Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrQualified Make: Unbrand
Model: glpl
Title: Power Supply Unit along with UPS | Make: Unbrand
Model: glpl
Title: Power Supply Unit along with UPS | ₹1.8 Cr | L1 | Qualified MII |
| 2 | L2₹2.0 Cr+₹20.2 L (11.2%)Qualified Make: Leo
Model: LEO
Title: Power Supply Unit along with UPS 8 51 PLOT 76 LIC COLONY SUJATHA NAGAR VISAKHAPATNAM ANDHRA PRADESH 530042 | 530042 | Make: Leo
Model: LEO
Title: Power Supply Unit along with UPS | ₹2.0 Cr+₹20.2 L (11.2%) | L2 | Qualified MSE, MII, Category: OBC |
| 3 | L3₹2.1 Cr+₹27.3 L (15.1%)Qualified Make: NA
Model: POWER SUPPLY UNIT ALONG WITH UPS
Title: Power Supply Unit along with UPS | Make: NA
Model: POWER SUPPLY UNIT ALONG WITH UPS
Title: Power Supply Unit along with UPS | ₹2.1 Cr+₹27.3 L (15.1%) | L3 | Qualified MSE, MII, Category: General |
| 4 | Disqualified Make: NA
Model: Power Supply Unit along with UPS
Title: Power Supply Unit along with UPS | Make: NA
Model: Power Supply Unit along with UPS
Title: Power Supply Unit along with UPS | - | - | Disqualified MSE, MII, Category: General |
| 5 | Disqualified Make: NA
Model: POWER SUPPLY UNIT WITH UPS
Title: Power Supply Unit along with UPS | Make: NA
Model: POWER SUPPLY UNIT WITH UPS
Title: Power Supply Unit along with UPS | - | - | Disqualified MSE, MII, Category: OBC |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
2 Dec 2025, 12:00 pmClosed
Power Supply Unit along with UPS
CAMC for Power Supply Unit along with UPS for 1st year after warranty period
CAMC for Power Supply Unit along with UPS for 2nd year after warranty period
8538810
GEM/2025/B/6847669
Two Packet Bid
Power Supply Unit along with UPS
180 days
Andhra Pradesh; Visakhapatanam
Total value wise evaluation
PRODUCT_CUSTOM
7 documents required · 7 mandatory
3 yrs
₹49 L
₹2.0 Cr
10%
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| Power Supply Unit along with UPS | Visakhapatnam | 2 | 180 days | - |
| CAMC for Power Supply Unit along with UPS for 1st year after warranty period | Visakhapatnam | 2 | 1275 days | |
| CAMC for Power Supply Unit along with UPS for 2nd year after warranty period | Visakhapatnam | 2 | 1640 days |
₹2.2 L
2 Dec 2025
11 Nov 2025
2 Dec 2025
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8538810.pdf
GEM_BID
specs_2025-11-01-15-26-36_0ff6aebccfb3d03d52375eeecd78a329.pdf
SPECIFICATION
specs_2025-11-01-15-27-57_e1f8fdb1a1b70d2027ba51a2221ab6f1.pdf
SPECIFICATION
specs_2025-11-01-15-29-19_0ce085a470c7e9b234dc1d7edae8d45a.pdf
SPECIFICATION
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .