Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC VILL LAXMINARAYANPUR P O KAK KALINAGAR P S HARWOOD POINT COASTAL DIST SOUTH 24 PGS | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 L+₹39,679.68 (23.4%)Rejected-Finance | ₹2.1 L+₹39,679.68 (23.4%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 L+₹58,263.54 (34.3%)Rejected-Finance | ₹2.3 L+₹58,263.54 (34.3%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Credential mismatched |
| 5 | Rejected-Technical VILL KAKDWIP HOSPITAL ROAD SUBHAS NAGAR P O P S KAKDWIP DIST SOUTH 24 PGS PIN 743347 | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | 743347 | - | - | Rejected-Technical Form-VIII issued by Registrar of Firms not uploaded |
Tender Value
₹2.3 L
EMD Value
₹4,652
Closing Date
22 May 2026, 12:00 pmClosed
EE Kakdwip Irrigation Division
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip South 24 Parganas
Emergent restoration of Sundarban Embankment for a length of 60 M from Ch.26.120 Km to Ch.26.180 Km at Mouza-Rajnagar, Block - Namkhana on the left bank of river Muriganga,under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division.
2026_IWD_1024337_1
WBIW/EE/KIDIVISION/e-NIT- 01(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
7 days
Namkhana
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,652
Yes
14 Aug 2026
15 May 2026
23 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length). | - | Mtr. | 34.56 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | 1 | Mtr. | 13.11 | ₹13.1 |
| 3 | Supplying, fitting and fixing with ironnails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Mtr. | 26.22 | - |
| 4 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). | - | Each | 8.34 | - |
| 6 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 7 | Earth work from borrow pits over existing embankment or for repairs to embankment, closing breachesetc.within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | - | Cum | 96.54 | - |
| 8 | Extra rate over Item Nos. 7 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.i) From 120 meter to 150 metre- | 1 | Cum | 57.21 | ₹57.15 |
| 9 | Extra rate over Item Nos 7 for all kinds of soil for every additional lift of 1.50 metre or part there of beyond the initial lift of 1.50 metre. | - | Cum | 14.3 | - |
| 10 | Supplying at site and laying in position UV stabilized polypropylene
woven geotextile of 430 gsm as filter, as per specification, including costof preparing the bed, placing the geotextile as per profile with at least15cm lapping, wherever require dandanchorage at top, sewing /welding the overlapped portion, storage and transportation by allmeans, complete as per direction of the Engineer-in-charge.
Note: 1. Payment to be made on measurement of finished surfacewithout lapping, butincluding anchoring length at top.
2. Payment will be made subject to the result of 3rd Party Testing, tobe done by the Engineer-in-charge departmentally. Paragraphs 2.7.7,2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in theUSoR shall be reproduced and included in the tender document as“Specification & Special Terms & Conditions for Geotextile” in case ofuse of this item in the estimate.
3. This particular item is to be used in special cases, either incontinuation of previous usage or after offering adequate justificationfrom techno-economical angles | - | Sqm | 288.42 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2517412.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .