Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L Quoted ₹4.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹4.4 L+₹16,892.60 (3.95%)Rejected-Finance | ₹4.4 L+₹16,892.60 (3.95%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.6 L+₹33,665.80 (7.87%)Rejected-Finance | ₹4.6 L+₹33,665.80 (7.87%) | L3 | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical CONTRACTOR WARD NO 10 DEVINAGAR PAONTA SAHIB DISTRICT SIRMOUR H P | SIRMAUR | HIMACHAL PRADESH | 173001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Himalaya Enterprises L3 | Rames Chand L1 | Sudesh Kumari L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including up rooting rank vegetation. Grass, bush wood trees & saplings of girth upto 30cm measured at height of 1.00 mtr. Above ground and removal of rubbish up a distance of 20mtrs out side periphery of area cleared as per the direction of Engineer –in-charge | 3,190 | P/Sqm | 30 ₹95,700 | 20 ₹63,800 Lowest | 25 ₹79,750 |
| 2.00 | Removal of Silt/Slips in all kinds of soile including saturated soile but excluding boulder and rocky portion requiring blasting upto a distance of 20meters disposing of un-serviceable materials, serviceable materials and neatly dressed the surface complete in all respect including all lead and lift as per the direction of Engineer in charge. | 27.36 | P/Cum | 375 ₹10,260 | 370 ₹10,123.2 Lowest | 380 ₹10,396.8 |
| 3.00 | Excavation in foundation, trenches etc. in earth work lift upto 1.50mtr. Stacking the excavated soil not more then 3mtr. Clear from the edge of excavation & the returning the stacked soil in i15c layers when reguird in to plinth side of foundation etc consolidation each deposited layer by ramming & watering & watering & then disposing of all surplus excavated earth as directed with in a leads of 20mtr. (P/J work) | 45 | P/Cum | 685 ₹30,825 | 680 ₹30,600 Lowest | 681 ₹30,645 |
| 4.00 | Providing form work with steel 3.15mm thick welded with angle iron 30x30x5mm so as to give rough finish i/c centering shuttering and propping etc. with wooden bettens, & Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4mtr.and removal of the same for insitu RCC work including all leads lifts and carriage of materials at site & as per direction of Engineer in charge in:- Vertical Surface. | 156 | P/Sqm | 525 ₹81,900 | 516 ₹80,496 Lowest | 520 ₹81,120 |
| 5.00 | P/L C.C 1:3:6 (1Cement:3 Sand:6 graded stone agg. 20mm nominal size) & curing complete excluding cost of form work in foundation & plinth and as per the direction of Engineer in charge. | 22.5 | P/Cum | 10,800 ₹2,43,000 Lowest | 10,800 ₹2,43,000 Lowest | 10,800 ₹2,43,000 Lowest |
Tender Value
₹3.9 L
EMD Value
₹7,900
Closing Date
9 Sept 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division PontaSahib
Repair of various RD, 70 to 90mtrs RD,175 to 200mtrs and RD 530 to 560mtrs including Removal of Slips/ Silt from FIS at Various RD,s 675 to 855mtrs at FIS Amboya
2025_HPIPH_113653_1
PNT-SMR02-720 No.11455-11554 dated 27.08.2025
Open Tender
Civil Works
Item Wise
90 days
Amboya
Please refer to Tender documents
8 documents required · 8 mandatory
₹500
EE JSV PontaSahib
₹7,900
3 Jul 2026
3 Sept 2025
10 Sept 2025
3 Sept 2025
9 Sept 2025
3 Sept 2025
3 Sept 2025 - 9 Sept 2025
Amount
Clearing jungle including up rooting rank vegetation. Grass, bush wood trees & saplings of girth upto 30cm measured at height of 1.00 mtr. Above ground and removal of rubbish up a distance of 20mtrs out side periphery of area cleared as per the direction of Engineer –in-charge
Removal of Silt/Slips in all kinds of soile including saturated soile but excluding boulder and rocky portion requiring blasting upto a distance of 20meters disposing of un-serviceable materials, serviceable materials and neatly dressed the surface complete in all respect including all lead and lift as per the direction of Engineer in charge.
Excavation in foundation, trenches etc. in earth work lift upto 1.50mtr. Stacking the excavated soil not more then 3mtr. Clear from the edge of excavation & the returning the stacked soil in i15c layers when reguird in to plinth side of foundation etc consolidation each deposited layer by ramming & watering & watering & then disposing of all surplus excavated earth as directed with in a leads of 20mtr. (P/J work)
Providing form work with steel 3.15mm thick welded with angle iron 30x30x5mm so as to give rough finish i/c centering shuttering and propping etc. with wooden bettens, & Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4mtr.and removal of the same for insitu RCC work including all leads lifts and carriage of materials at site & as per direction of Engineer in charge in:- Vertical Surface.
P/L C.C 1:3:6 (1Cement:3 Sand:6 graded stone agg. 20mm nominal size) & curing complete excluding cost of form work in foundation & plinth and as per the direction of Engineer in charge.
Sudesh Kumari (BID ID -552545)
Himalaya Enterprises (BID ID -552562)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .