the excavation is done deeper than required no filling shallbe allowed to bring
the formation to proper level but contractor shall have to lay cement or
limeconcreteoffilingorotheracceptablematerialsasdirectedbytheCityEngineeratcontractorowncost so as to
come to proper formation. In case bad formations are met with the work shall haveto be done as per
instruction of City Engineer. Necessary arrangements for watering trenchesmust be provided by
contractor and without proper watering trenches will not be allowed to befiled to further Contractor shall
have to make arrangement for access to invert of the sewer andfor inspection of the work as ordered by
the engineer. If it is required to shift or after thealignment section of diameter of the pipe the contractor
shall carry out the altered work at therates quoted by him for the original work for items and contractor
shall not claim any expensesduetothe changesmade.
In no case work shall be done at night or no Sundays & other holidays and during
therecesstimeexceptinandotherholidaythecaseofbadgroundssuchasrunningsandwherethework must be
executed vigorous day night without interruption when so ordered by the engineer.All existing water pipe
storm drains sewer line railway track, electric cables etc. which do not inthe opinion of engineer required
to be changed in location shall be supported and protected frominjury by the contractor. The contractor
shall be liable to pay all damages to water-pipe, drainselectric and telephone cable and to private property
during the execution of this contract and thesame will be recovered from the running bills or the deposit of
work change location of anyexisting sewers drains etc. not otherwise from in these specification the
contractor shall do thework of making such change and the work shall be paid for as extra work. All
places utility etc.shallbekept accessibleforuse.
No extra payment shall be made for land sides and side stops done without prior approval of
theengineerincharge.
The excavation of trenches shall be done foot wider on each side of the pipe than theinside
diameter of the sewer in case of depth excavation exceeding 3 meters above invert,
onefeetwiderexcavatedoneithersidefortheupperdepthabove3metersshallbeallowedandpaidfor. Wherever
natural soil demands winder excavation the mentioned above the same shall begiven after approval of
City Engineer. The rate for excavation for easy jointing and caulkingnothing extra shall be paid for this.
Refilling of trenches shall be done only after the grade of
lineandhydraulictestpracticableofthelinesarecheckedandapprovedofandordergivenbythe
Engineerincharge.Therefillingshallbeaccompaniedbythroughwateringforlayersof0.50
mtrs. Further refilling shall be done thereafter and process should be repeated till trenches arecompletely
refilled. Temping and ramming with rammers shall have to be done at all place ofimportant work where
ordered by Engineer in charge. After order to refill the trench is give
thetrenchesshallhavetoberefilledwithin4dayswithcompletewatering.Ifthecontractorfailstodo watering
satisfactory corporation shall get it done at the risk and cost of the contractor with orwithout giving any
notice and the expenses incurred in doing so recovered from the contractoreitherincost
orfromhispaymentthroughbills.
Therateshallbepermeterbasis.
TherateperCmt.inthisitemshallbepaidextraadditiontotherateforexcavation
ItemNo. ProvidingandsupplyingISIStandardRCCpipes(ofsulphateresistingCement)instandardlengt
7-8 hs offollowing class anddiametersuitable for rubber ringjoints (socketand spigot)
including all taxes,insurance, transportation,treight charges,octroi,inspectioncharges,
loading,unloading, conveyance to departmental stores, stacking etc.
completeClassNP3Testpressure0.7Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in
properposition , grade and alignment at all level as directed by Engineer-in- charge
includingconveyancefromstonetositeofwork,labourgivinghydraulictestingasperISIcode.
(a)300mminternaldiameterB)450Mm Internal
Diameter(C)500MmInternalDiameter,(D)60
0MmInternalDiameter
TheRCCpipesshallbeprocuredasperISSforBClasstypespecificationsusingbestmaterials,first class
workmanship as per IS 458/1971 of NP2 / NP3 class as per specified in the tenderitem. The proportion of
concrete shall be one part of cement to 2 parts sand and 4 parts of blacktrap agg. mix. of suitable size to as
to produce uniform concrete through out thicknessof thepipes.
Reinforcement in form of bars straight and class wise shall be provided as per IS458 classspecifications.
RCCspunpipecollarsforthepipesshallbemadeinthesamemanner.Theinternaldiameterofthe collar shall be
sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Pipes shall be laid are fully into trenches and shall be made to rest evenly on specially preparedformation
or on concrete bed and for the purpose to extra rate shall be given making extraexcavation
forbedandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in thelength. For
each joint yarn shall be dipped in hot asphalt. The joint shall be properly cleaned
andmoisturedandthecollarshallbekeptinpositionbymeansofwedges.Semidrycementmortarofprop. 1:1 shall
be forced into joints and chaucked completely by means of special cutting toolsuntil the whole space is
full. The mortar shall be sprayed around the collar joints so as tocompletelyencasethejoint.
After the joints have thoroughly set, the Engineer or his Assistant may inspect the joints, and ifhe has any
doubt as to their soundness be may required the contractors to cut open and clearaway the cement of any
joint that he may select and to make good the same at their expensesprovided that, unless some defect be
found, they shall be required to open more than one jointsin 18mt (60’) of pipe, though if defect be found
the Engineer direct them to open as many jointsas he may deem necessary, the joints made one day will
not as a rule, be inspected until thefollowingdayandthe
cementmayhassufficienttimetosetwellbeforebeingcoveredup.
Trenches shall not be filled until alignment and levels are examined by the Engineer or
hissubordinatesandthepermissionforrefillingisgranted.
The RCC pipes shall be manufacturers as per IS for B class pipes specifications using bestmaterials first
class workmanship as per IS 458/1971.and latest IS code for R.C.C. pipe line ofNP3class.
Theproportionofconcreteshallbeonepartofcementto2partsofsandand2partsofblacktrapagg.Mixofsuitablesiz
e soastoproducingfirmconcretethoughtthicknessofthepipes.
Reinforcement on form of bars straight & cross wise shall be provided as per IS 458/ classspecifications.
RCC spun pipes collars for the pipes shall be made in same manner the internal diameter of thecollar shall
be sufficiently large to allow a perfect joint around the outside of the pipes withcement
mortarandotherplasticmaterials.
Any damaged or cracked carefully into trenches and shall be made to rest evenly on speciallyprepared
formation and for the purpose no extra rate shall be given for claming such hollows
inbendsandinthesidesofthetrenches.
All joints shall be thoroughly fitted using spun yarn of approved quality for the groove in
thelengthforeachjointdipedisnotasphaltafterthejointhasbeenproperlycleaned&moistureand
collarkeptinpositionbymeansofwedges,semi-drycementmortarprop.1;1shallbefacedinto
it and caulked completely by means of specials caulking tools until the whole space in full.
Themortarshallbesprayedoff intheformof filleraroundthepipes.
The R.C.C. NP3 pipe line shall run in perfect straight lines from manhole and shall be exactly togradient.
M/SshallbeinRMT.
Trenches shall not be filled in until the line has been tested and alignment and levels
areexaminedbytheEngineerorhissubordinatesandthepermissionforrefillingisgranted.
Contractor shall be held responsible for any damage or defect to the pipe line in satisfactoryworking of the
same for 12months after it is put into commission, contractor must satisfy
IS458/1971andIS783/1959withreferencetoRCCpipe.
ItemNo.9 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10)
forfoundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM
1:3,finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of
chamberseatcoveretc..completed.
(A) 0.60X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
(B) 0.60X0.75mt.sizeInsideClear,Depthfrom0.0to0.90meterforpipedia<=20mm.
(C) 0.75x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general
instructions.Therateincludesallnecessarymaterualsmixinglayingandremainandwateringtheexposed
facestobefinishedwithneatcementasperinstructionthechannelshallbehalfroundandas
per drawing & instruction of Engineer in charge. proper bunching shall be provided at both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyenginee
rinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item ConstructingSlabTypeM.H.ChamberOfTheFollowingSizeIncludingExcavation,Refilling,
No.10 Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
ofthickness10C.M.,finished15mmthickcementplasterinside&outside(Onlyforshaft)InCm
1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 CmC/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness
15C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway
mmdia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X
1.00Meter(InsideClear, M.H. lengthshouldbeparalleltotheflow)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)(forpipedia<=230mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
Cementusedshallbegotapprovedbytheenginreinchargebeforestartingtheworkthisshallcomplywithsp
ecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbatstobeusedforconcretemustbethoroughlywellburntandfreefromanyimpuritiesandsizefr
Thepreparationofconcreteshallbeonepartofcement5partofsand&10partbroken
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate
includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished
with neat cement as per instruction the channel shall be half round and asper drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300mmabove
thebenching. Themanhole/inspectionchamberframeand covershallbeofcast
iron of specified weight and shall conform to the requirements given in IS:1726. The covers andframes
shall be cleanly cast and they shall be free from air and sand holes and from clod shuts.They shall be
neatly dressed and carefully trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyenginee
rinchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item RatereductionoveritemofConstructingSlabTypeM.H.Chamberofsize1.00x0.75mtforconstruc
No.11 [email protected](Max.3unit\ofDM
shouldbereducedinthisitem)(AsPerR.A.BasedonBuildingSOR2015-16)
Item Constructing Slab type M.H. Chamber of the following size including excavation,
No.12 refilling,brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) in
CM 1:3,finishing with cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c
at 35cm staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M.,
includingCantering & reinforcement (double jalli at 15 C.M. c/c bothway 12 mm dia.) but
excludingthecostofManholeseatcoveretc..completed.ofSize1.00X1.40meter(InsideClear,
M.H.lengthshouldbeparalleltotheflow,forpipedia<=800mm)
1) 1.00to2.00meterdepth,(SlabatGroundlevel)
2) 2.00to3.00meterdepth,(Slabatbelow0.6mt.FromG.L.)
3) 3.00to4.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
4) 5.00to6.00meterdepth,(Slabatbelow1.00mt.FromG.L.)
5) 7.00to8.00meterdepth,(Slabatbelow1.00mt.FromG.L.)(a)Ex
cavation:ThisbedoneasspecificationinItem No.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as
requiredusingmeasursboxesforsandandcementbagof1.25cft.or1cft.asmeasuredthecasemay
be all materials shall be stacked on the site as not to obstruct tra fic in any way the masonaryshould be
constructed in proper workmanship like manner with joints plunb etc. to conform withgeneral
specification No.45 P.W.D hand book. The face work should be neatly finished.
Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
Thework shall be as per P.W.D hand book specification No.20 as per general instructions.The rate
includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe finished
with neat cement as per instruction the channel shall be half round and asper drawing & instruction of
Engineer in charge. proper bunching shall be provided at both of thechannel.
(e) Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkorasdirectedbyengineer
inchargeorAdditionalCityEngineer(zone)
Modeofmeasurement:
Therateshallbeforaunit ofonenumberbasis.
Item ExtrarateoveritemofConstructingSlabTypeM.H.Chamberoffollowingsizeforconstructing
No.13 M.H. Chamber, per 1.00 Decimetre of additional depth or part thereof.
etc.complete.Ofsize1.00x1.40mt.(insideclear)andDepthfrom
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Item Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x
No.14 mtfor constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt
for(MHabove3.0mtdepth)belowGroundLevel(Max.5unitof DMshouldbereducedinthis
Modeofmeasurement:
Therateshallbeforaunit ofDMbasis.
Item Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
No.15 manholeof following size incl. excavation, refilling and & finished 15 mm thick cement
plasterinside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggeredinmasonryCM1:5,incl.costofRCCSlabinCC1:1.5:3,includingCantering&reinforce
ment as directed by engineer in charge. Rate includes carting of debris andexcavated soil
1) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalliat15C.M. c/cbothway10mmdia.)From0to2mtdepth(SlabatGroundlevel)
2) 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement
(Singlejalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slabatbelow
1.00mt.FromG.L.)
3) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 0 to 2 mt depth(Slab atGround level)
4) 1.40x 1.00 mt(insideclear)RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab atbelow1.00mt.
5) 1.40x 1.00 mt(insideclear) RCC Slab of thickness 23 CM & reinforcement(double
jalli at 15 C.M. c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab atbelow1.00mt.
(a) Excavation:ThisbedoneasspecificationinItemNo.1,
(b) BrickbatsCementConcrete:-
:Cement used shall be got approved by the enginre in charge be fore starting the work
thisshallcomplywithspecificationingeneral.
SandtobeusedshouldcomplywithspecificationofP.W.D.handbookingeneral.
Brickbats to be used for concrete must be thoroughly well burnt and free
fromanyimpuritiesandsizefrom 20to25m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part brokenbrickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for
mixingandmixedproperlyonwoodenorspeciallyproparedplatformuntileverypartofthebrockbatsissuffice
ntlycoatedwithmortar.
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20kms. in
thickness and be well and quickly rammend with heavy rammers, until mortarcreams up to surface.
The surface must be kept damp during and after consolidation & inlaying consecutive layer the lower
coars should be well watered & mode lough be for thenextisplaced.
(c) Brickworkwithcementmortar.
Brickshallbetablebricksofapprovedcleanconformingwiththespecificationaslaiddownin P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be gotapprovedbytheEnginurin
chargebefore theworkisstarted.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specificationscement
mortar for the brick work shall be one parts of cement to six part of sand every brick wellsoaked in water
is required to be ladi in joints of cement mortar the thickness of which shall notexceed paints of 1.25 cm If
after removal of centering any open joints are founed these shall bepointedimmedately.
Special care shall be taken to make the faces of brick work smooth brick work mar
betoothedorshallberackedbackincourse.
Allintradosofcursebeworkedfromcompetestricklymadetodimensionsandgrade.
Brick work in general shall be of first class workmanship and shall be excuted according toplan
working to the proper dimension & as directing by the officer in charge from the time to
timebricksshouldbethroughlyinwaterbeforeuse.AllbricksshallIhavetobecleanedwaterbeforelaying cement
mortar shall be prepared in special iron pans and mixed in quantites as requiredusing measurs boxes for
sand and cement bag of 1.25 cft. or 1 cft. as measured the case maybe all materials shall be stacked on the
site as not to obstruct tra fic in any way the masonaryshould be constructed in proper workmanship like
manner with joints plunb etc. to conform withgeneral specification No.45 P.W.D hand book. The face
work should be neatly finished. Theworkshallbekeptwaterdforworkatleastafterdateof completion.
(d) C.C.channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts ofcement 2 parts
of sand 4 part of aggregates of black trap metalof other approved material ofsizesfrom
0.6to2.5cm.wellgradedasperinstructions.
TheworkshallbeasperP.W.DhandbookspecificationNo.20aspergeneralinstructions.
The rate includes all necessary materuals mixing laying and remain and watering the exposedfaces tobe
finished with neat cement as per instruction the channel shall be half round and asper drawing &
instruction of Engineer in charge. proper bunching shall be provided at both of thechannel.
(e)Cementplaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts ofsand in
uniform thickness with surfaces truely in plumb. The work in general shall comply withgeneral specifi
cations for )plaster no.64.P.W.D. hand book plastered surface shall kept damp atleastforfortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cementplaster.
Manholeshallbeprovidedateverychangeofalignment,gradientordiameterofsewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together inmanhole as far as possoble. The
maximum distance between inspection chambers shall beabout 25 meters. Where the diameter of
sewer/drain is increased, the soffit of the pipe shall
befixedatthesamelevelandnecessaryslopegiventothechannelofmanhole/inspectionchamber.Theminimumint
ernalsizesofmanhole/inspectionchambershallbe aspertherespective item of work. The manhole/inspection
chambershall be constructed as
perthedetaileddrawingsandasdirectedbyEngineer.Thebedconcreteandthebrick
masonryshallbeconstructedofsuchthicknessasshownondrawing.Thebrickmasonryshallbeconstructedin
C.M. (1:5), plastered on both faces inside and out side with 15 mm cement plaster in C.M. (1:3).The
channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.Above the
horizontal diameter, the sides shall be extended vertically to the same level as thecrown of the outgoing
pipe and the top edge shall be suitable rounded off. The branch channelsshall also be similarly constructed
with respect to the benching out at their junction with the mainchannel as appropriate fall suitable rounded
off in the direction of flow in the main channel
shallbegiven.Thechannelatthebottomofmanhole/inspectionchambershallbeplasteredwith
C.M. (1:3) and finished smooth. Rungs shall be provided in all manholes/inspection chambersover 0.6 mtr
in depth and shall be of cast iron conforming to IS:5455. These rungs shall be
fixedstaggeredintwoverticalruns,300mmaparthorizontallyand300mmc/cvertically.Thetoprungshall be
mm below the manhole/ inspection chamber cover and the lowest not more than300 mm above the
benching. The manhole/inspection chamber frame and cover shall be of castiron of specified weight and
shall conform to the requirements given in IS:1726. The covers andframes shall be cleanly cast and they
shall be free from air and sand holes and from clod shuts.They shall be neatly dressed and carefully
trimmed. All castings shall be free from voids
whetherduetoshrinkage,gasinclusionorothercauses.Coversshallhavearaisedchequereddesignonthe top
surface to provide an adequered nonslip grip. Cover shall be capable of easy
openingandclosinganditshallbefittedintheframeinworkmanshiplikemanner. Thecovershallbegastight and
water tight. The size of covers specified shall be considered as the clear
internaldimensionsoftheframe.Coversandframesshallbecoatedwithablackbituminouscomposition. The
coating shall be smooth and tenaceous. The frame of manhole/inspectionchamber cover shall be firmly
embeded to correct alignment and level in cement concrete on thetop of the masonry. The item shall be
executed as per the detailed drawing and as directed byEngineer.
DesignandDetailsofReinforcementfortheslabshallbeapprovedbeforecastingworkor
asdirectedbyengineerinchargeorAdditionalCityEngineer(southzone)Modeofmeas
Therateshallbeforaunit ofonenumberbasis.
ItemNo. Provdg.&layingS.W.Gullytrapwithbrickmasonry chamber &
16 watertightG.T.StoneincludingfixingofcoverSquaremouthtrap100mmx100mmsizeP-
ConstructingGullyTrapChamberWithMasonryInCementMortar1:5&PlasteringInCementMortar1:3Usin
gG.T.StoneIncl.FixingCoverEtc.CompletedAsDirected.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Making connection to the ex. M.H.in running sewer incl. Dewatering and otherrequired
17 machinery etc. of following dia pipes at any convenient time. All damaged
workshallbewellrepaired asperinstructions. etc..complete.
Rateincludesconnectioninthesewerlineatanyconvenienttimewhentheloadonthedrainageline in less. All
damaged work shall be well repaired as per instruction of officer in charge.Proposed R.C. C. line should
be connected with the existing M.H. as directed. Holes made inthe well of existing M.H. should be
finished smooth and in circular shape as directed. Rate alsoincludes making new channel or repairing
existing damaged channel if instructed. Rate isinclusiveofwateringetc.as directed.
Modeofmeasurement:
Therateshallbefor aunitofNosBasis
ItemNo. Cutting the pipes of following dia coming in the new M.H.in
18 runningsewerincludingcuttingbars,includingremoving debris /silt from the M.H. and
carting at a suitabledistance etc..complete as directed. No payment for M.H. work will be
made until pipe isnotcutcompletelyinall respect.
ng in the new M.H. in running sewer of any dia pipes at any convenient time when M.H. is
foundemptyalldamageworkshall bewellrepairinstruetionsetc.comp.
material shallbe cut as pes requirement to Cutting thepipe in existing manhole reinforcementbars shall also
have to be cut in existing manhole as per requirement and making good thesame. the dis mental materials
shall be carried ti placesat all lead as directed by engineer
inchargeIfdirectedtheworkshallhavetobedoneatnightthemeasurementshallbeaspernos
Modeofmeasurement:
herateshall beforaunitofNosBasis
Item Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in
No.19- C.M.1:5andplasterinC.M.1:3andfixingC.I.stepsandM.H.andcartingthesameasdirected.A)…
B) ………………do ......................... Upto0.35mt.(@Fourcoarse)
C)………………do…………………Upto0.65mt.(@Sevencoarse)D)…
RepairingdamagedI.C./Raisinremovingdamagedbrickworkandrepairingbybrickmasonr
y in C.M. 1:5 and plasterinC.M.1:3andfixingC.I. steps and existingchamber sheet
cover,removing the debris from chamber andcartingthesameasdirected.
Required level shall be achieved in brick work as specified including plaster, the thickness ofjoints shall
not exceed 10 mm (3/9”). In no case the frame shall be supported by chips or brokenbrickorasphaltmix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface ofan
asphalt road/concrete pavement. The frame shall be bedded in cement mortar on the
brickworkwithsplayedfillerall around.
Water:Gullyframesbeingontheedgeofroadshallbefixedtothecorrectroadlevelatitsupperendandtheslopeshoul
dbesuchitmustbeabout(12mm)(1/2”)lowerthanwatertable.
A concrete pavement should be case around the frames and covers of man-holes,chambersetc.
incaseof asphlaticroad.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) asspecified and
directed. The pavement shall be at least 8 mm (3”) wider than the outer most edgeof the circular frame no
pavement will be made of this pavement under the item of cementconcrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) inexternal
measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the
longerdimensionbeingalongthedirectionofthemain.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C.No
payment will be made for the pavement should be at least 8 cm (3”) wider than the
outermostedgeoftheframe.
After removing the top portion of the manholes, the proper brick masonry layer with c.m.(1:4)
should be constructed for proper bondage with old masonry and 8 cms thick PCC work(1:2:4) should be
laid on the top of brick layer an up to the bottom of the seat. After fixing
theseatthemanholeshouldbeproperlyleveledwithroadlevel.
Filling with cement concrete the spaces around the manholes, chambers, etc. shall
becleanwithin48hoursofconcretingday.
M/SshallbegivenonNobasis.
ItemNo. RCC Precast M.H.Frame & Cover Manufacture, supply & Delivery at store or at side
21 ofwork Precast RCC M200 Frame & Cover Suitable to drainage M.H. and as per type
design&DrawingincludingcostofreinforcementM.S. AnglesorFlat,cutting moldworketc.
FrameSuitablefor50CmopeningofMHCo
verSuitablefor50CmOpeningOfMH
FrameSuitablefor50CmopeningofMHCo
verSuitablefor50CmOpeningOfMH
3) HouseconnectionChamberLightDutyFr
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to
22 matchexisisting road level in C.C. 1:2:4andfinishing smooth, watering and protectingfor
7days etc. complete as directed. M.H. seat cover will be supplied byA.M.C.(from anystore)
Carting and Fixing M.H., Chamber or CatchpiteSeat and Cover in line and level to matchexisisting
road level in C.C. 1:2:4 and finishing smooth, watering and protectingfor 7 days
etc.completeasdirected.M.H.seatcoverwillbesuppliedbyA.M.C.(fromanystore)
Modeofmeasurement:-
Therateshallbeforaunitofonenumberbasis
ItemNo. ProvidingKachhaOfPakkaDummyIn The Following Dia Pipes And Removing
23 TheSameAfterTheConnectionOfTheWorkAs Directed.
Providing kachcha or pakka dummy in the following dia pipes and removing the sameafter the
connecting of the work as per instruction of engineer in charge. If kachcha or pakkadummy is not
removed by the contractor then the penalty shall be laid as per municipal rules orderived
bythemunicipalcorporationofficer'sin-charge.
Measurementsshallbegivenonno.basis.
ItemNo. Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for
24 existingEHD-35 FRC MH cover, rate also incl. loading, unloading and fixing the frame in
line andleveltomatch exisisting road level in CC1:2:4and finishingsmooth,
wateringandprotectingfor7days etc.completeasperinstructionbyengg.incharge.
Providing and fixing cast iron manhole frame of weight 80 to 85 kg suitable for existing EHD-35FRC MH
cover, rate also incl. loading, unloading and fixing the frame in line and level to matchexisisting road level
in CC 1:2:4 and finishing smooth, watering and protecting for 7 days
etc.completeasperinstructionbyengg.incharge.
MeasurementsshallbegivenonKgbasis.
ItemNo. Raising of Existing manhole item includes,cutting of existing road surround by
25 Manholeby diamond cutter machine dismantling of road in confined area by breaker
andcartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanhole
at road level in CM 1:3 item also included fixing of Manhole frame at exact roadlevel by
using MaserEmaco S 488 trowable fibre reinforced thixotropic repair mortalmaterial
Laying of concrete made form Master Emaco 5 346 flowable micro concretematerial in
desired thickness and laying of hot bitumanous material in Upper layer andcompaction of
hot bitumanious material by palte compactor machine .Rate also
includednecessaryplasteratinsideofmanholeinCM1:3in20MMthicknessonraisedbrickwork.
Raising of Existing manhole item includes,cutting of existing road surround by Manholeby
diamond cutter machine dismantling of road in confined area by breaker machine and
cartingofdismantalmaterial.itemalsoincludednecessareybrickworktoraisethemanholeatroadlevelinCM1:3it
emalsoincludedfixingofManholeframeatexactroadlevelbyusingMaserEmacoS488 trowable fibre
reinforced thixotropic repair mortal material Laying of concrete made formMaster Emaco 5 346 flowable
micro concrete material in desired thickness and laying of
hotbitumanousmaterialinUpperlayerandcompactionofhotbitumaniousmaterialbypaltecompactor machine
.Rate also included necessary plaster at inside of manhole in CM 1:3 in
20MMthicknessonraisedbrickwork.
Measurementsshallbegivenonno.basis.
ItemNo. Brickworkusingcommonburntclaybuildingbrickshavingcrushingstrengthnotlessthan35kg/
26 Sq.cm.incementmortar1:5(1cement:5finesand)
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-
6.Brickshall conformtoM-15Cementmortarshall conformtoM-11.
Theproportionofthecementmortarshallbe1:6(1cement:5finesand)byvolume.
Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean waterfor
about two hours before use or as directed. The cessation of bubbles, when the bricks
arewettedwithwaterisanindicationofthroughwettingof bricks.
BricksshallbelaidinEnglishbondunlessdirectedotherwise.Halforcutbricksshallnotbeusedexcept when
necessary to complete to bond; closer in such case shall be cut to required sizeandusedneartheendsofwalls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brickshall first
be properly bedded and set home by gently tapping with handle of trowel or
woodenmallet.Itsidefaceshallbeflushedwithmortarbeforethenextbrickislaidandpressedagainst
it.Oncopletionofcourse,theverticaljointsshallbefullyfilledformthetopwithmortar.
Thewallsshallbetakenuptrulyinplumb.Allcoursesshallbelaidtrulyhorizontalandallverticaljoint shall be truly
vertical. Vertical joints in alternate course shall generally be directly one overtheother.Thethicknessof
brickcourseshallbekeptuniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges,mason’s
sprit level, square half meter rub, and pins, string and plumb shall be kept on the site ofworkforfrequent
checkingduringtheprogressofwork.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All
theconnectedbrickworkshallbekeptnotmorethanonemeterovertherestofthework.Wherethisis not possible,
the work shall be raked back according to bond (and not left toothed) at an anglenot steeperthan45degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to
bebuiltinwallshallbeembeddedincement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall notexceed
mm. The face joints shall be raked out as directed by taking tools daily during theprogress of work, when
the mortar is still green so as to provide key for plaster or pointing todone.
The face of brick shall be cleaned the very day on which the brick work is laid and all
mortardroppingremoved.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all thefaces for a
period seven days. The top of masonry work shall be kept well wetted at the close oftheday
Preparationoffoundationbed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared ofall loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid onconcrete footing, the top
of concrete shall be cleaned and moistened. The contractor shall obtainthe engineer'’ approval for the
foundation bed, before foundation masonry is started. Whenpuccas flooring is to be provided flush with
the top to plinth, the inside plinth offset shall be
keptlowerthantheoutsideplinthtopbythethicknessoftheflooring.
Modeofmeasurementsandpayment:
Themeasurementsofthisitemshallbetakenforthebrick masonryfullycompletedinfoundationuptoplinth.
Thelimitingdimensionsnotexceedingthoseshownontheplansorasdirectedshallbefinal.Battered, tapered
andcurvedportionsshallbemeasurednet.
No deduction shall be made from the quantity of brick work nor any extra payment made forembedding in
masonryormakingholesinrespectoffollowing items:
Endsofjoints,beams,posts,girders,rafters,purlins,trusses,corbelstepsetc.wherecrosssectionalareadoesnotexce
Openingnotexceeding1000Sq.cm.
Wallplatesandbedplates,bearingofslabs,chhajasanthelikewhosethicknessdoesnotexceed10Cms.and
thebearingdoesnotextendto thefullthicknessofwall.
Drainageholes,andrecessesforcementconcreteblockstoembedholdfastsfordoors,windowsetc.
Ironfixtures,pipesupto300mmdiaholdfastsanddoorsandwindowsbuiltintomasonryandpipesetc.forconcealed
Formingchasesofsectionnotexceeding350Sq.Cm.inmasonry.
Aperturesforfireplacesshallnotbedeductednorshallextralabourrequiredtomakesplayingofjambs,throatingand
makingArchesovertheaperturebepaidforseparately.
Therateshallbeforaunit ofonecubicmeter.
ItemNo. Supplying,labourforbreakdownrepairingworkforactivitieslikeexcavation,disliting,removing
27 debrisfromtrenchbackfillingetc.comp.asdirectedbyEng.incharge.
1) Mazdooratday/Night
2) Makadam/supervisionatday/NightM
odeofmeasurement:
TherateshallbeforaunitofNoBasis.
ItemNo. ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequiredthickne
28 ss and size including placing the nece. supports of reqd. size, nailing, fixing withmortar,
levelling. All specification for dead centring as per standard engg. practice etc.comp.
ProvidingDeadCanteringusinggoodqualityCountryWoodPlanks,wallPlateofrequired thickness and
size including placing the nece. supports of reqd. size, nailing, fixing withmortar, levelling. All
specification for dead centring as per standard engg. practice etc. comp. asdirected.
Therateshallbefor aunit ofSmtBasis
ItemNo. Providing15mmthickcementplasterinsinglecoatonRough(Similar)sideofsingleorhalfbrickw
29 allsforinteriorplasteringuptofloortwolevelandfinishedevenandsmoothin
(i)Cementmortar1:3(1-cement:3-sand)finishingwithafloatingcoatofneatcementslurry.
WaterM-1.TheCementmortarofproportion1:3shallconformtoM-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound.These shall
be properly examined before erection and use Stage scaffolding shall be providedforceilingplaster,
whichshall beindependent ofthewalls.
Preparationofback-ground:
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescenceand other
foreign matter by water or by brushing. Smooth surface shall be roughened by wirebrushing if it is not
hard and by racking if it is hard. In case of concrete surface, if a chemicalretarder has been applied to the
form work, the surface shall be roughened by wire brushing andall the resulting dust and loose particles
cleaned off and care shall be taken that none of
theretarderisleftonthesurface.Trimmingofprojectionsonbrick/concretesurfacewherenecessaryshallbecarried
outtogetanevensurface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for
sufficientperiodbeforecarryingout theplasterwork.
The work shall not be soaked but only damped evenly before applying the plaster. If the
surfacebecomesdrysuchareashallbemoistenedagain.
Forexternalplaster,theplasteringoperationshallbestartedfromtopfloorandcarrieddownwards. For internal
plaster, the plastering operations may be started wherever the buildingframe and cladding work are ready
and the temporary supporting ceiling resting on the wall
ofthefloorhavebeenremoved,Ceilingplastershallbecompletedbeforestartingplastertowalls.
ApplicationsofPlaster:
Theplasterabout15x15cms.Shallbefirstappliedhorizontallyandverticallyat notmorethan2metre intervals
over the entire surface to serve as gauge. The surfaces of these gauges shall betruly inplane of the finished
plastered surface. The mortar shall then be applied in uniformsurface slightly more than the specified
thickness, then brought to a true surface by working
awoodenstraightedgereachingacrossthegaugeswithsmallupwardandsidewaysmovementata time. Finally,
the surface shall be finished off true with a trowel or wooden float according as asmooth or a sandy
granular texture is required. Excessive trowelling or overworking the floatshall be avoided. All corners,
arrises, angles and junctions be truly vertical or horizontal as thecase may be and shall be carefully
finished. Rounding or chamfering corners, arrises junctionsetc.shallbe
carriedoutwithpropertemplatestothesizerequired.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plasterwhich
ispartiallysetshallberejectedandremovedforthwithfromthe site:
In suspending the work at the end of the day, the plaster shall be left out clean to the line bothhorizontally
and vertically. When recommending the plaster, the edges of the old work shall bescraped clean and
wetted with cement putty before plaster is applied to the adjacent area toenable the two to properly joint
together. Plastering work shall be closed at the end of the day onthe body of the wall and nearer than
cm. To any corners or arrises. Horizontal joints
inplasterworkshallnotalsooccuronparapettopsandcopingsastheseinvariablyleadtoleakage.Noportionofthesu
rfaceshallbeleftoutinitiallytobepackeduplateron.
Eachcoatshallbekeptdamcontinuously tillthenextcoatisappliedorforaminimumperiodof7 days. Moistening
shall commence as soon as plaster is hardened sufficiently. Soaking of wallsshall be avoided and only as
much water as can be readily absorbed shall be used excessiveevaporation onthesunny
orwindwardsideofbuildingin hot airordry weather shall beprevented by handling mattings or gunny bags
on the outside of the plaster and keeping themwet.
Modeofmeasurement&payment:
The rate shall include the cost of all materials, labour and scaffolding etc, involved in
theoperationsdescribedunderworkmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth orheight
shallbemeasuredcorrecttoacentimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open jointsin brick
work, stone work etc. or space between laths. Thickness of plaster shall be averagethicknesswithminimum
10mm.atanypointonthissurface.
Thisitemincludesplasteringuptofloortwolevel.
The measurement of wall plastering shall be taken between the walls or partition (dimensionsbefore
plastering being taken) for length and from the top of floor or skirting to ceiling for height.Depthof
coverof cornicesif anyshallbededucted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measuredseparately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints,beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openingsexceeding 0.5 sq.mt. and
not exceeding 3.0 sq. mt. in each area deductions and additions shallbemadeinthefollowingmanner:
No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5sq. mt. each
and no addition shall be madefor reveals, jambs, soffits, sills etc. of these openingforfinishtoplasteraround
endsof joints,beams,postsetc.
Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made
asfollowsandnoadditionshallbemadeforreveals,jambs,soffitsetc.sillsetc.oftheseopenings.
When both faces of all wall are plastered with same plaster,
deductionshallbemadeforonefaceonly.
When two faces of wall are plastered with different types of plasters or ifone
faces is plastered and the other pointed, deductions shall be made from the plaster orpointing on the side
of frame for door, window etc. on which width or reveals is less than that
ontheothersidebutnodeductionsshallbemadeontheotherside.Wherewidthofrevealsonbothfaces of all are
equal, deductions of 50% of area of opening on each face shall be made fromareaof
plasterand/orpointingasthecase maybe.
For openings having door frames equal to projecting beyond the thickness of wall, full
deductionforopeningshallbemadefrom eachplastered faceofthewall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening butjambs,
soffitsandsillsshallbemeasured.
The rate shall be for a unit of one sq.
metre.finishingwithafloatingcoatofnetcementslurr
y.Materials &Workmanship:
Thisworkisonlyofprovidingsmoothcementfinishwithfloatingcoatofneatcementslurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be appliedto the
plastered surface with a trowel to provide uniform texture while the base coast is stillplastic.
In any continuous face of wall the finishing treatment should be carried out continuously and
daytodaybrakedmadetocoincidewitharchitecturalbreaksinordertoavoidunsightlyjunctions.
Curing:Alltheplasterworkshallbekeptdampcontinuouslyforaperiodof7days.
Modeofmeasurements&payment:
Thepaymentshallbemadeforaunit of 1.0sq. mt. ofworkdone overandabovethe finishingofworkof base coat.
Therelevantspecificationsofitemofbasecoatshallbefollowedformeasurements andpayment.
Therateshallbeforaunit ofonesq.metre.
ItemNo. Supplying cutting, bending, binding and placing in position steel as per plan and
30 designand as per IS 2502 including cost of steel and binding wire for reservoirs/
structuresonlyincluding lift up to 6 meter height or depth below GL for all diameters TMT
bars Fe-415gradeforalldiameters
The scope of work consists of providing and laying mild steel reinforcement and TMTCRS Fe-
500 reinforcement for RCC works of various components of the structure. This may
beTiscooranyotherapprovedmanufacturerbranchandcorrosionresistantsteelbarsapprovedbythe Engineer
Incharge. This includes cuttings, bending, binding, placing, with all equipments andlabour required for the
work as directed by the City Engineer, Ahmedabad and all operationscovered
withintheintentandpurposeofthespecification.
BeingofReinforcement
Reinforcingsteel shall conform accurately to the dimensions shown on relevant
drawingsandconformingtotherelevantIScodes(latestrevision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the CityEngineer,
AMC, Ahmedabad using a proper bar bender, operated by hand or power to attainproperradiiofbends.
Barsshallnotbebentorstraightenedinamannerthatwillcauseinjurytothematerial.
Bars bent during transport or handling shall be straightened before being used on
work;theyshallnot beheatedtofacilitatebending.
ThebendingoftheTMTbarsshallbecarriedoutasperthefollowing:
S.No Operation Size TMTCRS-Fe-500
1 Bend Upto22 mmdia 3d
Over22 mmdia 4d
2 Rebend Upto10mmdia 4d
Over10 mmdia 5d
PlacingofReinforcement:
Allreinforcingbarsshallbeaccuratelyplacedintheexactpositionshownonthedrawings, and shall be
securely held in position during placing of concrete by annealed bindingwire not less than 1 mm in size
and conforming to IS:280 and by using stays blocks or metalchairs, spacer, metal hangers, supporting
wires or other approved devices at sufficiently closeintervals. Bars will not be allowed to sag between
supports nor displaced during concreting orany other operation over the work. All devices used for
positioning shall be of non-corrodiblematerial. Wooden and metal supports will not extend to the surface
of concrete, except
whereshownonthedrawings,placingbarsonlayersoffreshlylaidconcreteastheworkprogressesforadjusting bar
spacing will not be allowed. Pieces of broken stone, brick or wooden blocks shallnot be used. Layers of
bars shall be separated by spacer bars, precast mortar blocks or otherapproveddevices.
Reinforcement after being placed in position shall be maintained in a clean
conditionuntilcompletelyembeddedinconcrete.Specialcareshallbeexercisedtopreventanydisplacementof
reinforcementinconcretealreadyplaced.
To protect reinforcement from corrosion, concrete cover shall be provided as indicatedon the
drawings. All bars protruding from concrete to which other bars are to be spliced andwhich are likely to
be exposed for an indefinite period shall be protected by a thick coat of neatcement grout.
In the case of columns and walls, vertical bars shall be kept in normal position
withtimbertemplateshavingslotsaccuratelycutinforbarposition.Suchtemplatesshallberemovedaftertheconcr
eting hasprogresseduptoaleveljustbelowthem.
Barscrossingeachother,whererequired,shallbesecuredbybindingwire(annealed)ofsize not less than
1 mm and conforming to IS;280 in such a manner that they do not slip overeach other at the time of fixing
and concreting. As far as possible, bars of full length shall beused. In case this is not possible, overlapping
of bars shall be done as directed by the CityEngineer, AMC, Ahmedabad. When practicable, overlapping
bars shall not touch each other, butbe kept apart by 25 mm or 1 ¼ times the maximum size of the coarse
aggregates whichever isgreater, by concrete between them. Where this is not feasible, overlapping bars
shall be boundwith annealed steel wire, not less than [1 mm thickness twisted tight in eight shape around
thelappedbars.Theoverlapsshallbestaggeredfordifferentbarsandlocatedatfixedlocationsonlyalongthespanwh
ereneithershearnorbeingmomentismaximum.
WeldingofTMTbarscanbepermittedifspecifiedonthedrawings,jointsofreinforcement bars shall be
butt welded so as to transit their full strength. Welded joints shallpreferably be located at points where
steel will not be subject to more than 75 percent of
themaximumpermissiblestressesandweldssostaggeredthatatanyonesection,notmorethan
33 per cent of the rods are welded. No –pre-warning or post heat treatment is necessary.Interpass
temperature should be limited to 200º C with low heat input and equivalent strength lowhydrogen type
electrode. Suitable means shall be provided for holding the bars securely inposition during welding. It
must be ensured that no voids are left in welding and when welding isdone in 2 or 3 stages, previous
surface shall be cleaned property. Ends of the bars shall becleaned of all loose scale, rust, grease, paint
and other foreign matter before welding. Onlycompetentweldersshallbeemployedonthework.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from theactual site and
their number and frequency of tests shall be as directed by the City Engineer,AMC, Ahmedabad.
TheTMTbarsshallbetestedforanyorallofthefollowingtestsasdirectedbytheEngineerIncharge
Alternate immersion testSalt
testAtmosphericexposuretest
Sulphur dioxide
testPotentiodynamictest.
ItemNo. Provdg. & laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
31 stoneaggregates20mmnominalsize)andcuringcompleteexcludingcostofformworkandreinfo
rcementforreinforcedconcreteworkin
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.Stone
aggregate 20 mm. nominal size shall conform to M-12.Cement concrete 1:2:4proportion measured by
volume shall conform to relevant specification or ordinary grade1:2:4concrete.
The cement concrete flooring of 50 mm. thick (average) is to be laid as per the sitecondition. The
concrete shall be mixed in a mechanical mixer at the work. Hand
mixermayhoweverbeallowedforsmallerquantitiesofworkandincaseoffailureofmachinesor as permitted by
the engineer-in-charge. It shall carried out on a water tight platformand care shall be taken to ensure that
mixing is continued until the mass is uniform incolourand consistency.Howeverin such cases 10% more
cement than otherwiserequiredshallhavetobeusedwithoutanycost.Themechanicalmixingshallbedone
foraperiodof1/to2minutes.Thequantityofwatershallbethussufficientofproducea
dense concrete required workability for the purpose. Flooring of specified thickness
shallbelaidinaccordancewithapprovedpatternorasdirected.Finishingoperationshallstartshortly after
the cessation of beating and shall be spread over a period of one to sixhoursdepending upon the
temperature and atmospheric conditions. The surface shallbe left for some time till moisture
disappears from it. Fresh quantity of cement shall bemixed with water to form a thick slurry and
spread over the surface while the concrete isstill green. Use of dry cement or cement and sand
mixture sprinkled on this surface tostiffen the concrete or absorb excessive moisture shall not be
permitted. The cementslurry shall than be properly paste twice by means of iron flats, once, when
the slurry isapplied and the second time when cement starts setting and finished smooth.
Thesurface shall be marked with string or B.R.C. fabric jali to make the surface non slipperyas
and when directed. The junction of floors with wall plaster dado or skirting shall berounded
where so required upto 25 mm. radius. Flooring in lavatories and bath
roomsshallbelaidafterfixingofwaterclosetandsquattingpansandfloortraps,whichshallbeplugged
while laying the floors and opened after the floors, are completed. Any
damage,donetowatersupplysanitaryfittingsduringtheexecutionofworkshallbemagegood.
Afterthefinalset,theconcreteshallbekeptcontinuouslywet,ifrequiredpondingfora
periodofnotlessthan7daysfromthedateofplacement.
The form work shall be provided if necessary as directed by the engineer in charge.Concreting shall be
done as per alternate bay method with necessary centering witherbymasticorcementmortarasdirected.
Modeofmeasurement&payment:
The rate shall include the cost of all material and labour involved in all the operationsdescribed above.
No deduction shall be made or extra paid for any opening upto
sq.metreinareainthefloor,nothingextrashallbepaidforlayingtheflooratdifferentlevelsinthesameroomor
TherateshallbeforunitofoneCmt
ItemNo. Providing and installation of barricading with retro-reflective paint/ film/ tapes
32 (Minimum3.0Mt. height) as specified in the drawing & specifications for the construction
of roadwork, along with necessary diversion arrangement for existing traffic movement in
anunobstructedcondition,allrelevantmarkings,signboardsandilluminationasperrelevantM
ORT&H specification. Precoatedgalvanisedironprofilesheets shallbe ofapproved make
and shade having 0.50 mm (+0.05 %) total coated thickness with zinccoating 120 grams
per sqm as per IS: 277, in 550 mpa steel grade, 5-7 microns epoxyprimeronbothside ofthe
sheetandpolyestertopcoat 15-18microns.Rate tobeinclusive of all materials, fabrication
works, paint works for information (retro reflectivepaint), foundation works,
transportation, loading, unloading, installation, dismantling andinclusive of all taxes and
including the same design for providing openable gates.
Noextrarentalwillbegiventothecontractorincaseofany delaysfromhispartforconstruction or
due to any valid time limit extensions. Each barricading sheet is to
benumberedwithauniquenumber.Thebarricading providedshallberetainedinpositionat
sitecontinuouslyi/cshiftingofbarricadingfromonelocationtoanotherlocationasmany
times as required during the execution of the entire work till its completion. Rate
includeits maintenance for damages, painting, all incidentals, labour materials,
equipments andworks required to execute the job. The barricading shall not be removed
without priorapproval of Engineerin- Charge. (Note :- One time payment shall be made for
providingbarricadingfromstartofworktillcompletionofworki/cshifting.Thebarricadingprovi
ded shall remain to be the property of the contractor on completion of the work).Blinkers
are to be installed on the barricading and rate for blinkers will be payable as
perrelevantitem. Barricadingisto becleanedbymeansof
Modeofmeasurements&payment:
TherateshallbeforaunitofRmt
ItemNo. Barricading theentirebreakdownorexcavatedareaon rentalbasisusingwoodenballies
33 / M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board
outside to avoid accident & for smooth traffic diversion & movement including
cautionaryboard etc. Item also includes for making temporary sufficient nos of lighting
arrangementthrough out the work with necessary required arrangement. ..The same shall
be removedaftercompletion ofwork.
Modeofmeasurements&payment:
TherateshallbeforaunitofRmt
ItemNo. Manufacturing,and supplaying steel vantilation colums 15 cms dia medium class
34 pipewith 60 x 60cm 20 mm thick base plate and stiffeners C.I ormamental cap 50 Kg
andnecessarey foundationnut bolts with one coat or red lead oxide paint etc as per
drawingand carting to theworksiteetc.
Modeofmeasurements&payment:
Therateshallbefor aunitofNos
ItemNo. Labour charges for erecting steel ventilation colums 15 cms dia with ornamental
35 capsafety with the help of reqyuired capicity of hydra crane and base fixed with
necessareyfoundation with coat or lead oxide paint and two coat of any approved colour
with 15 cmsdia stone ware of RCC pipe connecting with MH including excavation and
jointing asrequired etc.
Modeofmeasurements&payment:Therat
e shallbeforaunitofNos
ItemNo. Providing and operation dewatering Pump including fuel charges & operator Charges
36 etc.asdirected etc.comp. (ShiftforEightHour)(ForEachPumpSet)
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Hiring and operating Mud Pumps incl. Cost of fuel and operator including the cost
37 oftoand fro transportation, laying of the delivery hoses as required, lowering and
liftingthe pumps as and when required etc. complete. Set Do As Directed. (No
paymentshouldbeallowedfornonworking conditionofmachinery)
Modeofmeasurements&payment:
TherateshallbeforaunitofHP/Hr.
ItemNo. Hiring and operatingthe 20 KV 3 Phase Electric Generator
38 foroperatingdesiltingmachinery,andlighting and other requirements with Arranging
diesel to run the D.G.SetDoAsDirected.8HrsShift.(Nopaymentshouldbeallowedfornon
workingconditionofmachinery )
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Providing & Supplying JCB Machine on rental basis in case of emergency situation and
39 break down type work & also during unavoidable condition as per instruction of
engg.incharge, rate includes all nece. shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and laying work)
The item is for supplying JCB on rent for various construction activities The rate includes
variousoperational cost such asoperating generater/electricity diesel,petrol, operater's salary, etccomp.
when machine is in working condition all precautions shall be taken by contractor to avoid theaccident.if
any accident occurs contractor shall be fully resonsible for that. the payment shall begiven on hour
basis.No payment shall be given for idle hour and no time shall be counted forcarrying
machinetositeandfromshiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-110capacityonrentalbasisincaseofemergency
40 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesall nece. shifting, fuel and operatingcharges
TheitemisforsupplyingMachinerentforvariousconstructionactivitiesTherateincludes
various operational cost such as operating generater/electricitydiesel,petrol, operater's salary,etc comp.
when machine is in working condition all precautions shall be taken by contractor
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall be given
on hour basis.No payment shall be given for idle hour and no time shall becountedforcarryingmachineto
siteand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing&SupplyingHitachiMachine-200capacityonrentalbasisincaseofemergency
41 situation and break down type work & also during unavoidable condition asper
instruction of engg.incharge , rate includesall nece. shifting, fuel and operatingcharges.
The item is for supplying Machine rent for various construction activities The rate includesvarious
operational cost such as operating generater/electricitydiesel,petrol, operater's salary,etc comp. when
machine is in working condition all precautions shall be taken by contractor
toavoidtheaccident.ifanyaccidentoccurscontractorshallbefullyresonsibleforthat.thepaymentshall be given
on hour basis.No payment shall be given for idle hour and no time shall becountedforcarryingmachineto
siteand from shiftingsitetosite.
thepaymentshallbegivenonhourbasis.
ItemNo. Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in case
42 ofemergency situation and break down type work & also during unavoidable condition
asper instruction of engg.incharge , rate includesall nece. shifting, fuel and
operatingcharges.
Providing & Supplying hydra carne Machine of 12 tone capacity on rental basis in caseof
emergency situation and break down type work & also during unavoidable condition as
perinstructionofengg.incharge,rateincludesallnece. shifting,fuelandoperatingcharges.
thepaymentshallbegivenonPer8hrShiftbasis.
ItemNo. SupplyingElectricBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusing
43 Operator, fuel, power Supply etc. Complete as Directed. (No payment should beallowed for
non working condition of machinery and for pipe line excavation and M.H.work.Allowed
onlyforbreak downwork)
Modeofmeasurements&payment:Therat
eshallbefor aunitofShift
ItemNo. upplyingPneumaticBreakerMachineforRCCSlaborAsphaltDemolishingWorkonsitebyusing
44 Operator,fuel,powerSupplyetc.CompleteasDirected.(Nopaymentshouldbeallowed for non
working condition of machinery and for pipe line excavation and M.H.work.Allowed
onlyforbreak downwork)
Mode of measurements & payment:
Therateshallbeforaunit ofHour
ItemNo. Hiringoftractorwithtrolleyconsidering8Hrs.asworkingdayhoursincl.Driver
45 Modeofmeasurements&payment:Therat
eshallbefor aunitofShift
ItemNo. HiringofThreewheelercarrier(Chakado/Rixa)considering10Hrs.asworkingdayhoursincl.Driv
Modeofmeasurements&payment:
TherateshallbeforaunitofShift
ItemNo. Levellingororientationofexistinggullytrapchamberincl.Nece.masonryinCM1:6andplasterinC
47 M1:3etc.using oldG.T.stoneandcoveretc. comp.
Modeofmeasurements&payment:
Therateshallbefor aunitofNos
ItemNo. ConstructingBombayPatternTypeCatchPitofsize0.60x0.60depthupto
48 1mtincludingexcavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of
CM (1:6) with40 mm thick IPS flooring in the propM15 at bottom and 15 mm thick cement
plasterinsidethecatchpitinthe proportionofCM(1:3)withoutjalietc.comp.asdirected.
Catchpit shall be provided at every change of alignment, gradient or diameter
ofstormwaterdrains,Bendsandjunctionsinthesewer/drainshallbegroupedtogetherinchamberas far as
possoble. The maximum distance between inspection chambers shall be about
25meters.Wherethediameterofsewer/drainisincreased,thesoffitofthepipeshallbefixedatthesame level and
necessary slope given to the channel of manhole/inspection chamber. Theminimum internal sizes of
manhole/inspection chamber shall be as per the respective item
ofwork.Themanhole/inspectionchambershallbeconstructedasperthedetaileddrawingsandasdirected by
Engineer. The bed concrete and the brick masonry shall be constructed of suchthickness as shown on
drawing. The brick masonry shall be constructed in C.M. (1:5), plasteredon both faces with 15 mm
cement plaster in C.M. (1:3). The channel shall be semicircular in thebottom half and of diameter equal to
the sewer/drain. Above the horizontal diameter, the sidesshall be extended vertically to the same level as
the crown of the outgoing pipe and the top
edgeshallbesuitableroundedoff.Thebranchchannelsshallalsobesimilarlyconstructedwith
respecttothebenchingoutattheirjunctionwiththemainchannelasappropriatefallsuitable
rounded off in the direction of flow in the main channel shall be given. The channel at the
bottomof manhole/inspection chamber shall be plastered with C.M. (1:3) and finished
smooth. Rungsshall be provided in all manholes/inspection chambers over 0.6 mtr in
depth and shall be of castiron conforming to IS:5455. These rungs shall be fixed staggered
in two vertical runs,
mmaparthorizontallyand300mmc/cvertically.Thetoprungshallbe450mmbelowthemanhole/in
spection chamber cover and the lowest not more than 300 mm above the benching.The
manhole/inspection chamber framing and cover shall be of cast iron of specified weight
andshall conform to the requirements given in IS:1726. The covers and frames shall be
cleanly castand they shall be free from air and sand holes and from clod shuts. They shall
be neatly dressedand carefully trimmed. All castings shall be free from voids whether due
to shrinkage, gasinclusion or other causes.Covers shall have a raised chequered design
on the top surface toprovide an adequered nonslip grip. Cover shall be capable of easy
opening and closing and itshall be fitted in the frame in workmanship like manner. The
cover shall be gas tight and watertight. The size of covers specified shall be considered as
the clear internal dimensions of theframe.Coversand framesshall be coated with a
blackbituminous composition. The coatingshall be smooth and tenaceous. The frame of
manhole/inspection chamber cover shall be firmlyembeded to correct alignment and level
in cement concrete on the top of the masonry. The itemshallbeexecutedasperthedetailed
drawingandasdirectedbyEngineer
Modeofmeasurements&payment:Therate shallbeforaunitofNos
ItemNo. CatchPitJaliFixingP/FFRCcatchpitjaliwithframe600mmx600mmclearopeningetc.comp..Asdi
49 rected byengineerincharge.
Modeofmeasurements&payment:
Therateshallbefor aunitofNos
ItemNo. Supplying & fixing M.S. plate of required size including cutting bending carting to site
50 placing on damagrd portion of main drainagr line on site incl. loading un loading etc.
comp. as directed by engg. In charge..
ItemNo. Temporary / Permanent Plugging for blocking of sewer line, branch connections and
51 diversion of flows and removal of all plugs by any means etc. comp. as directed by
Engineer In Charge of the work.
ItemNo. Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with
52 M.S. flats at required spacings and frame alround, square or round bars with round
headed bolts and nuts or by screws (A) Plain Grill.
ItemNo. Providing and laying in position Ready Mixed M-250 grade concrete for reinforced cement
53 conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to
10 kms having continuous agitated mixer, manufactured as per mix design of specified
grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer
to site of laying, excluding the cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without impairing strength and durability as
per direction of the Engineer - in - charge.
ItemNo. filling in plinth with sand under floors including watering, ramming consolidated and
54 dressing etc. complete.
Sand shall conform to M.
The sand to be used for filling shall be free from salts, organic or other foreign matter, All
clods of earth shall be broken.
As soon as the work in foundation has been completed and measured, the site of foundation
shall be cleared of all debris, brick bats, mortar dropping etc; and filled with sand in layers not
exceeding 20 Cms. Each layer shall be adequately watered rammed and consolidated before
the succeeding layer is laid. The sand shall be rammed with iron rammers where feasible
and with the butt ends of crow-bars, where rammer cannot be used.
The plinth shall be similarly filled with sand in layers not exceeding 20 Cms adequately
watered and consolidated by ramming with iron or wooden rammers. When nfilling reaches
finished level, the surface shall be flooded with water for at least 24 hours and allowed to dry
and then rammed and consolidated.
The finished level of filling shall be kept to shape intended to be given to floor.
In case of large heavy duty flooring like factory flooring, the consolidation may be done by
power rollers, where so specified. The extent of consolidation required shall also be as
Mode of measurement and payment :
The payment shall be made for filling in plinth and trenches, No deduction shall be made for
shrinkage or voids if consolidated as instructed above
The rate includes cost of collecting carting sand with all lead and labour for filling the same in
plinth under floors.
The rate shall be for a unit of one cubic meter.
ItemNo. Supplying Potable Water Tanker to be filled from nearby water distribution station of AMC.
55 with 30 meter Delivery Pipe. The tanker should be supplied as & where reuired & when
order placed by Engineer In - Charge The rate includes the fuel charge, driver's charge
ItemNo. Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
56 specification including premixing the Material with water at OMC in mechanical mix plant
carriage ofmixed Materialby tipper to site, laying inuniform layers insubbase/ base
course on wellprepared surface and compacting with vibratory roller to achieve the
desired density as per Codal Provision
ItemNo. Supply of graded machine cut black trap stone aggregate (metal) of Sevaliya /Tima or
57 equivalent quality metal of size 25 mm to 40 mm.
ItemNo. Labour work for spreading the metal 85 mm thick in single layer, incl. providing & applying
58 bitumen for semi grouting 2.5 kgs/sqm. & Providing & spreading the key black trap
aggregate of good quality on top at the rate of 0.013 cmt. per sq.m. of size18mm passing
in 9.5 mm retain rolling with 10 tonne roller etc comp. as directed.
ItemNo. Demolitionincl.stackingofserviceablematerials&disposalofunserviceablematerialswith all
59 leadandlift.
(c) TilesorStoneflooring(20.23,page219)
Demolishing work shall be carried out as per instructions given by the Engineer in
charge.Demolishing of stone slab pavement or any other type of paving, proportion of
cement or lime,sorting out materials, carting them up to lead of 50 mts. & Stacking the
different materialsseparatelyasdirectedbytheEngineer inchargeofwork.Thework
shallbedonecarefully.
ItemNo. Labour work for fixing any kind of paving with cement pointing in CM 1:2,
60 including watering, ramming etc comp. as dir.For pavement I) Laying on Sand
bedding as per requirement to fix the C.C.Block / Nibhada Stone in Line & Level
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm th
sandbedding, levelling, watering and fixing in line & level as well cleaning the site etc.comp.
A)LayingonsandbeddingasperrequirementfofixtheCCblock/nibhadaStoneinlinelevel
Themeasurementshallbeforaunitofonesq.metre.basis.
ItemNo. Labour work for reinstament or asphalt pavment covering excvation watering
61 consoldation resoiling meating with the activity of teackcoat including carting the mix
from the nearest store pacting it with convayance charge of excavation earth etc.comp as
Important Note:-
in the Case missing/Dout,Correction or Detail Specification As Per Govt.Speecification Applicable For this Work & As Per
instruction of Engg.inchage & also General Technical Specifications for Building Works book available from Gujarat Book
Stores (Pvt.) Ltd. Sector-21,Gandhinagar,DETAILED GENERAL TECHNICAL SPECIFICATIONS can be available from
Ahmedabad Municipal Corporation website “www.egovamc.com”.&
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications of items which are
not mentioned in BOQ Item, Specifications should be considered as per AMC Sor,other Government SOR or Current
Approved Rates for Civil and Electrical Works, as per Available on Site of Ahmedabadcity.gov.in All the Specifications
should be Considered as per Schedules Rates of R & B Division of both civil and Electrical Works. Hence it an ARC
Tender All the Quantity Would Vary as per Instruction of Engineer in Charge. No Rate would be given Extra for Increase or
Decrease in the Quantity of The BOQ Scheduled Items.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Seal and Signature of the Bidder Add.CityEngineer(West Zone)
Amdavad Municipal Corporation
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Clause : 6 "The contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the
prevailing AMC circulars issued from time to time."
SCHEDULE OF MAINTENANCE
Maintenance schedules for municipal drainage systems vary depending on the city and the type of infrastructure
(stormwater vs. sewage).The maintenance shall be of these two basis.: preventive maintenance (scheduled) and reactive
maintenance (complaint-based).
The contractor shall execute maintenance and upgradation works as directed by the client and through self-inspection
under the instructions of the Engineer-in-Charge.
Surveying of lines and manholes for the specified works shall be undertaken as and when required on the designated
roads, as instructed by the Engineer-in-Charge.
The inspection schedule shall be aligned with the following categories of complaints, with priorities determined by the
Engineer-in-Charge:
* CCRS complaints
* Complaints from MLAs/Councilors
* Complaints from officials
The specific lines and machinholes shall be surveyed as per below schedule as specified.
1. Ward Office: Visit Ward s office every week take the road detail on which the schedule inspection to be done and
carry the survey of machineholes ,lines as specified by EIC.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP Mobile No.:- (West Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft
fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf:
LED/WRT/e-file/11/2024/0293/M2 Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 13.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].