| 1 | L1₹1.2 CrAccepted-AOC VILL CHAKRAMNATH P O P S KULPI SOUTH 24 PARGANAS 743351 | KULPI | SOUTH 24 PARGANAS | WEST BENGAL | 743351 | ₹1.2 Cr | L1 | Accepted-AOC PO has been generated |
| 2 | L2₹1.2 CrRejected-Finance GOURI TOWER FIRST FLOOR NEAR SON CHIRAIYA HOTEL SHIVPURI M P 473551 | SHIVPURI | SHIVPURI | MADHYA PRADESH | 473551 | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.3 CrRejected-Finance | ₹1.3 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S. AVISIKTA L1 | GOURI CONSTRUCTION CO. L2 | RKS ENGINEER & CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00Drawal of LT & HT UG Cables and installation of various items for sytem improvement work at AC & AF Block | ||||||
| 1.01 | Excavation of soil for formation of cable trenches & Re-instatement of the same cable trenches with the excavated soil as per instruction of site engineer. (For 4 run) | 702 | Cum | 20 ₹14,040 | 20.4 ₹14,320.80 | 21 ₹14,742 |
| 1.02 | Excavation of soil for formation of cable trenches & Re-instatement of the same cable trenches with the excavated soil as per instruction of site engineer. (For 2 run) | 5,624.2 | Cum | 20 ₹1.1 L | 20.4 ₹1.1 L | 21 ₹1.2 L |
| 1.03 | Excavation of soil by cutting metalled Road/Cement concrete/Brick masonary/chequered plate/ paver block etc for formation of cable trench along with uprooting of protective cover in the existing trench & Re-instatement of the same cable trench after erection of protective cover. | 3,216 | Cum | 136 ₹4.4 L | 138.72 ₹4.5 L | 140 ₹4.5 L |
| 1.04 | Laying of HDPE pipe(with 110mm diam. PE-80, PN-6) as per jack push method as per instruction of site engineer and as per site condition for laying of UG cable including supply of HDPE pipe as per IS: 4984-1995 | 1,598 | Mtr. | 1,045 ₹16.7 L | 1,065.9 ₹17.0 L | 1,060 ₹16.9 L |
| 1.05 | Laying of HDPE pipe(with 110mm diam. PE-80, PN-6) as per Microtunnelling method as per instruction of site engineer and excluding rate of cable laying & dressing. | 850 | Mtr. | 821 ₹7.0 L | 837.92 ₹7.1 L | 864 ₹7.3 L |
| 1.06 | Supply & Laying of Kiln-Burnt 1st class brick having proper size & shape as per instruction of site engineer. | 3,00,916 | Nos. | 9.2 ₹27.7 L | 9.4 ₹28.3 L | 10 ₹30.1 L |
| 1.07 | Cable Laying & dressing of 11KV 3Cx95sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/104 Dated 05.05.2015 and instruction of the site engineer. | 102 | Mtr. | 42 ₹4,284 | 42.84 ₹4,369.68 | 45 ₹4,590 |
| 1.08 | Cable Laying & dressing of 1.1KV 1Cx630sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/105 Dated 05.05.2015 and instruction of the site engineer. (More than2 cables in a trench) | 442 | Mtr. | 102 ₹45,084 | 104.04 ₹45,985.68 | 107 ₹47,294 |
| 1.09 | Cable Laying & dressing of 1.1KV 4Cx300sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/105 Dated 05.05.2015 and instruction of the site engineer. (2 cables in a trench) | 9,114 | Mtr. | 72 ₹6.6 L | 73.44 ₹6.7 L | 77 ₹7.0 L |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
10 May 2025, 2:00 pmClosed
Divisional Manager
Newtown Division office, Plot No-I, Action area-II, Rajarhat Kolkata-700161.
Drawal of LT and HT UG Cables along with installation of new DTRs, LT Kiosks, FPBs, DBs for LT UG Ringmain works at AC and AF block, AA IA under Newtown Division
2025_WBSED_833617_1
DM/NTD/E-Tender/2025-26/ 04/33 Dated 04.04.2025
Open Tender
CIVIL AND ELECTRICAL WORKS
120 days
Newtown
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.4 L
Newtown division
10 Apr 2026
11 Apr 2025
12 May 2025
11 Apr 2025
10 May 2025
11 Apr 2025
17 Apr 2025
Amount
Drawal of LT & HT UG Cables and installation of various items for sytem improvement work at AC & AF Block
Excavation of soil for formation of cable trenches & Re-instatement of the same cable trenches with the excavated soil as per instruction of site engineer. (For 4 run)
Excavation of soil for formation of cable trenches & Re-instatement of the same cable trenches with the excavated soil as per instruction of site engineer. (For 2 run)
Excavation of soil by cutting metalled Road/Cement concrete/Brick masonary/chequered plate/ paver block etc for formation of cable trench along with uprooting of protective cover in the existing trench & Re-instatement of the same cable trench after erection of protective cover.
Laying of HDPE pipe(with 110mm diam. PE-80, PN-6) as per jack push method as per instruction of site engineer and as per site condition for laying of UG cable including supply of HDPE pipe as per IS: 4984-1995
Laying of HDPE pipe(with 110mm diam. PE-80, PN-6) as per Microtunnelling method as per instruction of site engineer and excluding rate of cable laying & dressing.
Supply & Laying of Kiln-Burnt 1st class brick having proper size & shape as per instruction of site engineer.
Cable Laying & dressing of 11KV 3Cx95sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/104 Dated 05.05.2015 and instruction of the site engineer.
Cable Laying & dressing of 1.1KV 1Cx630sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/105 Dated 05.05.2015 and instruction of the site engineer. (More than2 cables in a trench)
Cable Laying & dressing of 1.1KV 4Cx300sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/105 Dated 05.05.2015 and instruction of the site engineer. (2 cables in a trench)
Cable Laying & dressing of 1.1KV 4Cx300sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/104 Dated 05.05.2015 and instruction of the site engineer.
Cable Laying & dressing of 1.1KV 4Cx185sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/104 Dated 05.05.2015 and instruction of the site engineer.
Supply & Making of End termination Joint suitable for 1.1 KV,1CX630 Sq.mm XLPE cable
Supply & Making of End termination Joint suitable for 1.1 KV,4CX300 Sq.mm XLPE cable
Supply & Making of End termination Joint suitable for 1.1 KV,4CX185 Sq.mm XLPE cable
Supply & Making of Straight Through Joint suitable for 1.1KV 4Cx300sq.mm. XLPE Cable
Supply & Making of Straight Through Joint suitable for 1.1KV 4Cx185sq.mm. XLPE Cable
Supply & Making of End termination Joint suitable for 1.1 KV,4CX120 Sq.mm XLPE cable
Supply & Making of End termination Joint suitable for 1.1 KV,4CX50 Sq.mm XLPE cable
Supply & Making of End termination Joint suitable for 1.1 KV,4CX25 Sq.mm XLPE cable
Supply & Making of (O/D) End termination Joint suitable for 11 KV,3CX95 Sq.mm XLPE cable
Supply & installation of Feeder pillar Box with making of cement concrete foundation
Supply & installation of New Feeder pillar Box with Dismantling of the old Feeder pillar box and return to store
Supply & installation of Distribution Box with making of cement concrete foundation
Erection of LT Kiosk with making of cement concrete foundation
Erection of RMU with making of cement concrete foundation of RMU & FRTU
Erection of 630KVA DTR with making of cement concrete foundation of DTR
Supply and fixing of cable tag on the cable
Supply & Erection of CONCREAT Cable Marker
FIING OF CAUTION BOARD
Earthing arrangement for Dist. Transformer ( Neutral )
Earthing arrangement for Dist. Transformer ( Body )
Earthing arrangement for RMU ( Body )
MAKING OF EARTHING ARRANGEMENT BY G.I EARTH SPIKE
GIS survey as per instruction of site engineer
Demolishing of Feeder plinth.
Dismantling of the Feeder Pillar box/ L&MV Kiosk and return to store.
Excavation of soil along the existing cable route for formation of cable trench along with uprooting of protective cover in the existing trench & reisnstatement of the same for laying of 11 KV, 3C X 400 sq.mm. XLPE Cable in single trench as per instruction of Site Engineer(245 (L) X 0.5 (W) X 1.0 (D) )
Excavation of soil for making of trial hole as per instruction of the site engineer including backfilling the excavated soil ( (L)3 x 0.75(W) x 1.2M depth)
Micro tunnelling work with laying of HDPE pipe across the road including supply of HDPE Pipe of PE-80, PN-4, 160 mm Dia. As per IS : 4984-2016 excluding rate of cable laying & dressing .
Laying & dressing of single run 11 KV, 3C X 300 sq.mm. XLPE Cable in excavated cable trench as per Drg. No. PNL(D) SS/105, Dt. 05.05.2015 as per instruction of Site Engineer where brick protection is required
Laying & dressing of single run 11 KV, 3C X 400 sq.mm. XLPE Cable in the microtunneling HDPE Pipe as per instruction of Site Engineer and where brick protection is not required
Laying & dressing of single run 11 KV, 3C X 300 sq.mm. XLPE Cable where brick protection is not required
Supply & Making of Straight through joint including making of jointing pit for 11 KV, 3C X 300 sq.mm. XLPE Cable
Making of protective duct for cable joint complete as per WBSEDCL's approved drawing (Ref Drg. No. PLN(D)/SS/106 Dt.05.05.2015)
Supply & Making of Indoor Type End Termination joint for 11 KV, 3C X 300 sq.mm. XLPE Cable
Dismantling of 315 kVA DTR and return to store.
GOURI CONSTRUCTION CO. (BID ID -6369997)
RKS ENGINEER & CONTRACTOR (BID ID -6370706)
stage.html
html • 0.05 MB
technical_1857463.pdf
techsummary_1857463.pdf
finance_1857463.pdf
BOQ Comparative Chart
xlsx
finsummary_1857463.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_1857463.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid