Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
16 Mar 2021, 1:00 pmClosed
SE ETC I MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
THE WORK OF REPLACEMENT OF GASKET OF 40 MVA TRANSFORMER-II (ACCURATE MAKE) AT 132 KV SUB-STATION TANDA UNDER ELECTRICITY TRANSMISSION DIVISION-RAMPUR
2021_UPTCL_556762_1
E-T-125/ ETCM/2020-21
Open Tender
Electrical Works
Fixed-rate
60 days
RAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC MORADABAD
₹6,000
26 Mar 2021
18 Feb 2021
16 Mar 2021
18 Feb 2021
16 Mar 2021
18 Feb 2021
Amount
The Following works are to be carried out at 132KV S/S, Tanda under ETD- Rampur.
Carriage of oil tanker 25 KL including loading, unloading & carriage from any near place to 132 KV S/S Tanda.
Complete drain out of T/F oil from main tank of filling in empty oil drums.
Dismantling of HV/LV/Neutral bushing, turrent from T/F Tank, Radiators, conservator Tank, explosion vent pipe, bucholz relay, oil pipe line, colling fans, opening of electricals connections & proper blanking for open space of replacement of gasket.
Centrifuging of oil in oil tank by connecting the centrifuging pipes, circulating the T/F oil through centrifuging machine to increases BDV.
Repalcement of old & Damage gasket of 40 MVA T/F by providing new gasket as per required size of good quality rubberized cork sheet of NU COCK/TALBROS make at required places of complete T/F including top covers & accessories.
Complete erection of 40 MVA T/F by erection of radiator, conservator tank, bushing with its turret (if available) turret, HV/LV/TV/N bushing, all pipe lines, radiator, oil, conservator tank etc.
Cleaning of Core and winding by fresh T/F oil and removed the slug from bottom.
Create the vacuum inside the tank for period for 12 Hrs. and filling of centrifuged oil step by step upto core & winding conservator tank radiator.
Centrifuging of oil in the transformer. taking the IR/BDV value of period of 4 hrs. as per norms of T/F manufacturer of till the desired values are attained filling of centrifuging T/F oil up to required oil levels of T/F. Centrifuging machine shall be arranged by the contractor at his own cost.
Overhauling of diverter switch after removing of oil and dirty T/F oil from its chamber filling the fresh centrifuged T/F oil its centrifuged T/F oil its centrifuged circulation as per norms of T/F.
Painting of 40 MVA T/F with suitable gray paint.
M/s S.S. Refregeration
Technocrat Electrical
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .