| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC | ₹1.1 Cr | 1 | Accepted-AOC AGREEMENT EXECUTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical higher rate |
Tender Value
₹1.1 Cr
EMD Value
₹50,000
Closing Date
3 May 2018, 3:00 pmClosed
SUPERINTENDING ENGINEER
Kochi Municipal Corporation Park Avenue Ernakulam, Kochi 682011
Renovation of Peruvelithodu,Karuppally thodu and Punathil padam thodu
2018_LSGD_201632_1
Kochi Municipal Corporation ISO/MOE6/013976/18
Open Tender
Civil Works - Canal
Item Rate
180 days
Ernakulam
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
Yes
online
₹50,000
Yes
5 Aug 2021
20 Apr 2018
5 May 2018
20 Apr 2018
3 May 2018
20 Apr 2018
Amount
Earth work
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.60 : Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
RCC work
od319361/2017_2018 : R.C.C. 1:1.5:3 including formwork but excluding reinforcement for precast RCC slab
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Stone work
od319362/2017_2018 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level without bond stone.<br>Cement mortar 1:6 (1 cement : 6 coarse sand)
Steel work
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars
Miscellaneous
od299460/2017_2018 : Providing and fixing Rcc pile upto floor level precast cement concrete string or lacing courses,copings,bed plates ,anchor blocks ,plain window sills,shelves,louvers,steps,stair cases etc...including hoisting and setting in position with cement mortar 1:3 ,cost of required centering complete
50.2.3.1 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
od319363/2017_2018 : Putting up cross bunds with bottom width 1.5mand topwidth 1m ,height 1.5m with bamboopost at 60cm c/c and hori 1/4 split bamboo reepers tied with coir yarn ,binding wire and screening with doubleplated coconut cadjan leaves and filling inside with puddle clay (excavated from thode) and dismantling the same after usage etc complete
od299466/2017_2018 : Man Mazoor for replacing and placing RCC slab in position
od319364/2017_2018 : Engaging mancoolie
De-Silting
od317306/2017_2018 : Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in or under water for de silting the canal as direction by the Engineer in charge (DSR 2.6.1+2.24.1)
sethu korath
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_264496.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .