Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 400 ABC TOWERS 13TH STREET SIDCO INDUSTRIAL ESTATE AMBATTUR CHENNAI TAMIL NADU 600098 | 600098 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
30 Nov 2020, 3:00 pmClosed
EE ALHW
the Office of CE and A ALHW Port Blair
Providing Consultancy Services and Procurement for Environmental Monitoring of various parameters during the construction periods for the ALHW project of Jetty Extension Phase-II along with Wet Basin and Refit Jetty at NSRY Haddo in Port Blair
2020_ALHW_597845_1
/ENV/RFP-13/EMP-NSRY(HADDO)
Open Tender
Consultancy
Item Rate
638 days
Haddo Port Blair
As per RFP Document
4 documents required · 4 mandatory
₹0
Exempted
9 Apr 2021
19 Nov 2020
1 Dec 2020
20 Nov 2020
30 Nov 2020
25 Nov 2020
20 Nov 2020 - 25 Nov 2020
Amount
Monitoring of Environmental Parameters as specified in the EIA report and EC conditions during the variouis stages of construction periods of the ALHW projects for " Jetty Extension Phase-II along with Wet Basin and Refit Jetty at NSRY Haddo in Port Blair" and presenting the outcome of the reports monthly & half yearly etc to the ALHW authority, including all expenditures like mobilization of men and materials to the project sites, lodging , boarding, conveyance, sampling, data collection, analysis and submission of the required reports with experts comments etc complete.
Ambient Air on Decks - PM2.5, PM10,SO2, Nox & CO(24-hourly continuously for 2 days/month for the entire Construction period in the year
Noise - Day & Night Leq Noise levels dB(A) Once in a month for the entire period of Construction
Water (Marine and Groundwater) - pH, Turbidity, Salinity, TSS, DO, BOD, COD, Sulphides, Phenols, Oil & Grease, Total Ammoniacal Nitrogen,etc. Once in a month
Sediments - Spillages, if any & its composition, Bulk Density, Porosity, pH, EC,Na, Cl,Heavy Metals Mn, Cu, Zn,Pb, etc. Once in a month
Carryout the Hydrodynamic and shoreline studies in the project location on six (06) monthly basis for the construction period and submit the six monthly compliance report to the proponent as per the EC conditions, including all expenditures like mobilization of men and materials to the project sites, lodging , boarding, conveyance, sampling, data collection, analysis and submission of the required reports with experts comments etc complete.
Environmental System Consultants & Ambiente Lab Solutions Private Limited
ABC TECHNO LABS INDIA PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .