| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.0 L+₹18,993.89 (5.00%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹3.8 L
EMD Value
₹9,500
Closing Date
28 Feb 2024, 6:00 pmClosed
Assistant Engineer
O/o Assistant Engineer, LSGD section, Pazhayannur0
Pazhayannur Gp Annual plan 2023 - 24 ,Proj No S0270/24,Construction of New Check dam
2024_LSGD_661926_7
054/2023-24
Open Tender
Civil Works - Bridges
Item Rate
840 days
Pazhayannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹840
Yes
₹9,500
Yes
28 Oct 2024
21 Feb 2024
1 Mar 2024
21 Feb 2024
28 Feb 2024
21 Feb 2024
Amount
Construction of check dam
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD336325/2023-2024:Bailing out water using pump above 5 HP and up to 10 HP bailing out water with engine and pump set above 5HP up to 10HP , including conveyance to site and erection ,cost of fuel ,lubrication oil and other stores ,pay of staffs etc complete
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.3:Supplying and fixing structural steel channel ISMC 75X40mm for holding shutter planks including cutting ,hoisting fixing in position with material and labour charges etc complete
OD336165/2023-2024:60.63.2 FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers.
pk krishnadas
Bidder Name
ROY K M
pk krishnadas
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_1026041.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .