Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹53.9 L
EMD Value
₹1.1 L
Closing Date
2 Jun 2026, 11:00 amClosed
EE Jal shakti Division Katrain
EE Jal shakti Division Katrain
Construction of Division building at Katrain in Tehsil and Distt. Kullu H.P. (SH- C/O Columns Pillars and Ground floor Slab)
2026_HPIPH_134976_1
Katrain Divisional Building NIT no-1693-1743 DATED 22-04-2026
Open Tender
Civil Works
Item Rate
60 days
Katrain
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹1.1 L
26 Sept 2026
23 Apr 2026
2 Jun 2026
23 Apr 2026
2 Jun 2026
23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in foundation and trenches in earth work upto all depth in all kinds of soil such as pick work jumper work,blasting work,chiselling of soft /hard rock where blasting is prohibited in all leads and lifts and including trimming of sides levelling of bed to correct grade stacking the excavated soil in 15cm. layers when required into plinth sides of foundation including consolidating each deposited layer by ramming and watering and then disposing oof all surplus excavated soil as directed in all leads and lifts and soring/strutting timbering and dewatering where ever required to the entire satisfaction of the Engineer-in-charge. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:4:8 (1 cement : 4 sand : 8 graded stone aggregate 40 mm nominal size ) and curing complete excluding cost of form work in foundation and plinth complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | - | Cum | - | - |
| - | Random Rubble Masonry / polygonal rubble masonry (uncoursed / brought to courses) with hard stone of approved quality in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 sand : 12 graded stone aggregate 20 mm nominal size) at plinth level in cement mortor 1:6 ( 1 cement : 6 sand) complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | - | Cum | - | - |
| - | Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering , strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu- reinforcement concrete and plain concrete work complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. in:- | - | - | - | - |
| - | Foundation footing bases of columns etc and mass concrete. | - | Sqm | - | - |
| - | Columns, pillars, post and Struts | - | Sqm | - | - |
| - | Beam, cantilever, girders and lintels, sides and soffits of beam, beam haunching, cantilever, bressumers and lintels not exceeding 1 mtr. In depth in all heights from floor to all depth. | - | Sqm | - | - |
| - | Flat surfaces such as soffits of suspended floors, roofs, landings and the like in floor etc. upto 200mm thickness. | - | Sqm | - | - |
| - | Providing & Laying cement concrete work 1:11/2: 3 (1 cement : 11/2 sand : 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts in:- | - | - | - | - |
| - | Foundation footing bases of columns etc and mass concrete. | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.31 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Terms.pdf
Tender Documents • 0.12 MB
BOQ_199738.xls
BOQ • 0.39 MB
Form6.pdf
Tender Documents • 0.36 MB
Form8.pdf
Tender Documents • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .