| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.0 LAccepted-AOC | ₹56.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹56.3 LRejected-AOC | ₹56.3 L | L2 | Rejected-AOC L2 |
| 3 | L3₹59.3 LRejected-AOC | ₹59.3 L | L3 | Rejected-AOC L3 |
| 4 | L4₹60.8 LRejected-AOC | ₹60.8 L | L4 | Rejected-AOC L4 |
| 5 | L5₹61.2 LRejected-AOC | ₹61.2 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | S.R.SATHYASEELAN L4 | F.Satheesh Raj L3 | VICKY VIKRAM V K L1 | PRABHAKARAN GOVINDAN L6 | R SELVARAJ L2 | GIREESH R V L5 | PRASANTH.M L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Estimate | ||||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 278.4 | cum | 237.28 ₹66,058.75 | 250 ₹69,600 | 218.77 ₹60,905.57 | 243.34 ₹67,745.86 | 219.75 ₹61,178.40 | 238.86 ₹66,498.62 | 277.57 ₹77,275.49 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 70.98 | cum | 7,306.37 ₹5.2 L | 7,500 ₹5.3 L | 6,736.3 ₹4.8 L | 7,492.88 ₹5.3 L | 6,766.71 ₹4.8 L | 7,355.03 ₹5.2 L | 8,547.08 ₹6.1 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1,324.41 | sqm | 355.66 ₹4.7 L | 350 ₹4.6 L | 327.92 ₹4.3 L | 364.74 ₹4.8 L | 329.39 ₹4.4 L | 358.03 ₹4.7 L | 416.06 ₹5.5 L |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 21,139.49 | kilogram | 103.54 ₹21.9 L | 100 ₹21.1 L | 95.47 ₹20.2 L | 106.19 ₹22.4 L | 95.89 ₹20.3 L | 104.23 ₹22.0 L | 121.13 ₹25.6 L |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 193.36 | cum | 9,177 ₹17.7 L | 9,000 ₹17.4 L | 8,460.98 ₹16.4 L | 9,411.26 ₹18.2 L | 8,499.17 ₹16.4 L | 9,238.11 ₹17.9 L | 10,735.36 ₹20.8 L |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 93.16 | cum | 9,660.4 ₹9.0 L | 9,300 ₹8.7 L | 8,906.65 ₹8.3 L | 9,907 ₹9.2 L | 8,946.86 ₹8.3 L | 9,724.73 ₹9.1 L | 11,300.84 ₹10.5 L |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 124.8 | cum | 293.32 ₹36,606.34 | 100 ₹12,480 | 270.44 ₹33,750.91 | 300.81 ₹37,541.09 | 271.66 ₹33,903.17 | 295.27 ₹36,849.70 | 343.13 ₹42,822.62 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.05 | cum | 8,506.54 ₹1.2 L | 9,000 ₹1.3 L | 7,842.83 ₹1.1 L | 8,723.69 ₹1.2 L | 7,878.23 ₹1.1 L | 8,563.19 ₹1.2 L | 9,951.05 ₹1.4 L |
Tender Value
₹67.4 L
EMD Value
₹50,000
Closing Date
28 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, Irrigation Division Tvpm
GENERAL Box culvert Construction of a box culvert in Ooruttukala branch channel from ch 100m to 250m Near St Antony s church Ooruttukala in Neyyattinkara Municipality General Civil Work
2026_Irrig_840648_1
IRR/IA/TR/3113/2025_5_1_1/1
Open Tender
Civil Works - Others
180 days
Thiruvananathapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹50,000
21 May 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
28 Feb 2026
25 Feb 2026
Estimate
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1417227.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 1.81 MB
BOQ_1417227.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid