| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Technical | L1 | Admitted-Technical All required doucumenst were found. | |
| 2 | L2₹3.3 L+₹29,600 (9.93%)Admitted-Technical | L2 | Admitted-Technical All required doucumenst were found. | |
| 3 | L3₹3.4 L+₹37,500 (12.6%)Admitted-Technical | L3 | Admitted-Technical All required doucumenst were found. |
| Sl No | Description | Qty | Unit | M/S SUZAIN ENTERPRISES L3 | CHALKOO ENGINEERING WORKS L2 | MIR ELECTRICAL ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 2.00 | Supply,Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,100 KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2 | 1 | No. | 2,35,000 ₹2,35,000 | 2,30,000 ₹2,30,000 | 2,05,000 ₹2,05,000 Lowest |
| 3.00 | Supply,Carraige upto site, laying ,stringing, tensioning , binding of ACSR Conductor, (50mm2 ACSR Conductor) | 0.8 | KM | 64,000 ₹64,000 | 62,400 ₹62,400 | 60,000 ₹60,000 Lowest |
| 4.00 | Supply, Carriage up to site, laying ,stringing, tensioning , binding of 1.1 KV grade, 185 sq-mm 1-core PVC Cable | 40 | Mtr | 21,000 ₹21,000 | 20,800 ₹20,800 | 20,000 ₹20,000 Lowest |
| 5.00 | Providing, carriage, transportation, Installation etc. Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 75 mmx10 mm & 50 mmx6 mm for connection of transformer body, G.O Set & lightening arrestor Strip for neutral earthing of size 75 mmx10 mm & 50 mmx6 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonry with RCC slab cover. | 3 | No. | 13,500 ₹13,500 | 12,600 ₹12,600 | 12,000 ₹12,000 Lowest |
| 6.00 | Supply, Carriage up to site, Installation, of Sign Board (2X2 feet) incorporating substation information along with required accessories like clamps, nuts and bolts etc. | 1 | No. | 2,000 ₹2,000 | 1,800 ₹1,800 | 1,000 ₹1,000 Lowest |
Tender Value
₹3.0 L
Closing Date
7 Oct 2021, 4:00 pmClosed
Executive Engineer ED Baramula
Executive Engineer ED Baramula
Augmentation of 63kVA to 100kVA substation at Wani Mohalla Gantamulla Bala
2021_PDD_141545_1
EDB/116
Open Tender
Electrical Works
Turn-key
45 days
Augmentation of 63kVA to 100kVA substation at Wani
Please refer Tender documents.
6 documents required · 6 mandatory
₹217
Executive Engineer ED Baramula
Exempted
20 Oct 2021
27 Sept 2021
9 Oct 2021
27 Sept 2021
7 Oct 2021
28 Sept 2021
27 Sept 2021 - 28 Sept 2021
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .