Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC | L1 | Accepted-AOC Lowest 1 | |
| 2 | L2₹18.5 L+₹4,904.74 (0.27%)Rejected-AOC | L2 | Rejected-AOC Lowest 2 | |
| 3 | L3₹19.0 L+₹53,432.54 (2.90%)Rejected-AOC | L3 | Rejected-AOC Lowest 3 |
| Sl No | Description | Qty | Unit | GINSON GT L2 | BIJEESH N C L1 | Tomy. I.K L3 |
|---|---|---|---|---|---|---|
| 1.00Appendix A - Reactive maintenance (initial rectification works | ||||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 6.72 | Hectare | 50,758.94 ₹3,41,100.08 | 50,622.97 ₹3,40,186.36 Lowest | 52,095.45 ₹3,50,081.42 |
| 1.00 | 3.24.B:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by Manual Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) | 2,350 | metre | 203.03 ₹4,77,120.5 | 202.49 ₹4,75,851.5 Lowest | 209.26 ₹4,91,761 |
| 1.00 | 10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually | 3,500 | metre | 105.81 ₹3,70,335 | 105.53 ₹3,69,355 Lowest | 109.3 ₹3,82,550 |
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br> | 40 | cum | 54.44 ₹2,177.6 | 54.3 ₹2,172 Lowest | 55.93 ₹2,237.2 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 30 | cum | 6,319.05 ₹1,89,571.5 | 6,302.13 ₹1,89,063.9 Lowest | 6,485.33 ₹1,94,559.9 |
| 1.01 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br> | 10 | cum | 7,646.37 ₹76,463.7 | 7,625.89 ₹76,258.9 Lowest | 7,847.57 ₹78,475.7 |
| 2.00Appendix B - Premonsoon works | ||||||
| 2.00 | OD34833/2025-2026:Engaging skilled beldar for clearing of existing drains and culvert, assisting wood cutter, clearing thick and thorny jungle, filling up pot holes using departmental materials, taking and replacing precast slabs in correct position with line and levels etc | 53 | Day | 1,076.12 ₹57,034.36 | 1,073.25 ₹56,882.25 | 1,015.94 ₹53,844.82 Lowest |
| 2.00 | OD34832/2025-2026:Engaging man coolies for clearing of existing drains and guiding of rain water to existing drains including necessary excavation and laying and compacting of department filler to pot holes | 51 | Day | 972.13 ₹49,578.63 | 969.53 ₹49,446.03 Lowest | 997.71 ₹50,883.21 |
Tender Value
₹21.4 L
EMD Value
₹50,000
Closing Date
5 Aug 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PWD ROADS DIVISION THRISSUR
GENERAL RM 2025 26 RC2 Phase 1 Zone 3 One Year Running Contract for various roads under Roads section Kodakara in Thrissur district 3 roads stretches for a length of 11.450 km in various roads under DLP in Kodakara roads section RM 2025-26 RC2 Phas
2025_PWD_778743_1
PWD/RB/5842/2025-2026
Open Tender
Civil Works - Roads
Item Rate
365 days
Kodakara
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
3 Sept 2025
23 Jul 2025
7 Aug 2025
23 Jul 2025
5 Aug 2025
23 Jul 2025
Amount
Appendix A - Reactive maintenance (initial rectification works
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
3.24.B:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by Manual Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
Appendix B - Premonsoon works
OD34833/2025-2026:Engaging skilled beldar for clearing of existing drains and culvert, assisting wood cutter, clearing thick and thorny jungle, filling up pot holes using departmental materials, taking and replacing precast slabs in correct position with line and levels etc
OD34832/2025-2026:Engaging man coolies for clearing of existing drains and guiding of rain water to existing drains including necessary excavation and laying and compacting of department filler to pot holes
OD34830/2025-2026:Engaging wood cutter for cutting the branches of trees, decayed trees, fallen trees etc
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
OD34831/2025-2026:Cutting branches of trees overhanging above the roads, which is harm ful for passengers of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
Appendix C - Protective /Preventive maintenance
OD45546/2025-2026: Conducting and Reporting Routine Maintenance inspections for the entire length of the project road at a frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officers at site. Additional Routine Inspection may be required in response to reports or complaints from the police other authorities and the public as a result of major incidence, typhoon or flooding damages etc. and are not measurable/ payable. A portion of the routine inspection may be carried out either during or immediately following a period of wet weather.
Appendix D - Emergency works
OD34823/2025-2026:Engaging front end loader for clearing thick and thorny jungle on road berm for vision
OD34822/2025-2026:Engaging tipper for conveying loose earth & debris to the nearest dumping yard as per the direction of departmental officers at site
GINSON GT (BID ID -2271386)
Tomy. I.K (BID ID -2274752)
Bidder Name
Tomy. I.K
GINSON GT
BIJEESH N C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1275286.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .