Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | ₹3.0 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹3.1 LRejected-AOC | ₹3.1 L | L2 | Rejected-AOC High quoted bidder |
| Sl No | Description | Qty | Unit | ANOOP K VARGHESE L2 | R.Rajendran Pillai L1 |
|---|---|---|---|---|---|
| 1.00Annual maintenance | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,775 | sqm | 17.8 ₹31,595 | 17.64 ₹31,311 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 13,000 | sqm | 9.09 ₹1.2 L | 8.99 ₹1.2 L |
| 1.00 | OD19387/2025-2026:Desilting of canals- by mechanical means (Hydraulic excavator)/manual means over areas including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth/silt to be levelled and neatly dressed. All kinds of soil | 72 | cum | 212.24 ₹15,281.28 | 209.86 ₹15,109.92 |
| 1.00 | OD19388/2025-2026:Engaging coolies for the removal of floating materials from the canal wherever
during the water and removal of silt and slipped earth at salient points for smooth flow in the canal including
all the cost , labour and hire required for working,all the cost for purchasing Bleaching powder and other antibacterial chemicals from market, Lotion and
glouse to workers, labour for drying and burning the bio degradable waste in eco-friendly environment,
charges for removing plastic wastes separated from site etc. complete as per the directions of departmental
officers at site. | 122 | each | 1,061.61 ₹1.3 L | 1,049.71 ₹1.3 L |
| 1.00 | 50.6.1.7:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 0.9 | cum | 6,679.66 ₹6,011.69 | 6,604.63 ₹5,944.17 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 15 | sqm | 337.25 ₹5,058.75 | 333.47 ₹5,002.05 |
Tender Value
₹3.1 L
EMD Value
₹7,792
Closing Date
30 Oct 2025, 4:00 pmClosed
O/o The ASSISTANT EXECUTIVE ENGINEER
O/o The ASSISTANT EXECUTIVE ENGINEER, KIP LB SUB DIVISION NO 17 KOTTARAKKARA.
GENERAL-ACTION PLAN 2025-26-KIP(LB) Annual maintenance works of Pulamon Distributary and its minors in connection with water distribution for the year 2025-26-General Civil Work
2025_Irrig_807057_2
IRR/PII/TR/2807/2025_5_3_1/1
Open Tender
Civil Works - Canal
330 days
pulamon distributory
Please refer tender documents
7 documents required · 7 mandatory
₹690
Yes
₹7,792
Yes
23 Dec 2025
23 Oct 2025
1 Nov 2025
23 Oct 2025
30 Oct 2025
23 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1360497.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1360497.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.68 MB
NIT.pdf
Other Document • 0.02 MB
Download all tender documents and submit your bid