Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC | ₹18.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.5 LRejected-AOC | ₹18.5 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical NULL | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | NARAYANAN KUTTY T L1 | E P ARUN KUMAR L3 | NASIR K A L2 | SUBAIR. K.S. L4 |
|---|---|---|---|---|---|---|---|
| 1.00Ground Improovment | |||||||
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 2,051.25 | cum | 394 ₹8.1 L | 416.16 ₹8.5 L | 403.17 ₹8.3 L | 410 ₹8.4 L |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 24.9 | cum | 274 ₹6,822.60 | 289.07 ₹7,197.84 | 280.04 ₹6,973 | 300 ₹7,470 |
| 1.00 | OD337057/2025-2026:DRY Rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels including all cost and conveyance of all materials and labour charges | 64.83 | cum | 3,038 ₹2.0 L | 3,209.1 ₹2.1 L | 3,336.8 ₹2.2 L | 3,200 ₹2.1 L |
| 1.00 | OD318167/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 16.62 | cum | 5,965 ₹99,114.44 | 6,302.18 ₹1.0 L | 5,839.4 ₹97,027.47 | 6,900 ₹1.1 L |
| 1.00 | OD323097/2025-2026:Filling with Departmental earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 2,040.5 | cum | 288 ₹5.9 L | 304.24 ₹6.2 L | 289.55 ₹5.9 L | 315 ₹6.4 L |
| 1.01 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | 37.3 | sqm | 269 ₹10,035.05 | 284.16 ₹10,600.59 | 275.29 ₹10,269.69 | 330 ₹12,310.65 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.92 | cum | 7,579 ₹29,671.79 | 8,007.09 ₹31,347.76 | 7,757.78 ₹30,371.71 | 9,000 ₹35,235 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 234.9 | kilogram | 86 ₹20,201.40 | 90.34 ₹21,220.87 | 87.51 ₹20,556.10 | 95 ₹22,315.50 |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 326.2 | kg | 148 ₹48,277.60 | 156.12 ₹50,926.34 | 151.24 ₹49,334.49 | 150 ₹48,930 |
Tender Value
₹22.2 L
EMD Value
₹50,000
Closing Date
28 Oct 2025, 11:00 amClosed
MOHAMMED SALIH V
Assistant Engineer LIDEW Section Anthoor municipality
Pro No 326 -Anthoor Municipality-RENOVATION OF KADAMBERI G.U.P SCHOOL GROUND
2025_LSGD_811438_4
05/2025/AE/LIDEW/AND/25-26
Open Tender
Civil Works - Others
ANTHOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
21 Jan 2026
21 Oct 2025
29 Oct 2025
21 Oct 2025
28 Oct 2025
21 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
PA326.pdf
Tender Documents • 0.25 MB
SBD326.pdf
Tender Documents • 0.98 MB
FOT326.pdf
Tender Documents • 0.25 MB
AFFT326.pdf
Tender Documents • 0.23 MB
BOQ_1355192.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid