Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.2 L+₹1,236.39 (0.58%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹2.2 L+₹4,755.34 (2.22%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹2.3 L+₹16,743.62 (7.80%)Admitted-Fee/PreQual/Technical/Finance N A | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹2.3 L+₹18,743.26 (8.73%)Admitted-Fee/PreQual/Technical/Finance KOLLAM | PATHANAMTHITTA | KERALA | 689694 | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | DESIGN DOTS L3 | POURNAMI CONSTRUCTIONS L5 | THOMAS JOHN L4 | Kiran R Chandran L2 | RAJEEVKUMAR S L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Concreting of Canal Inspection Road | ||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 86.25 | sqm | 14.56 ₹1,255.8 Lowest | 15 ₹1,293.75 | 16.55 ₹1,427.44 | 15.44 ₹1,331.7 | 15.21 ₹1,311.86 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 100 | sqm | 7 ₹700 Lowest | 9 ₹900 | 8.44 ₹844 | 7.87 ₹787 | 7.6 ₹760 |
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 172.5 | sqm | 29.29 ₹5,052.53 | 30 ₹5,175 | 32.1 ₹5,537.25 | 29.96 ₹5,168.1 | 29 ₹5,002.5 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 17.25 | sqm | 310 ₹5,347.5 Lowest | 350 ₹6,037.5 | 351.48 ₹6,063.03 | 327.85 ₹5,655.41 | 326 ₹5,623.5 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 25.88 | cum | 8,000 ₹2,07,000 | 8,500 ₹2,19,937.5 | 8,404.73 ₹2,17,472.39 | 7,841.34 ₹2,02,894.67 | 7,803 ₹2,01,902.63 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,356
Closing Date
22 Sept 2026, 5:00 pmClosed
Assistant Executive Engineer
O/O the Assistant Executive EngineerKIP LB Sub Division No19kottiyam
DEPOSITROAD WORKSKIPLB Concreting of Kuzhimathicadu Sree Krishna Swami Kshethram Canal Bund Road near Ch3900m of Pallimon DistributaryReach 2 General Civil Work
2026_Irrig_869249_1
IRR/PII/TR/5377/2024_5_5_4/1
Open Tender
Civil Works - Canal
Item Rate
180 days
kuzhimathikkadu sreekrishna swami kshetram
Please refer Tender documents.
10 documents required · 10 mandatory
₹565
₹6,356
Yes
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Concreting of Canal Inspection Road | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 86.25 | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 100 | sqm | - | - |
| 1.003 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 172.5 | sqm | - | - |
| 1.004 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 17.25 | sqm | - | - |
| 1.005 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 25.88 | cum | - | - |
stage.html
html • 0.02 MB
finance_1472550.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.89 MB
BOQ_1472550.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .