Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC KUNNEL HOUSE SOUTH PARAVOOR LSGD AMBALLOOR PANCHAYATH | IDUKKI | KERALA | 685501 | 1 | Accepted-AOC 1 | |
| 2 | 2₹3.3 L+₹18,905 (6.09%)Rejected-AOC | 2 | Rejected-AOC 2 | |
| 3 | 3₹3.4 L+₹34,603 (11.2%)Rejected-AOC 1205 SUB TREASURY KOLENCHERY | ERNAKULAM | KERALA | 680667 | 3 | Rejected-AOC 3 | |
| 4 | 4₹3.6 L+₹49,537 (16.0%)Rejected-AOC PIRAVOM PO ERNAKULAM PIN 686664 | ERNAKULAM | ERNAKULAM | KERALA | 686664 | 4 | Rejected-AOC 4 | |
| 5 | 5₹3.6 L+₹53,921 (17.4%)Rejected-AOC PIRAVOM PO ERNAKULAM PIN 686664 | ERNAKULAM | ERNAKULAM | KERALA | 686664 | 5 | Rejected-AOC 5 |
| Sl No | Description | Qty | Unit | Sijimol George L4 | BIJUKUMAR L2 | Manoj K S L1 | TPMATHAI L3 | RAJU P U L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00RENOVATION OF THODU | ||||||||
| 1.00 | OD78969/2025-2026:Dismantling,clearing away and carefully stacking matrial useful for re use for anythickness of walls in DR Masonry including disposal of unserviceable rubble etc | 22.1 | cum | 748.43 ₹16,540.3 | 684.72 ₹15,132.31 | 645.41 ₹14,263.56 Lowest | 717.37 ₹15,853.88 | 757.52 ₹16,741.19 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 30.6 | cum | 254.54 ₹7,788.92 | 232.87 ₹7,125.82 | 219.5 ₹6,716.7 Lowest | 243.98 ₹7,465.79 | 257.63 ₹7,883.48 |
| 1.00 | OD78971/2025-2026:Dry rubble masonry without concrete levelling course with good quality blasted rubble including packing to compactness to lines and levels as per direction of Engineer in charge at site | 60.95 | cum | 3,945.54 ₹2,40,460.94 | 3,609.69 ₹2,19,992.56 | 3,402.43 ₹2,07,361.1 Lowest | 3,781.81 ₹2,30,482.41 | 3,993.46 ₹2,43,381.42 |
| 1.00 | OD78970/2025-2026:DR Masonry using departmental rubble -Dry rubble masonry without concrete levelling course with good quality blasted rubble including packing to compactness to lines and levels as per direction of Engineer in charge at site | 16.57 | cum | 1,695.29 ₹28,099.43 | 1,550.98 ₹25,707.49 | 1,461.93 ₹24,231.49 Lowest | 1,624.94 ₹26,933.38 | 1,715.88 ₹28,440.71 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.4 | cum | 9,844.36 ₹33,470.82 | 9,006.4 ₹30,621.76 | 8,489.27 ₹28,863.52 Lowest | 9,435.84 ₹32,081.86 | 9,963.88 ₹33,877.19 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 255 | kg | 111.08 ₹28,325.4 | 101.63 ₹25,915.65 | 95.79 ₹24,426.45 Lowest | 106.47 ₹27,149.85 | 112.48 ₹28,682.4 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 13.6 | sqm | 381.53 ₹5,188.81 | 349.05 ₹4,747.08 | 329.01 ₹4,474.54 Lowest | 365.69 ₹4,973.38 | 386.16 ₹5,251.78 |
Tender Value
₹3.6 L
EMD Value
₹9,106
Closing Date
16 Oct 2025, 4:00 pmClosed
ASSISTANT ENGINEER,LID EW
ASSISTANT ENGINEER,LID EW
RENOVATION OF VALIYAKULAM THODU
2025_LSGD_807623_1
E37/AMBR/25-26
Open Tender
Civil Works - Water Works
Item Rate
180 days
AMBALLOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹805
₹9,106
1 Jan 2026
9 Oct 2025
18 Oct 2025
9 Oct 2025
16 Oct 2025
9 Oct 2025
Amount
RENOVATION OF THODU
OD78969/2025-2026:Dismantling,clearing away and carefully stacking matrial useful for re use for anythickness of walls in DR Masonry including disposal of unserviceable rubble etc
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD78971/2025-2026:Dry rubble masonry without concrete levelling course with good quality blasted rubble including packing to compactness to lines and levels as per direction of Engineer in charge at site
OD78970/2025-2026:DR Masonry using departmental rubble -Dry rubble masonry without concrete levelling course with good quality blasted rubble including packing to compactness to lines and levels as per direction of Engineer in charge at site
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
BIJUKUMAR (BID ID -2387774)
TPMATHAI (BID ID -2393351)
Sijimol George (BID ID -2387125)
RAJU P U (BID ID -2387293)
Bidder Name
TPMATHAI
Manoj K S
Sijimol George
BIJUKUMAR
RAJU P U
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1346162.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .